Loading…
Loading…
13,564 results • Best match
Investigation work for the development of IWT canal - foot bridges
DEPOSIT-Irrigation Projects 1, CE Office, Westhill, Kozhikode -Supply and Installation of Biometric Punching System -General Electronics Work
MI Class II Works-Repairs and Renovation of MI Structures for the year 2017-2018-Construction of Check dam across Varattayar river at Chembanthodu (Nanjamal System) in Eruthenpathy Grama Panchayat in Palakkad District.
Annual Plan-Project 139/23-24-Cleaning of canals within municipality Thumpoly, ward-1 - General Civil Work
IRRIGATION CANAL BUND NIRMANAM,PARAKKADAVU SOUTH MULLAKKAL BHAGAVATHI KSHETHRAM ROAD NIRMANAM, SOUTH MAMBRAPARAMBIL ROAD NIRMANAM,KADUVELI DIVERSION CHANNEL CONCRETING, LAKSHAM VEEDU ROADSIDE CANA NIRMANAM etc.(W-11
Retender RIDF XXV-Reviving Rice Farming in Fallow Lands of Chengannur LAC-Augmenting irrigation and Drainage Facility- RCC Canal Extension at Iramalikkara Padasekharam in Thiruvanvandoor Grama Panchayath
BSP_Construction of Peral distributary from Ch_590m to 1290 m including CD Works
GENERAL-CSM 2024-25-Urgent Removal of obstructions in LBMC from Ch 29/300km to 40/ 900 Km and kondayoor branch canal - General Civil Work
GENERAL-CSM- 2023-24-Urgent Removal of obstructions in LBMC from Ch 29/300km to 40/900 Km and kondayoor branch canal-General Civil Work
Annual Maintenance of Canals
Improvements to canal inspection road
Clearing jungle Clearing grass Earth work excavation Engaging man madoor for canal cleaning
Restoration of janasakthi club - Darmodayam canal road in div 21 Elayavoor zonal
anualmaintenancework of canal
BSP Construction Kappumkunnu Distributary Ch 1500m to 1620m Including CD Works Chainage as per new alignment
Irrigation Pumpset with accessories
A.D.S M.L.A(2019 20) Thrithala Constituency Reconstruction of canals of Koodallur LIS in Anakkara Pyt.
Construction of Canals on Ayaparampu Kadavu-Kuttiyil Jn road as part of waste disposal activities
GENERAL-MP-Annual maintenance-2024-25- Ethanur, Kakkayur and Koduvayur branch canals.-General Civil Work
SO 214/21 Construction of Canals on various roads to prevent flooding in Cherpu GP
PSM-Annual maintenance of Nadathara,Kalathode and Chiyyaram Branch Canals for the Year 2019-20
MIRPA- Revamping of LI Schemes 2021 -22-Maintenance of canals under Kundoor and Vanchipurathazham LIS.
ALAPPUZHA MUNICIPALITY- 155/22- CLEANING VARIOUS CANALS OF ALAPPUZHA MUNICIPALITY-CHIRAPARAMBU THODU CLEANING-POOMTHOPPU WARD
GENERALPothundy Project 202627Canal cleaning works of Thekkethara, Malakkulam, Cheruvanchipadam, Anakkappara, Chelluvadi and Mudappallur branch canals
Annual Maintenance of branch canals
Annual Plan-Pudukkadu GP 2022-23 Pro.No.246/23 - Kundukadavu Lift Irrigation Pipe Line Extension-General Civil Work
GENERAL-.-Rectification of the damaged portion of the second aqueduct in the thudikkal Lift irrigation Project -Phase 1
GENERAL-IIP-KKTY/Improvements to culvert/24-25-Improvements to culvert at starting of Azhakam br canal-General Mechanical Work
GENERAL-KyIP CADA 2026-27-Renovation and modernisation works to Perode distributary between Ch0-150 km -Ch 2-000km and kodenchery distributary near Ch2-000 km-General civil work
GENERAL KIP Rectification work of Vancheeswaram Distributary Rectification and maintenance work in Vancheeswaram Distributary between Ch 0 m and 450m and maintenance of well at ch 620m General Civil Work
canal work
canal work
Restoration of kandankulagara canal road in div 22 Elayavoor zonal
MOOLATHODU IRRIGATION PROJECT
VALIPARAMBHU IRRIGATION SCHEME
GENERAL-MP-LBC- KS-2023-24-Annual maintenance of Kunissery 1, Kunissery 2, Kunissery3 and Pallavur no2 sub canals for 2023-24 second crop and 2024 first crop General Civil Work
Annual maintenance of canals Clearing jungle of Canals Chavara Pattathanam minor Chavara Minor Thlamugal minor and all other minors prior to water distribution in 2024 2025 under the jurisdiction of KIP LB Section No20/13, Kollam
GENERAL-KyIP-ACP (NP) 2025 26-Urgentworks for Jungle Clearance and silt removal of Naduvathur branch canal from ch 00 000 kmto 06 000 km and its Dty canals Cheruvannurmuyipoth AvalaVilayattoor distributaries fromch 00 000 km to tail end General Civi
MP LBC Urgent rectification works to L B main canal from Ch.0.300km to 20.200km and its branches for maintaining canals, engaging pump operators and assistants to pump house and Urgent repairs to pumps and motors for maintaining the water distribu
GENERAL PSM 2024 25 Monsoon Preparedness RBMC and branch canals Removal of slipped earth clearing of canal block during heavy rain cutting and removal of falling trees and trees are in dangerous condition for the year 2024 25 General Civil Work
DEPOSIT KIP RB Concreting of Moothantevila Junction KIP Canal Road- Kollaka distributary ch 6300 in ward 3 of Panmana Grama Panchayath General Civil Work
SDRF-CPP-Nurnee system-Rectification of nurnee main canal between ch.1/590km and ch.6/260km
REFER TENDER DETAILS
refer tender documents
CHECKDAM MAINTENANCE
Motorshed completion
road work
This work is proposed to remove the accumulated silt and debris at the earliest so as to ensure sufficient flow in Vayyattupuzha Chittar Thodu near check dam Cum bridge portion before upcoming monsoon
Monsoon preparedness Cutting of Trees in various canals under Adoor Sub division for the year 2024 2025
Annual Maintenance of Canals