Loading…
Loading…
13,566 results • Best match
GENERAL PSM Annual maintenance of Amballur branch canal from Ch0 000 to 1 4 6 0 0 f o r t h e y e a r 2 0 2 2 2 3 IRR IA FL 3664 2022 General Civil Work
checkdam
Deepening of MM canal reach I and Thamaravalayam, Construction of EngineThara - 1 No. (Thekke Puncha padam), Construction of Engine Shed 5 Nos (Gramasree -1 No., Thekkepunchapadam - 1 no, Moorikole- 1No, Thalikonam- 1 No, Thadampattu - 1 No.).
GENERAL WP CSP CADA 2025 2026 Modernization of Field channal offtakes from the ch 0 275 km RHS of Pudussery canal in between ch 0 000 km to 0 300 km 2880 2025 General Civil Work
Anual Mace Remvl of floating bodies 2023 24 KIP LB Anual mace of canals removal of floating materials and other debris from canals under the jursdctn of sn28 19 Kottiyam in conction with water distrbtion during the year 2023 24Gnrl Civil wrks
MVIP-Removal of slipped earth near ch . 700 M, Ch. 4600 M to Ch. 4650 M, and between ch 7300 m and CH. 7500 M.of Ettumanoor Branch canal
MP-LBC - Desilting of LBC Branch canal in Municipality area, Puthur branch canal from 0.000km to TD, Kodunthirapully branch canal from 0.000km to 7.000km, Edathara branch canal from 0.000km to 3.850km, Pirayiri branch canal from 1.200km to 5.200km, c
CSIND-Upgradation of Chayakkada boat Jetty in Kottayam -Alappuzha boat route canal in Kottayam District
DEPOSIT-GPS - I- RBC - 2025- 2026 - DISTRICT PANCHAYATH - PALAKKADAnnual maintenance of CADA Canals- Various Field boothi canals and Field canals under RBC Irrigation Section, Oottara, Kollengode for the year 2025-2026
Rectification of canal
GENERAL CPP MRBC Annual maintenanceof leading canal from Chamaneri to ISD farm check dam of Kozhinjampara panchayath Forthe year 2024 25 General Civil Work
GENERAL-MP-LBC-PS-Annual maintenance of LB main canal between the Ch0.300 to Ch20.000Km for 2023-24 Second crop and 2024 first crop and Construction of temporary weir at the downstream side of Head Sluice of Kodunthirapully Branch Canal, Urgent
MI-Class II- Construction Salt Water Extrusion Sluices in Canals Connecting to Blangachalthodu in ward no 18 of EriyadPanchayath .
GENERAL-KIP Annual Maintenance 2023-2024-KIP Annual Maintenance of canals -Pathanapuram distributory and Edathara ditributory-General Civil Work
Cleaning various Canals of Alappuzha Muncipality/ Pr.155/ward 32 HB padam Edathodu, Elayil Bhagam Edathodu in Valiyamaram Ward
Pr. 155/22 ,CLEANING VARIOUS CANALS OF ALAPPUZHA MUNICIPALITY- CHELLATTU TO KAAVI THODU, SHIVAN KOVIL TO KAAVI THODU - A.N.PURAM.
NIP-Restoring clogged tunnels, cut and covers, slabs, wells and siphon etc of various canals under channel section pallichal
Annual Maintenance of Mekkad Thuruthikkara Neduvannur and Kaithakkattuchira LIS for 2022 23 including cleaning of suction pit and canals
GENERAL-KIP Annual Maintenance 2023-2024-KIP Annual Maintenance of canals -Punalur distributory and Thalachira distributory .-General Civil Work
Alappuzha Muncipality-Proj No155-Cleaning various canals of Alappuzha Muncipality-Mangalam smasanam east to kalappura temple - Ward No 51
Annual maintenance and removing floating materials from the canals
K.I.P(L.B)Main canal - Urgent Rectification work of main canal
MAIN CANAL-Rectification of damaged canal bed and side lining
Canal lining
IWT- CONSTRUCTION OF A ROAD BRIDGE WITH FOOT PATH ACROSS BADAGARA - MAHE CANAL AT VENGOLI IN KOZHIKKODE DISTRICT
IWT Sector- Construction of a Lock cum Bridge across Badagara-Mahe Canal at Karingali Mukku in Kozhikkode District.
GENERAL KIP RB Urgent rectification works from Ch 700m of Muthupilakkad Minor Distributary General Civil Work
GENERAL KIP LB Rectification of Kalluvathukkal minor distributary betweeen Ch 2150 2200 m General Civil Work
GENERAL KIP LB Rectification of Kalluvathukkal minor distributary between Ch 1935 2000 m General Civil Work
Annual maintenance and clearing and removal of floating bodies for one year
Rectification of Irrigation Canal/Structures
Engaging Labour for smooth flow of water during distribution in canals under section 2 Perambra
Engaging labor for smooth flow of water during distribution in KBC and its sub canals
GENERAL KPIP AM 2026 27 Jungle clearance Silt removal and canal cleaning works for Kulappully canal Kailiyad north canal and Kailiyad south canal for the year 2026 27 General Civil Work
GENERAL KPIP AM 2025 26 Jungle clearance Silt removal and canal cleaning works for kulappully canal Kailiyad north canal and kailiyad south canal for the year 2025 26 General Civil Work
GENERAL EKC Annual Maintenance 2025 26 Running Contract Removing water hyacinth and waste, Clearing jungle and other reformation works in E K Canal in Kozhikode Corporation General Civil Work
Materials required for construction of check dam BOQ Attached
Protecting eroded left abutment portion of Cheruthuruthy check dam
Construction of side protection works, construction of check dam
Manitenance works to Kombanpara Check Dam in Pariyaram Gp
CANAL CLEANING WORKS UNDER PANCHAYATH AREA MP LBCEMERGENCY CANAL CLEANING OF EDATHARA SUB CANAL BETWEEN CH 3.850KM TO 8.100KM General Civil Work
Cheramangalam Scheme - Urgent rectification works to canal sluice shutters to main and branch canal, maintenance of Vadakethara canal shutter and river shutter.
BUDGET WORK 2020 21 Providing 30mm close graded chipping carpet in Karvaoor vazappara canal road ch 0 00 to 12 800 in pathanapuram LAC
Rectification of canal
Urgent rectification works to Pothady branch canal between ch.4/625Km and 4/750 Km of Themparamadakku System
Annual maintenance of main canal
Rectification of LBMC from ch 22/950 km to ch 40/900 km and branch canals
MP LADS 2024 25- Sri. Elamaram Kareem Hon39 MP RS Installation of High Mast Light near Avadukka aquadate of Kuttiyadi irrigation Project Canal road in ward 7 Changaroth Grama Panchayath General Electrical Work
Construction of Canal Bund Bye road Protection wall and Periyarvally canal bund Road
MP LBC Lining works to Perinkunnam No.1 branch canal of Chulannur canal