Loading…
Loading…
13,567 results • Best match
Earthwork CC 136 RCC 124 Plastering
earth work , CC 124, etc
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance of water through the RBC canals to the paddy fields during this year 2025-26
It is necessary to run a routine maintainance and repairs to motor and pumpset to keep them in running condition.
RENOVATION OF L I
Canal lining
canal extension works
Right bank canal (RBMC) starting from Malampuzha Dam 0/000 Km is up to 32/000 Km long and having main branch canals such as Puthupariyaram
The work is proposed for the cleaning of RB main canal and Chemmanthodu branch canal for water distribution.
Deepening and Desilting Canals.
This estimate is for the maintenance of the Chulannur main canal. This estimate includes removing silt, grass, light jungles etc from canal using Man Mazdoor and Hydraulic excavator for ensuring free flow of water during the distribution for the
Irrigation work
CSIND-Improvements of Feeder canal (National water way 3 ) - Ambalappuzha Canal connecting Pookaitha river and TS canal- (Reach 2) from near RSS Karyalayam to TS Canal in Ambalappuzha south Panchayath in Ambalappuzha L.A.C
GENERAL-AM 2024-25 Anamooli MI Class 1 Scheme AM works to RB main canal, Thenkara branch canal and Melamuri branch canal of Anamooli canal diversion scheme in Thenkara GP -General Civil Work
GENERAL-Plan Cheramangalam scheme 2025-26-Improvements and urgent rectification work to canal shutters Erakkulam branch canal 1st reach Main canal shutters Vadakketara branch Head regutator Main canal tailend shutter.-General Mechanical Work
Removal of floating bodies lubricating and shutters etc from various canals under KIP O M Section No 12-3 Bharanikavu
Annual Plan-CHALAKUDY MUNICIPALITY (2023-24) CLEANING OF PUBLIC CANALS BEFORE PREMONSOON-WORKS TO WARD 1-36 PRO.NO 160/24
Annual Plan-ONGALLUR GP-2023-24 SHUTTER INSTALLATION FOR CANALS IN VARIOUS WARDS - WARDS 15-17-18-19 S0318/24
GENERAL-KIP-Annual Maintenance of canals 2023-24-RBMC from ch 34320m to 43000m during water distribution.-General Civil Work
Deposit work Irrigation Dismantling and Temporary divertion of existing pipe linesbefore the reconstruction of Culverts and Permanent laying of pipe line after thereconstruction of the Culverts along AS Canal at 4 locations under PH Sub Division
GENERAL PSM Annual maintenance of Kolazhy Thirur Kuttur Velappaya Perinchira and Uthramkulangara branch canals for the year 2024 25 General Civil Work
GENERAL PSM Annual maintenance of Kolazhy Thirur Kuttur Velappaya Perinchira and Uthramkulangara branch canals for the year 2023 24 General Civil Work
GENERAL KIP(LB) Repairs and maintenance to Shutter at Kareepra Offtake Ch 3970 of Pallimon Distributary General Mechanical Work
Engaging Labours for smooth distribution of water through the canals under the jurisdiction of section 1Vadakara
SDRF-Repairs to canal of PaulSoosa Canal system near Anachal in Eruthempathy Grama Panchayath
MPLBCRectification works to the canal between ch 22.100 to 22.200km of Kurissi Pampadi canal
SDRF-Repairs to canal of PaulSoosa Canal system near Chembanthodu in Eruthempathy Grama Panchayath
SDRF-Repairs to canal of PaulSoosa Canal system near Kountankalam in Eruthempathy Grama Panchayath
PERIYAR VALLEY CANAL ROAD KATTADITHAZHAM RAILWAY LINE ROADGANDHI NAGAR CANAL LINK ROAD - WARD 4
GENERAL Maintenance of Canal Office Kollam Maintenance of Canal Office Kollam General Civil Work
Urgent rectification of Kodumon distributary from Plavelil junction to aqueduct in ward no 2 of Kodumon Panchayath between CH.2913m and 3250m
Deepening and Desilting Canals, Construction of Engine shed -5 Nos
SDRF KIP LB Subdivision No19 Kottiyam Rectification work in the Pallimon Distributary in Ch 2600m to 3360m
MVIP Kuravilangadu Distributary Annual Maintenance From ch.0m To 10465m For The Year 2022 2023 Kuravilangadu distributory
GENERAL_BSP Peral Distributary_BSP_Construction of Peral distributary from Ch_252 m to 590m including CD Works _General Civil Work
NABARD KPIP Construction of side protection wall for Ottapalam distributary between Ch 2/000km to 2/300km
Annual Maintenance of Cherukunnam distributary from ch 0 m to 9850 m for the year 2022 23
Rectification of canal
This estimate is for the maintenance of the Kurussi pampadi canal. This estimate includes removing silt, grass, light jungles etc from canal using Man Mazdoor and Hydraulic excavator for ensuring free flow of water during the distribution for
Maintenance
Eart work cc124,etc
construction
LAC ADS Construction of Protection wall and road concreting work for the canal Bund road from Kaniyankavila mukku to Kaduthai Ela From Edavanassery Minor Distributary offtake in Sasthamcotta Grama Panchayath
Revamping of existing Minor Irrigation scheme(Class I and II) Revamping of BCR across Kuttikkol river at Vadakkanchery in Kurumathur Panchayath, Kannur District
IIP - Main canal-Repair and restoration of damaged canal lining between ch 25900m-26000m
Water Harvest Strcture Cement Concrete Check Dam RCC Farm Pond
Urgent protection work near Kombanparakadavu check dam in Pariyaram panchayath
Marangattu SC Colony Irrigation Project
Engaging labour during water distribution to remove floating wastes from trash guard at various nets of the canal