Loading…
Loading…
13,585 results • Best match
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance ofr through the RBC main canals to the paddy fields during this year 2025-26 and this work needs to be executed prior to water distribution
Deposit 2024-25-(Koyilandi muncipality) Construction of Ambramoli canal -Kakkadu roadin kanayancode dty canal between 0/050km and 0/150 km
GENERAL MP LBC MS ANNUAL MAINTENANCE 2022 23 MP LBC Urgent Rectification works to the weak and vulnerable portion of canal between ch 15.790 Km to 15.840 Km flume type canal encasing and top Grill of Peringottukurussi canal
LAC ADS KIP LB Construction of canal road Kottiyam Branch Canal Construction of canal road between Ch 1930 m to Ch 2080m Madankavu Perinjelil Road in Elampalloor Grama Panchayath Ward 8 in the Kundara LAC General Civil Work
GENERAL KS ANNUAL ACTION PLAN 2022 23 MP LBC Urgent Rectification works to the weakand vulnerable portion of canal between ch.6/920 km to 7/000 km of Odanur branch canal of Peringottukurussi canal General Civil Work
GENERAL MP LBC KS URGENT BRANCH CANAL CLEANING WORKS 2022 MPLBC Urgent canal cleaning works of Kunissery branch canal from ch 0.000km to 2.800km for 2nd 2022 23 and 1st crop 2023 24 water distribution. General Civil Work
GENERAL Pazhassi Irrigation Project PyIP Rectification work to damaged UT and Foot bridge near Ch 14 900 Km and Construction of leading channel to the UT near Ch 15 500 Km at Pattiyam in Mahe Branch Canal for the year 2023 24 General Civil Work
Budget Work- 2021-22 Improvements to Mills Canal from Canal bridge towards north to Vayalar Kuryamuttom kayal in Ward No.3 of Cherthala Municipality of Cherthala LAC
Renovation of Malakam coconut nursery and providing irrigation facilities
GENERAL PSM Improvement works to Thanikudam distributory canal between Ch 1 400 to1 700 Km General Civil Work
GENERAL PSM Improvement works to Thanikudam distributory canal between Ch 2 700 to2 900 Km General Civil Work
KIP LB Urgent leak rectification works of flume in Oyoor distributary near Panayam temple between ch 600 m and 800m in pooyappally grama panchayath
GENERAL-KPIP-AM-2025-26-water distribution works through RBMC and Clearing jungle, Silt removal, water distribution works through Arakurissi distributary-General Civil Work
DEPOSIT KPIP Maintenance work between CH 0 750 km to 0 850 km of Pulapatta distributary for the year 2024 25 General Civil Work
DEPOSIT KATTOORKUZHY Deposit Construction of culvert across KIP Nediyapadam south distributary at Kattoorkuzhy mathma bridge in Sooranadu north Panchayath ward 12 General Civil Work
CSM 2022-23 Annual maintenance B/W ch. 25/000 km to 29/300km including silt removal of cut and cover U/S portion
GENERAL-CSM 2022-23-Annual Maintenance of LBMC from Ch. 11/100 km to Ch. 17/500 km for the year 2022 - 23-General Civil Work
GENERAL-CSM 2022-23-CSM- Emergency Monsoon Preparedness - Urgent cutting and removal of trees at different places of LBMC between 0/000km to 22/950km for the year 2022-23-General Civil Work -1
GENERAL-CSM 2022-23-Annual Maintenance of LBMC from Ch. 6/050 km to Ch. 11/000 km for the year 2022 - 23-General Civil Work
GENERAL-CSM 2022-23-CSM- 2022-23Annual maintenance B/W ch. 29/300 km to 34/600 km including silt removal of cut and cover D/S portion.-General Civil Work
GENERAL-CSM 2022-23-CSM Urgent Rectification works to LBMC between ch.10/300 km to 10/500km-General Civil Work
GENERAL-CSM 2022-23-Annual Maintenance of LBMC from Ch. 0/000 km to Ch. 6/000 km for the year 2022 - 23-General Civil Work
GENERAL-CSM 2022-23-CSM - Removal of obstruction in LBMC from Ch. 0/000 to 22/950 Km for 2022-23 -General Civil Work
GENERAL-CSM 2022-23-CSM Urgent Rectification works to LBMC between ch.17/600 km to 17/650 km-General Civil Work
GENERAL-CSM 2022-23-CSM-Annual Maintenance including engaging Electrician, Mason, Manmazdoor etc. of Cheerakuzhy weir for 2022 - 23-General Civil Work
,clearing work and engaging labour for water distribution through the main canal ch.16/000 km to 27/000 km and engaging labour for waste removal during water distribution through the Parlikkad and kuranchery branch canals are included .
Construction of Open Well, Pump House, Irrigation Systems and Land Development
Annual Plan Mathur GP 2025-26 KAPPIKKAD CANAL ROAD CONCRETE P.NO-104
Urgent rectification works for preventing leakage of UT at ch 3 800km and aqueduct outlet transition of Kizhakkambalam Major Distributary
CPP Nurnee Alamkadavu Nurnee System Non plan 2023 24 Removing floating bodies and weeds in Nurnee Alamkadavu main canal and branch canals, Nurnee main canal and Vilayodi branch canal and engaging labours for various works
clearing and removal of floating materials and heavy blockages
Rectification works to Malakkara branch canal between ch 1500m to 2000m and Kurichimuttom aqueduct of Malakkara branch canal
reconstruction of damaged canal lining
Rectification of Thiruvalloor branch canal
Improvement of canal inspection road
Improvements to various canal roads
Rectification of Thiruvalloor branch canal
Canal slab and footpath Construction
Annual maintenannce of canal
Removing the Plastic waste,floting waste and other accumulating waste near the bridge abutments, Nets, Shutters etc. through out water distribution.
NIP providing canal sluice shutters at various location of LB and RB ch 0m to 17000m
ANNUAL PLAN PANAMARAM BP 2025 PRO NO 58 DRAINAGE NEAR KAMBALAKKAD CANAL AREA IN KANIYAMBETTA GP
Cherthala Municipality/20-21 Meals Canal road re tarring in Wd3Cherthala Municipality/20-21 Meals Canal road re tarring in Wd3
canal works
canal work
Canal maintenance
canal work
canal works
canal works
canal work