Loading…
Loading…
3,686 results • Best match
Repair work of Canal of Aloud Tank and Dungariya (Usri) Tank in Tehsil and District Narsinghpur
Repair, maintenance and painting of 29 canal gates of Bundala medium project under multai division Betul
Repairing, Oiling and Greasing of Hanuman Tank, Mama kaTank, PS canal and Pehsari Dam Gates Gwalior
Opening and Closing M.S. Shutters of 7 Stop Dam and Barrage Paras Canal Sub Division Bagli
Repair and Maintenance with servicing of canal gate at different chainage of LBMC Barna dam bari
Repair and Maintenance with servicing of canal gate at different chainage of LBMC Barna dam bari
Repair work of kudari disty and TLBC main canal ch282 to 940 of sanjay sarover project
Opening and closing work of stop dam barrage gate under datuni canal sub division kantaphod dewas
Anticaries and anti sensitivity M W stannous fluoride and potassium nitrate, Wet mouth artificial saliva mouth rinse, Sodium hypochlorite 2 percentage solution for root canal, Hydrogen peroxide 3 percentage solution, Interdental brush pkt of 05, ... root canal , ... root canal , ... root canal dressing ...
11 KV line 11 KV DP 25 KVA Xmer and Road Crossing
Repair and maintenance of 28 Nos.Sluice gates of 17 minor and 1 No. Medium irrigation tanks under Sub-Division Betul-
Provide and fixing of MS Protection Net (Grill) of sluice well of irrigation Tank in kesla Trible Block (Second Call)
Pre-mansoon repair work and maintenance of 2nos sluice gates Sapna medium irrigation tank under subdivision Betul WRD Dn. Betul
Work of Line Loss Reduction 11 KV Irrigation Feeder Bichhrod, DL Feeder Ghatiya of Ghatiya DC under OnM Division Ujjain
Repair and Servicing of H.R. Gates of Miners of Khajuri Distributory ( 0 Km to 15 KM) (M1-1.651 KM, SM4- 3.4 KM, M2-3.13 KM, M3-5.74 KM, M4-6.42 KM, M5-14.98 KM) of ISP Main Canal RD 174.425 KM under ND Division No 27 Rajpur at ND E/M Sub Division no
Repair maintenance and painting of 28 canal gates of chandora medium project in division multai district Betul
Premansoon maintenance of intake well gates 6nos of Tawa RBC system under pipariya Branch Canal Divivion Sohagpur.
Repair and Maintenance of CR canal gate at ch-42 of D1 of RBMC Barna dam Bari.
Dismantalling and Re-erection of canal gates of the Tawa Project Div itarsi during year 2023-24
Rewiring and Lightning arrangement of office of The EE WRD Barna Left Canal Division Bari (Second Call)
Repairing and maintainance of Baswa distributry branch and minor sub minor at its structure of ISP canal
Job contract for earth filling along side of CW discharge canal to stop seepage at Juari village
Repair and maintenance work of high mast light of left and right bank canal of Tawa Dam
Bridge Repair work
Reconstruction of damage fall of Mohari minor of Misrod dist. At ch. 19, ch.36, and ch.62.
Reconstruction of Fall of Ch- 73 and 89 in Chandwad Minor of Misrod Dy. Of TLBMC (A.R.WORK)
Repair of C.C. Lining bitweenw Ch- 00 to 375 of Misrod Dy. And Ch-00 to 380 of Choutlay Dy. Of TLBMC. (A.R. WORK)
Repair Work of VRB at ch. 52 of Jeejalwada minor, VRB at ch. 120 and VRB at ch. 180 of Satwasa Distry.
Reconstruction of Fall at chain 69 of Babri minor of Makdai Distributory.
Repair of fall at ch. 8 of Jamuniya Minor of TLBMC.
Construction of Chain link fancing (Boundary) at tawa project colony seoni malwa .
Reconstruction of damaged fall At ch. 13 of mohari minor of misrod distry
Write off of old/unserviceable material under store of Makdai,Bhiladiya,Raigarh and Misrod Dy. Sub div. Seoni Malwa and Dolariya.
Reconstruction of 01 no HR and 03 no Fall at Kahariya Minor TLBMC.
Estimate for Earth work b/w Ch-1752 to 2120 and Ch-2160 to 2548 Of TLBMC.
Repair of C.C. Lining of Ch- 115 to 118 of Raigarh Dy. Of LBMC. (A.R. WORK)
Reconstruction Work of D/S Retaining wall of HR of seoni malwa minor, Jamuniya minor and 21 L Minor Of Makdai Distry.
Rain cut filling from Ch-2120 to 2160 Of TLBMC. (A.R. WORK)
Repair of DRB at ch 194, VRB at ch 254, VRB at ch 306 of Makdai Distributory and chain 03 of Seoni Malwa minor.
Earthwork at Satwasa Dy. Ch. 50 to 115 , Choutlay Dy. Ch.270 to 290 and Misrod Dy. Ch.180 to 200 of Misrod Disty.
Earth work Repair of rain cuts of LBMC between Ch. 2569 and Ch.2881
Construction Boundary wall at tawa project colony seoni malwa south side of EE banglow.
Reconstruction of C/R and H/R Wing/Retaining wall at Ch. 143 Of Makdai Distry.
Reconstruction of HR of Ch-78 at Dhamainiya Minor and Ch-173 at Chabora Minor of Raigarh Dy. Of TLBMC.
Repair of HR of 32 R minor of Makdai Dy. Of TLBMC.
Earthwork for 7R Minor Ch. 30 to 40., 15 R minor Ch 15 to 25 , 14 L minor Ch. 20 to 40 , 17 L minor Ch. 30 to 60 , Khapriya minor Ch. 50 to 80 and Makdai left Bank Ch. 220 to 240 of Makdai Disty .
Barrel clearance of C.D. structure at Ch.2706,ch. 2716, ch. 2730, Ch 2768 and ch.2788 of Tawa LBMC.
Reconstruction of HR of Satwasa Minor No 1 and Satwasa Minor No 2 of Jeejalwada minor at Ch. 181.
Reconstruction of damage fall Ch.07, Ch.19, and Ch.29 of Khapriya Minor of Makdai Dy.
Reconstruction of 03 no Fall at Chandpura Minor of Bhiladiya Dy. Of TLBMC.