Loading…
Loading…
1,26,686 results • Best match
Repairs to 750 KVA - 11000/433V Transformer at Kandakurthi Lift Irrigation Scheme Stage-I, Kandakurthi (V), Renjal (M), Nizamabad (Dist)
Operation and Maintenance of Pusugudem Lift Irrigation Scheme on Murredu vagu near Pusugudem (V), Mulakalapally (M) of Bhadradri Kothagudem District
Operation and Maintenance of Lingapuram Lift Irrigation Scheme on Chinna Gubbalamangivagu near Lingapuram (V), Dummugudem (M) of Bhadradri Kothagudem District.
Annual Maintenance estimate for Operation and maintenance of 3 Stages of Chagalnadu Lift Irrigation Scheme for the Year 2019-20
Emergency Repairs to Nainpaka Lift Irrigation Scheme on Morancha Vagu near Nainpaka (V) in Chityal Mandal of Jayashankar Bhupalapally District.
Operation and Maintenance for fixing of New Window Glasses at all three stages of Alisagar Lift Irrigation Scheme Nizamabad Dist
Operation and Maintenance of Alisagar Lift Irrigation Scheme - Sub estimate for repairs to Lighting, Borewell three stages of Pump House.
Estimate for Pump Repairs of Mattampally Lift Irrigation Scheme on Adda vagu near Mattampally (V&M), Suryapet District (2nd Call)
Repairs to Leading Channel of Yerragattu thanda & Choutapally Lift Irrigation Scheme near Gundlapally (V), Matampally (M), Suryapet District (2nd Call).
Emergency Repairs to Morancha Lift Irrigation Scheme on Morancha Vagu near Morancha (V) in Bhupalpally Mandal of Jayashankar (Bhupalpally) Distrcit
Operation and Maintanance of Ringireddypalli Lift Irrigation Scheme on Pamuleru vagu near Ringireddypalli (V), Mulakalapally (M) of Bhadradri Kothagudem District
Restoration of Bhaktha Ramadasu Lift Irrigation Scheme Pump House and Pressure Main at Erragadda Thanda(V), Kusumanchi (M) Khammam District
Designing, providing, fitting, installation, testing and commissioning of star delta starter along with allied works at Lift irrigation station, Mandli.
Supplying ,Installing , testing and Commissioning of D.G. Set 50 KVA at. Talodhi Mokasa Lift Irrigation Scheme ,Tah ,Chamorshi , Dist. Gadchiroli
Repairs to 5 cusec discharge x 17 meter pumping unit I along with allied works at lift irrigation station Burejal.
Urgent mechanical works to be carried out at lift irrigation scheme Sagipora, Unisoo New and Gangbugh 1st of MISD Handwara.
Fabrication, Providing and fitting of M/s door at Lift Irrigation Cum Dewatering Scheme Gunde Ibraham of MISD Pattan. (Fresh).
Repairing of 10 cusec M and P Make pumping unit at Lift irrigation Scheme KP Bala new of MISD Pattan.
Rewinding to 50 HP, 04-pole, 03-phase squirrel cage induction motor at lift irrigation scheme Chitterhall of MISD Handwara.
Mechanical work to be carried out at Lift Irrigation Scheme Nowshera, Gantamulla, Kanispora Khadniyar and Janbazpora of M ISD Baramulla.
Parwan Lift Irrigation Scheme ki LMC ki RD 11000 se 13000 tak service road par quarry rubbish bichene ka karye
Reconstruction of supply channels of Lift Irrigation Scheme Ismailpur Main Branch RD 400 to 700 Mtr at places Part-B.
Replacement and Repairs to Rising Main and Distribution system of Ramgiri Lift Irrigation Scheme Manapur on PLBC of Pench Project
Repairing of forced water lubrication type Vertical Turbine Pump No.6 (650 HP) at Sondyatola Lift Irrigation Scheme, Dist. Bhandara.
Construction of Ladies Toilet and other Ancillary work at Janai Shirsai Lift Irrigation Sub-Division Daund, Tal- Daund, Dist- Pune.
Operation and Maintenance of Lift Irrigation Scheme at Vantem, Murmune, Guleli, Dhamce and Velguem in Sattari Taluka by Engaging Staff.
Upkeeping, Operation and Maintenance of Lift Irrigation Scheme at Bhom-Padeli, Bhironda and Sawarshem in Sattari Taluka by Engaging Staff.
CONSTRUCTION OF CHIEF MINISTER SOLAR LIFT IRRIGATION SCHEME AT VILLAGE- CHHOTA RANGA - 2 ,PANCHAYAT- CHHOTA RANGA, BLOCK- PATHNA, DISTRICT- SAHIBGANJ
HT/LT Electrical and Mechanical repair works at Hibdangerpora, Baghichatkak, WaduraBala and Achabal-II Lift Irrigation schemes of MISD Sopore.
E-TENDER - Annual Plan-edakkadavu-PANDANAD GRAMA PANCHAYATH-ANNUAL PLAN 2024-25 - S182/25-EDAKKADAVU LIFT IRRIGATION MOTORSHED RENOVATION CHAL
Installation of 1 no. new Mini River Lift Irrigation Scheme Solar at Bhagalpur II in Chopra block under RIDF XXX
Annual Plan NDY GP Alungalkadavu Lift Irrigation Pipeline Extension Balance Portion Ward 3 Project No 392 25 General Civil Work
Improvement/Stablization of Supply Channel and other allied works in Lift Irrigation Schemes Bardoh,Bhanara, Kah , Mannowah and Badyala Chak
CONSTRUCTION OF CHIEF MINISTER SOLAR LIFT IRRIGATION SCHEME RAJAYA RIVER AT VILLAGE- SILDAHA-SHYAMPUR, PANCHAYAT- RANIDIH, BLOCK- JAMTARA, DISTRICT- JAMTARA
Annual Plan NDY GP 25 26 Karimbadam Lift Irrigation Road Naveekaranam Wad 2 Project No 407 25 General Civil Work
Supply, Installation, Testing and Commissioning Of 60 Hp, 980 Rpm, 3-Phase Induction Motor at Lift Irrigation Scheme Mirchimer Mirgund.
Fabrication, providing and fitting of base frame and foundation block along with allied works at Lift Irrigation Station, Nikowal new.
Construction of RCC Compound wall for acquired land at Switchyard no.2 under Guruvarya Late Laxmanraoji Inamdar lift irrigation scheme
CONSTRUCTION OF CHIEF MINISTER SOLAR LIFT IRRIGATION SCHEME AT VILLAGE- CHHOTA RANGA - 1, PANCHAYAT- CHHOTA RANGA, BLOCK- PATHNA, DISTRICT- SAHIBGANJ
Stage Contract for Annual Repair and maintenance of Lift Irrigation scheme Langer/Kalsian and its distribution network including sump clearance.
Stage Contract for Annual Repair and maintenance of Dabber Potha Lift Irrigation scheme and its distribution network including sump clearance
Providing, Laying, Testing and Commissioning of rising main 450 RM in Phase-1st of Lift Irrigation Scheme Thang Ldumbur Sankoo
Annual Maintenance estimate for Operation and maintenance of 3 Stages of Chagalnadu Lift Irrigation Scheme for the Year 2020-21
Repairs to Bandi Atmakur Lift Irrigation Scheme on Galeru River in Bandi Atmakur Mandal of Kurnool District on turnkey basis
Repairs to the Yerrakaluva lift Irrigation scheme for Pump-2 at East Edavalli (V) of Kamavarapu Kota (M) Eluru District
Repairs to Bandi Atmakur Lift Irrigation Scheme on Galeru River in Bandi Atmakur Mandal of Kurnool District on turnkey basis
Annual Maintenance estimate for Operation and maintenance of 3 Stages of Chagalnadu Lift Irrigation Scheme for the Year 2024-25
Annual Maintainance of 66/6.6kv Sub Station and Pump house yard to Periyapatna Lift Irrigation Scheme the year 2025-26
Annual Maintenance of Kotabagi Lift Irrigation Scheme Stage I And II & Switchyard (110KV) for Three Years (2024-25,2025-26,2026-27)
Annual Maintenance and Operation of Munagala Lift Irrigation Scheme in Gudur (M) of Kurnool District for the year 2018-19.