Loading…
Loading…
1,230 results • Best match
Shifting of EB pole LTHT line and Transformer Along the Buckle Canal from Rajagopal nagar 1st street bridge to Annanagar 7th st bridge in TCMC
Clearing Jungle, Removal of fallen earth and debris in Chettiakkapalayam Sub Branch canal from L.S 0/000km to Tail end for the year 2026-2027
Clearing the Jungle and removal of fallen earth and debris in Parambikulam Main Canal from LS 46.000 to 52.000 Km for the year 2026-27.
Clearing jungle, Removal of earth and Debris in Poosaripatty Branch Canal from L.S 0/000 km to 5/000 km for the year 2026-2027
Providing 01 No. Borewell pump set and its allied electrical Accessories for getting irrigation water to Mulberry Field gene Bank, general Mulberry Garden at CSGRC, Hosur. (SH : Electrical Work)
Construction of(Storm Water Drain From Periyar Pathai (Annasamy Street) (Via) Bajanai Koil Street to Trustpuram Canal in Dn106 Zone 8 Dn.109 in Zone 9
Construction of SWD From Nehru Street (Via) Anna Nedumpathai Kalyanapuram Bajanai Koil Street to Trust puram Canal in Dn106 Z 8 Dn.109 Zone 9
Construction of Missing Link Storm Water Drain of Size 900X900mm at Nelson Manickam Road from Vada agaram road to Virugambakkam Canal in Dn 107 Zone 8
Providing protection wall for new road formation in Thillaiamman Odai confluence point to Khan Sahib Canal near Chidambaram Bus Stand in Chidambaram Taluk of Cuddalore District.
Z.O.IV.C.NO.B3/10749/2021 Proposed Construction of Parking Shed for BOV (Div-41, 47 and 48) at B-Canal Road in Div -41, Unit-10, Zone-04
DEMOLITION OF TOP SLAB, DESILTING AND CONSTRUCTION OF NEW TOP SLAB DUE TO BLOCKAGE OF NUNGAMBAKKAM CANAL MOUTH PORTION IN DIVISION-113, UNIT-26, ZONE 09
Construction of Shed for segragating Decomposing and Non-Decomposing materials at west Canal Bank Road near Urbesar ward Office in Division-170, Unit-40, Zone-13
Construction of Sump with provision of Regulator in Existing SWD at Srinkeri Mutt Road Disposal location of B-canal in Division-171, Unit-40, Zone-13
Improvements to the storm water drains at New Moore Market Road, Kannapar Thidal Canal AP Road, Navel Hospital Road, in Div 58, Unit 14, Zone - 5
IMPROVEMENT TO THE STORM WATER DRAIN MANHOLE DOOR RAISING AT K4 OTTERI NALLAH TO K3 POLICE STATION KOOVAM CANAL IN DN-102, U-22, ZONE-08.
Z.O. XIV.C.No.E1/4858-18/2025 CMWSSB Road cut restoration at Maniammai Street canal road CH- 741 to CH-1121 in Div 183, U 41, Z 14
Rehabilitation of Tharuvai Regulator and outlet at the confluence point of Pachaiyar River cum Flood Carrier Canal in Tharuvai Village of Palayamkottai Taluk of Tirunelveli District.
Formation of Lined Canal from Karayanchetti Eri Surplus coarse in Melathikkan Panchayat in Package No. TVM/2024-25/66 under State Scheme Savings Fund Tiruvannamalai District
Construction of Integrated storm water drain in North Buckingham Canal Watershed of Kosasthalaiyar basin in the extended areas of Greater Chennai corporation Package 35 Outfall 7
Demolition and reconstruction of Jafferkhanpet Canal at Appadurai street (from Sundaramurthy street to Kannammal street and 50m at Erikarai street) wall in Dn-139 Zone-10
Z.O. XIV.C.No.E1/4275/2024 Repair works and attending patch work at canal _near govindan nagar and kandasamy nagar_ Palavakkam in Division-183,Unit-41,Zone-14
Removal of floating matters, vegetations and other obstructions in the North Buckingham Canal using float from LS.5130m to LS.7020m (IOC Bridge) in Chennai District
Shifting of EB pole LT HT line and Transformer along the buckle canal from Pasumpon nagar bridge to Teachers colony 3 rd st bridge in TCMC
Clearing the jungle and removal of fallen earth and debries in Parambikulam Main Canal from LS.84.000 Km to 87.400 Km for the year 2026-2027.
Clearing the jungle and removal of fallen earth and debries in Kundadam Branch Canal from LS.8.000 Km to 14.000 Km for the year 2026-27.
Clearing the jungle and removal of fallen earth and debries in Kundadam Branch Canal from LS.0.000 Km to 4.000 Km for the year 2026-27.
Clearing the jungle and removal of fallen earth and debries in Parambikulam Main Canal from LS.68.000 Km to 72.000 Km for the year 2026-27.
Clearing the jungle and removal of fallen earth and debries in Parambikulam Main Canal from LS.52.000 Km to 57.000 Km for the year 2026-2027.
Clearing the jungle and removal of fallen earth and debries in Parambikulam Main Canal from LS.57.000 Km to 62.000 Km for the year 2026-2027.
Clearing the jungle and removal of fallen earth in Chinnaveerampatti Distributory and its Branch distributories, off taking from Udumalpet Canal in Udumalpet Taluk of Tiruppur District
Clearing Jungle Removal of fallen earth and debries in Senguttupalayam Branch Canal from L.S. 0/000 Km to 7/000 Km for the year 2026-2027
Painting footpath kerbs at Kamarajar Salai and Santhome High Road (All India Radio to South Canal Bank road) in Div 125 and 126, Unit 25 Zone 9
SUPPLYING AND INSTALLATION OF TRASH BOOM FOR THANIKACHALAM CANAL AT THANIKACHALAM F BLOCK 2ND MAIN ROAD AND 200 FT ROAD IN DN-30, UNIT-8, ZONE-3.
Replacement of Water Supply Main Pipeline and UGD Main line With Existing Pillur Feeder Main From Trichy Road from Valankulam Outlet to Sanganoor Canal in Coimbatore Corporation.
Z.O.IV.C.NO.B3/6732/2020 MLA Proposed Construction of Retaining Wall in Kodungaiyur Canal at Muthamil Nagar 1st Block in Div-35,Unit-09,Zone-04. (Under MLA Scheme)
Z.O.XIV.C.NO.E1/1220/2025 PROVIDING IRON POST FOR TRAFFIC SAFETY FOR GOVINDAN NAGAR BRIDGE BOTH SIDE AT B CANAL BRIDGE CROSSING IN DN-183, UNIT-41, ZONE-14
Providing and Laying of 300 mm DWC Pipeline at Nandanam 1st Main Road Connecting Lotus Colony 2nd Street and Nandanam Canal, Div.122, Unit 26, Zone 09.
Z.O.IV.C.No.B3/9308/2024 Improvement of Various location Compound wall at Captain Cotton Canal and Providing sluice gate at various location in Div-37, Unit-09,Zone-04
Construction of B Canal Disposal point MS Fabricated Open Channel Sluice Gate and Moter Room at CSIR Road Opposit side in Division-178, Unit-39, Zone-13.
Z.O.IV.C.No.B3/0540/2023 Providing Hydraulic Excavators (Poclain) EX-200 with floating for desilting of Buckingam Canal (From IOC to Korukkupet) in Div - 41, Unit - 10, Zone IV
Z.O.IV.C.No.B3/0012/2025 PROVIDING OF ROOFING SHEET FOR BOV SHED AT B-CANAL ROAD(NETHAJI NAGAR 6TH STREET BACK SIDE) IN DIV-38, UNIT-09, ZONE-04
Providing fencing for canal and pathway arrangements work for public convenience at Pachayappan Street in Div-138, Unit-28, Zone-10. (Under Ward Councilor Fund 2023-24)
Dismantling existing storm water drain slab and supplying and fixing Manhole door at Pushpavathiammal koil street canal and various streets in dn-140, unit-30, zone-10.
Proposed Construction of 1 nos of Modern Stainless Steel Bus Shelters (6mX2.5m) at South Canal Bank Road Bus Shelter in Division 126, Zone 9. (Under Councillor scheme)
Forming of Footpath Works (Kandigai Street to Alliance Appartment) and Construction of Retaining Wall with GI Wiremesh Fencing at Water Canal Road in Div-83, Zone-7.
Strengthening the damaged portion at various places of Krishna Water Supply Project Feeder Canal between LS.0.00 KM to 3.30 KM in Tiruvallur Taluk of Tiruvallur District.
Construction of Meeting hall for Farmers at Division Office campus, Mettur and Rehabilitation of Dormentry block as Meeting hall for farmers at canal subdivision office campus komarapalayam
El.D.C.No.North/6702/2022/ Conversion of 50 Nos of single Arch Bracket to 1 Mtr Single Straight Bracket at Canal Road, J.J Nagar in Div 41, Zone 4
Construction of Stormwater Drain at Arcot Road (South Side) from Vadapalani Junction to Palayakaran Street with Disposal into Trustpuram Canal in Divisions 130 and 131, Zone 10
Tirupathur District 15th CFC (Dp) 2025-26 Construction of cover slab for sewage canal near Panchayat Union Primary School in Poonkulam Panchayat, Poonkulam Village Package No.05