Loading…
Loading…
9,458 results • Best match
Detailed Topographical and Cadastral Survey Work using Drone Unmanned Aerial Vehicle UAV of Cluster 12 of Additional New Commands of Ken Betwa Link Canal in Tehsil Kulpahar and Mahoba of District Mahoba in Uttar Pradesh LOT 4
S/E for Jungle clearance, bed and slope scraping and theck/silt clearance of Left Shahzad Canal from km 0.000 to 9.500 km and Jungle clearance, bed and slope scraping of Chandro Minor km 0.00 to 2.500
Providing, installation, commissioning and onload testing of one no 1000kVA, Copper wounded, Oil Cooled 3-Phase, 50Hz, Level-02 Distribution LTTransformer for incoming 2nd line of switchyard under Rennovation of Devkali Pump Canal Phase-2 (Mardah Pum
Renewal work along with general repair of Ch. Charan Singh Canal Kanwad road (left patri) (ODR) Chainage 106.500 to 107.000, Chainage 108.000 to 110.000, Chainage 113.000 to 114.000, Chainage 117.000 to 118.000, Chainage 125.000 to 130.000, Chainag
Detailed Topographical and Cadastral Survey Work using Drone Unmanned Aerial Vehicle UAV of Cluster 11 of Additional New Commands of Ken Betwa Link Canal in Tehsil Kulpahar, Charkhari and Mahoba of District Mahoba in Uttar Pradesh LOT3
350 mm dia AC Mazza Pipe Line Providing Laying and Commissioning with Specials and Fitting length 450 mtr Chainage 5.015 km to 5.465 km in Main Line at singhwahini pump canal block kamasin distt banda lot 2
Construction of Delivery Tank at Manikpur Bhujana pump canal. including all cost of material (excluding Cement), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer in Charge.
Restoration of Atarra Branch from km. 0.000 to 39.228, Baberu Dy from km. 0.000 to km. 31.248 and Kamasin Dy from km. 0.000 to km. 32.992 in restoration of Ken Canal System under Ken-Betwa Link Project
Renewal work at Bhainshwal Madalpur Gandewra Canal Patri Road at Km. 1(400), 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17(450) in Distt. Shamli in. F.Y. 2025-26
Providing, Laying, Jointing, testing and commissioning of HDPE pipe 500 mm Dia PE-100 grade and PN-8 from 1.220 km to 1.300 km and 2.050 km to 2.150 km in main pipeline of Ramjanki pump canal
Maintenance of trees, shrubs and lawn in Ecotech-I (Extn.-1), Ecotech-XI, central verge along Canal near Raipur including 100 Mtr wide green belt of 130 Mtr wide road near Dadha for one year, Greater Noida
Facility Management Services - LumpSum Based - Abstract Estimate Of Proposed Jananayak Chandrashekhar University Ballia; Estimate Of Soil Filling On the Play Ground And Contruction Of banks by side Cutting of the Canal And Pond situated in the univer..
Scrapping work of bed and side slope of Berdpur-Bajah canal (0.00 to 21.600km) and Alidapur west canal (0.00 to 13.000km).
Construction of stone lining and earth work in main canal from reach 0.550 Km to 0.790 Km at Jaugarh Pump Canal.
Construction of stone lining and earth work in main canal reach from 0.508 Km to 0.688 at Ramnagar Sikari pump canal.
Restoration of canal and all pucca Structure and Demarcation of canal land of Belhar Dy. From Km 0.000 to Km 14.000
Scrapping work of bed and side slope of Siswa-Jamuwar canal (0.00 to 13.600km) and Lal Sariaya Canal (0.00 to 12.200km).
Scrapping work of bed and side slope of Siswa-Newra canal (0.00 to 15.400km) and Siswa-madhavnagar Canal (0.00 to 12.800km).
Pipeline installation work from netajipuram main line of nagar panchayat lalganj pratapgarh via small canal to big canal on ghuisarnath road
Processing of Fresh MSW At Santosh City, Near Gang Canal Muradnagar and Accumulated MSW At Santosh City, Near Gang Canal Muradnagar.
Rennovation of service road on left bank from km. 17.170 to 17.410, km. 19.611 to 20.513 AND km. 21.897 to 22.297 of Atheha Distributary.
Repairing Work of Residences in Irrigation Colony, Shastri Nagar, Ghaziabad
STP Treated water Line in Sewerage Distt D (P/L and Commissioning of Irrigation line from nearby MSPS-2 Sec-168 to International Golf Course Sec-151A,Shahid Bhagat Singh park Sec-150 and RHS Expressway Green Belt upto Sec-157) Noida
WATER IRRIGATION AND TIME TO TIME COMPOST WORK AND PLANTATION OF TREE NEAR TAJ GANJ ZONE TAJ FIROZ KHAN COD, CHAWLI ARJUN NAGAR, SARAI MALUK CHAND , URKHRA ROAD, HYDROGEN STAFF QUARTER TAJ NAGRI PHASE-11 BLOCK F- 1 FATEHBAD MAIN MARG GWALLIOR ROAD
SPECIAL REPAIR TO BLDG NO P-309 OTM AT EBS BABUGARH AND PROVN OF 02 X SHALLOW WELL IN FARM AREA TO AUGMENT IRRIGATION FACILITIES AT EBS BABUGARH UNDER AGE B/R-II AND AGE E/M-I OF GE (NORTH) MEERUT CANTT
Rennovation of Canal Service Road from km. 17.900 to km 18.900 and km. 21.0 to km. 22.00 d Patch Repairing of canal service road From km 22.00 to km 24.00 of Ghaghar Main Canal LOT-2
Earth Work For Strengthening of Bank and Daula of Main Canal From Rech 5.000 Km to 6.500 Km. At Arjunpur Pump Canal
Auction of silt/ordinary soil from Km. 58.800 to Km. 98.600 of Main canal constructed under Madhya Ganga Canal Project Stage-I.
Construction of stone lining and earth wrok in main canal from reach 0.308 Km to 0.508 Km at Ramnagar Sikri Pump Canal.
Earth Work For Strengthening of Bank and Daula of Main Canal From Rech 2.000 Km to 3.600 Km. At Arjunpur Pump Canal
Earth Work For Strengthening of Bank and Daula of Main Canal From Rech 3.600 Km to 5.000 Km. At Arjunpur Pump Canal
Earth Work For Strengthening of Bank and Daula of Main Canal From Rech 0.500 Km to 2.000 Km. At Arjunpur Pump Canal
Roof repair for water proofing material of VIP Guest House, Circle and Division office in Irrigation Colony, Fatahan under project estimate for renovation of Irrigation Colony, Fatahan.
River Bank Protection Work at Head of Kakrait Pump Canal including all cost of material (excluding Cement), labour, T and P used complete in all respects as per drawing provided by department. As directed by Engineer in Charge.
FOR MANUFACTURING PROVIDING AND ERECTION COMMISSIONING TESTING and TRIAL OF 01 NO. PASSENGER LIFT, 408 KG, CAPACITY (FOR SIX PERSONS) ALONG-WITH ACCESSORIES and HARD WARES IN THE PUMP HOUSE OF UMARAHAT PUMP CANAL PHASE-II, STAGE-1
Work of Maintenance and repair on HT/LT lines for tilted poles, covering the 33/11 KV Sakaldiha Rural, Sakaldiha Tehsil, Chahaniya, Bhupauli, Marufpur and 33 KV Balua Pump Canal substation under the area of the EDD-Sakaldiha.
New construction work of Bareilly Bisalpur Road to Manpuriya Janaki Prasad Gangasheel Ayurvedic College to Canal Rajwah Aurangabad between km 4 to km 20.830 service road bituminous road in Distt Bareilly under CM Village Scheme With 5Year Maintenace
Construction of Boundry Wall at Head of Kakrait Pump Canal including all cost of material (excluding Cement), labour, T and P used complete in all respects as per drawing provided by department. As directed by Engineer in Charge.
Construction work of RCC drain in Mohalla Rajgarh from the house of Shri Vinod Shankar Awasthi Honble MLA Dhaurahra to the house of Raj Narayan Raj passing through Dhawan Sari in front of the house to the canal.
NABARD FUNDED MODERNIZATION OF CH. CHARAN SINGH KUWANO PUMP CANAL, MUKHLISPUR SANT KABIR NAGAR. SUPPLY, INSTALLATION AND TESTING AND COMMISSIONING OF EARTHING OF H.T. MOTOR, VCB PANEL AND APFC PANEL (NEW PUMP HOUSE) AT KPC SANT KABIR NAGAR.
LABOUR CHARGES FOR CONSTRUCTION OF RETAINING WALL FROM KM. 4.70 TO KM. 4.85 AND FROM KM. 5.95 KM TO KM. 6.23 AT WIDENING AND STRENTHENING OF SERVICE ROAD MAKING PUCCA METALED ROAD JANLA DY. BELAN CANAL DIVISION ALLAHABAD
Fabrication of M S pipe 4.5m long ID 900mm OD 920 mm length 4500 mm thick 10mm in delivery pipeline by bending cutting rolling and M.I.G continuous welding for Pumps under Chaudhary charan singh Dalmau B Pump canal
Adhyayan upkhand banbasa ke Niyantranadhin sharda mukhya nahar ke vibhinn rico main C.C road navinikaran tatha Adhyayan upkhand office kee cc road navinikaran avn is upkhand ke canal colony banbasa mein avasit sahayak abhiyanta, awar abhiyanta ke Aaw
Construction of CC road and Construction of Drain for Drainage from House of Brijesh Rajbhar in Mohalla Mathiya village Basti Bujurg via Rajbhar Basti to Naali of Canal from Primary School Mathiya towards east direction. (Length-1.480 K.M)
Silt Auction from canal banks of Bansak DY. From Km. 23.900 to 24.400(L/B), Km. 24.000 to 24.060 (R/B), Km. 25.000 to 25.550(L/B) and Km. 26.900 to 26.980(L/B) for F.Y. 2025-26.
Construction of a 3x3 meter span RCC box culvert in place of the narrow and damaged small bridge on the Aurangabad Rajwaha canal at kilometer 5 of the Tikra Baijnath Karthuni Lalganj Dadra Gajnpur Duwariya other district road
Work of laying brick soling (Khadanja) on the left bank of the Kheri Branch Canal in Lakhimpur-Kheri district, covering the stretches from km 69.050 to km 75.250 and from km 108.00 to km 121.150 (Lot No.-4)
Nabard funded modernization of Doharighat Shayak Pump Canal, Dist-Ballia. Supply, Installation, Testing and Commissioning of Dismantling joints of Delivery pipe line 700 mm dia for the pump no-06, 07, 08, 09 And 10 at DSP Ballia.
Nabard funded modernization of Doharighat Shayak Pump Canal, Dist-Ballia. Supply, Installation, Testing and Commissioning of Dismantling joints of suction pipe line 750 mm dia for the pump no-06, 07, 08, 09 And 10 at DSP Ballia
Work of laying brick soling (Khadanja) on the left bank of the canal along the Sitapur Branch in Lakhimpur-Kheri district specifically from km 0.000 to km 7.050 and from km 28.200 to km 30.181 (Lot No.-2)