Rennovation of Canal Service Road of Kuda Dy. from km. 13.260 to km. 18.008
CONSTRUCTION OF DIVERSION FOR D.R.B CUM CANAL SYPHON AT KM 8.350 OF KAILY DY.
RENEWAL OF SERVICE ROAD OF NUNAUTI LEFT CANAL FROM KM. 2.300 TO KM. 3.400
Scraping of Internal Section of Dekhwa Right Canal from km. 0.000 to km.1.500
Rennovation of Service Road of Ahraura Main Canal from km. 3.500 to km. 6.250
Patch work of canal service road of Atrauli Mr from km 0.000 to 2.100
Repairing of culvert on left bank side at Km. 8.800 of Sone Pump Canal.
Renovation of AE Quarter, J.E. Quarter And Clerical staff quarter of Irrigation Construction Division, Robertsganj in district
09-01-2024 11:00:00 Office Of Engineer in Chief (Mechanical) Irrigation Department U.P. MANUFACTURE & SUPPLY OF VERTICAL TURBINE PUMP OF 150 CUSEC CAPACITY AND 6.7 METER HEAD ( 7 the number pi ), SUPPLY OF 11 KV H. T. SQUIRREL CAGE INDUCTION MOTOR SUITABLE FOR 150 CUSEC 6.7 METER HEAD VERTICAL TU ( 7 the number pi ), SUPPLY OF 01 SET OF 11 KV H. T. PANEL VCB TYPE (CONSISTING OF 02 NOS. INCOMER PANEL, 7 NOS. OUTGOING ( 1 the number pi ), ERECTION, COMMISSIONING AND TESTING OF 07 NO. 150 CUSEC 6.7 METER HEAD VERTICAL TURBINE PUMP, 7NOS. ( 1 the number pi )
Please refer to tender document
Construction of stone lining and earth work in main canal reach from 1.250 Km to 1.300 Km and T-Point of Rampur Minor and Rampur DY Minor Length 100 Mtr. at Hargarh Ist Pump Canal.
RENEWAL WORK
Civil Work
Retender
Silt clearance
Providing and fixing of outdoor type heat shrinkable, end termination kit suitable for following cable size XLPE (E) insulated armoured aluminum conductor cable and making termination, connection with overhead conductor, testing AND commissioning et
AS PER BOQ
Boxinf/Flooring repair of VRB at km 19.960 of Gyanpur Main Cana
LOT05
As per tender documents
Construction of RCC pedastal from P1 to P58 for 500 mm dia MS Pipe line And laying and Erection of MS Pipe line 500 mm dia length 260 m . Chainage 1.180 km to 1.220 km and Chainage 1.300 km to 1.520 km in Main pipe line.New Ramjanki Pump Canal 20 cu
Khadanja work on left Bank of Nawabganj distributary from Km 7.150 to Km 11.056, Km 11.250 to Km 13.074, Km 14.380 to Km 18.600, Km 19.162 to Km 19.900 and Km 20.084 to Km 21.000
Manufacturing of M-150 Compressed C.C. Tiles of Size (300x300x40) mm (For Main Canal Ch. From Km. 47.500 to Km. 47.700) at Central store at Km 52.180 of M.G.C. (Main Canal) of M.G.C. Stage II Project.
Manufacturing of M-150 Compressed C.C. Tiles of Size (300x300x40) mm (For Main Canal Ch. From Km. 45.350 to Km. 45.500) at Central store at Km 52.180 of M.G.C. (Main Canal) of M.G.C. Stage II Project.
Manufacturing of M-150 Compressed C.C. Tiles of Size (300x300x40) mm (For Main Canal Ch. From Km. 45.700 to Km. 45.900) at Central store at Km 52.180 of M.G.C. (Main Canal) of M.G.C. Stage II Project.
Single Use Monopolar Electro Surgical Unit Pencil, Single Use Neutral Electrode Pad for Electro Surgical Unit, Single Use Irrigation Tube for Irrigation Forceps, Reusable Bipolar Forcep Straight, Reusable Bipolar Forcep Bayonet, Reusable Bipolar Cable, Bipolar Foot Pedal, Monopolar Foot Pedal, Reusable Monopolar Cable
Repair door window, floor and distempering of Field Hostel under Project estimate for renovation of Irrigation Colony, Fatahan
Providing, fixing and Commissioning of Solar PV Panel ,100KW Power Plant (Ground Mounted) for Irrigation workshop Division Gorakhpur.
MANUFACTURE AND SUPPLY OF CAST IRON SLUICE VALVES AND CAST IRON REFLUX VALVES IN IRRIGATION DEPARTMENT, UTTAR PRADESH
Renewal/Maintenance of Kishanpur Pump Canal Painted service road from Km km. 69.055 to 73.855
Restoration of Type-3 qtr. at Phoolbagh colony under Kanpur Division Lower Ganga Canal Kanpur
Renewal of Canal Service Road of Sidholi Dy. From Km. 5.600 to Km. 6.600 Lot25
Renovation of service road of Sukhara Main Canal from ch. Km. 22.750 to Km. 24.400
Restoration of Ghori Main Canal with stone boulder Lining from Km. 6.339 to Km. 6.440
Restoration of Pucca Works of Minors Offtaking from Ghaghar main Canal Km 16.000 to 32.400
Renewal of canal service road of Pimora Dy from Km. 13.350 to 14.550 Lot 17
Renewal work on Left Basera Dy. Canal service Road between Km. 9.600 to 10.300 LOT10
Renovation of Service Road of Dekhwa Left Canal B/w km. 1.500 to km.2.200
CONSTRUCTION OF FALL At KM. 2.700 OF FATEHPUR MINOR OF MADHYA GANGA CANAL STAGE -II
Renewal of canal service road of Mathura Minor Between Km. 0.000 to 0.800 Lot 21
Construction work of soling ballast road from Tikamgarh Road via canal to new Kanha Gaushala
Renovation of Canal Service road from Km 0.360 to 1.760 Of Indiparvatpur Minor. LOT-03
Renovation of Canal Service Road from km. 0.000 to km1.300 of Raikal Mr. LOT-04
Renovation of Canal service road from Km. 0.830 to 1.700 Of Jhingura Minor LOT-01
Renovation of Canal Service road from Km. 13.500 to 14.600 Of Bharpura Dy LOT-41
Renewal of canal service road of Deoband Branch Between Km. 40.200 to 42.200 Lot 24
Painting of structure/equipments at 132KV Sub-station Yamuna Pump Canal under ETD-III, Prayagraj
Repairing and Resurfacing of Service road on Fatehpur Branch Canal from km 13.421 to 14.421
First Class Brick Lining work, Cement Plaster work and CC work at Barouliya pump canal
Renewal of canal service road of Bastam Dy. Between Km. 17.600 to 19.900 Lot 23