Loading…
Loading…
9,469 results • Best match
Scraping of Babatpur Dy. from Km. 11.000 to 14.800
Construction of V.R.B. at Km. 45.377 on Babatpur Dy.
Silt auction of faizabad branch between km 57.170 to km 60.979
Renovation work of service road on left bank of Pausra Dy. between km. 16.800 to km. 19.700
Silt Clearance-Scraping of Pandeypur Dy. from Km. 0.000 to 12.950
Scrapping of Akodha Mr. from Km 0.000 to 3.900 and Kaniyar Mr. Km. 0.000 to 5.000
Silt clearance of Patulaki Mr. from Km. 0.00 to 3.00 and Scrapping Km. 3.00 to 6.400
Silt clearance/Scraping of Kunwarpur Mr. from Km. 7.200 to 17.800
Construction of box culvert at k.m. 6.460 of airport right drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district ayodhya
Silt clearance of Oina Dy. km. 0.000 to 5.200
Silt clearance in M-Shahar Dy. From Km. 0.000 to 7.400
E/W in Silt Clearance in Kunwarpur Dy. from Km. 0.00 To Km. 5.800 km.and km 13.00 to km 17.800 Rabi Fasli 1429
Renovation work of service road on right bank of Faizabad branch between km.126.200to km. 126.670
Lot No.-02- Renovation of service road on left bank of Faizabad branch between Km 68.185 to 69.700
Scrapping of Gajokhar Mr. from Km. 0.00 to 1.300, Devnathpur Mr. Km. 2.200 to 3.00, Fattepur Mr. Km. 2.00 to 3.100 and Thaur Mr. Km. 2.00 to 4.800
Construction of box culvert at k.m. 5.310 of tilaiya drain for water drainage of underconstruction maryada purushottam shreeram ayodhya international airport in district
Clearance in Rampur Kala Drain from Km. 0.00 to 8.000
Construction of Box Culvert at Km. 32.850 on Narayanpur Dy.
Scrapping of Oina Dy. from Km. 3.500 to 8.600
Scraping of Kunwarpur Dy. From Km. 20.900 to 23.800
Silt clearance in Jamalpur Mr. From Km. 0.00 to 1.400 Scraping Pauha Mr. Km. 0.00 to 2.500
Scrapping of Devrai Mr. from km. 0.00 to 2.600 and Suwari Mr. from km. 0.00 to 3.600
Repairing/Renovation of V.R.B. at Km. 59.685 on Babatpur Dy.
Retender Scraping of Babatpur Dy. from Km. 20.00 to 28.00
Earth work clearance of Kazipur Drain from Km. 0.000 to Km. 3.000
Earth work in clearance in Dallipur Drain from Km. 0.000 to Km. 13.450
Repair of V.R.B.s in Devnathpur Mr. Between Km. 0.000 to Km. 3.000
Construction of new 33 KV line from 220/132/33 KV Sub-Station Gola (Deharibhar) Distt- Gorakhpur to existing tapping point 33 KV Baranagar Canal Pump (At Puliya) Existing double pole of Baranagar Canal Pump, Distt. Gorakhpur
500 mm dia MS Pipe laying and Erection 130 mtr. And Construction of RCC pedestal (30 Nos) for 500 mm dia MS Pipe line (reach from 2400 mtr to 2480 mtr and from 2560 mtr to 2610 mtr) At Main Canal and 355 mm dia MS Pipe laying and Erection 160 mtr. A
CONSTRUCTION OF BOX CULVERT IN PLACE OF V.R.B. AT KM 46.850 ON D.S.P MAIN CANAL, AT KM 2.200 AND AT KM 3.100 ON RATSAR DY, AT KM 14.100 ON PADAH DY, AT KM 8.000 AND AT KM 10.250 ON BISHUNPURA MR, AT KM 0.800 ON MITHWAR MR, AND AT KM 5.000 ON BANRAHI
Fabrication of 4.5m Long M.S Pipe of 1375mm I.D, 10mm Thickness with Both Side Flanges and Stiffeners by Bending, Cutting, Rolling And M.I.G Welding for Devkali Pump Canal Saidpur, District Ghazipur Under Renovation Project of Devkali Pump Canal
Construction of pressure well
AS PER BOQ
As per Tender Notice
Construction of pressure well
Construction of pressure well
Dismantling of existing foot over bridge and reconstruction of foot over bridges at various location
Construction of pressure well
Reconstruction of Damaged Slab of VRB at km 19.500 of Gyanpur Main C
As per tender notice
As per tender notice
As Per Tender Notice
Construction of pressure well
Construction of pressure well
As per tender notice
Construction of pressure well
AS PER BOQ
Construction of pressure well
Please Refer Tender Notice
As per tender notice