Loading…
Loading…
9,436 results • Best match
Strengthening of Canal between km. 5.785 to km. 7.435 of Meja Jirgo Link Canal
RESTORATION WORK CANAL OF AGAR MINOR KM. HEAD TO TAIL OF LOWER RAJGHAT CANAL.
CONSTRUCTION OF BOUNDRY WALL OF DHAKAVA CANAL KOTHI AT KM-118.200 KHERI BRANCH CANAL
Repairing Parapet and Metalled service Road From km. 23.650 to km. 23.780 Of Agra Canal
Repairing Parapet and Metalled service Road From km. 23.320 to km. 23.470 Of Agra Canal
Repairing Parapet and Metalled service Road From km. 23.500 to km. 23.630 Of Agra Canal
Repairing Parapet and Metalled service Road From km. 22.900 to km. 23.020 Of Agra Canal
Repairing Parapet and Metalled service Road From km. 23.030 to km. 23.150 Of Agra Canal
Repairing Parapet and Metalled service Road From km. 23.160 to km. 23.300 Of Agra Canal
Silt Clearance and Scrapping of existing internal section of Atheha Distributary From Km. 7.655 to Km. 19.611
Silt Clearance and Scrapping of existing internal section of Atheha Distributary From Km. 9.144 to Km. 27.450
Repairing and Maintenance works in Residence no. Type-II-2/4 and 2/6 in Driver Block at Canal colony cantt Road Lucknow. (Lot No.33)
Repairing and Maintenance works in Residence no. Type-II-3/4 and 3/6 in Driver Block at Canal colony cantt Road Lucknow. (Lot No.06)
Repairing and Maintenance works in Pump House Driver Block , AE Block and M1, M2 Block , Havlock Road Colony Pump House at Canal Colony, Cantt Road, Lucknow
Repairing and Maintenance works in Residence no. Type-II-2/5 and 2/1 in Driver Block at Canal colony cantt Road Lucknow. (Lot No.18)
Complete job of augmentation and renovation of Sulmai pump canal intake well. The work will include providing, installation, Testing and commissioning of dry motor submerged pumpsets with all accessories such as LT PMU, Auto Coupling and pin, integra
Complete job of augmentation and renovation of Sulmai pump canal intake well. The work will include providing, installation, Testing and commissioning of dry motor submerged pumpsets on existing guide rail with the help of LT XLPE insulated Screened
LOT- 03 Restoration work and demarcation of canal land of Barwar Canal under the jurisdiction of Jhansi Division Betwa Canal, Jhansi in District-Jhansi.
Fabrication and Replacement of Main Roller of Regulator gates at Hindon cut Canal Tail Regulator in New Delhi
Cleaning of Chocked Sewer Line for AE Blcok Resi No. 27, 28, 31/1 and 31/2 and 4th Class Block Type-1 at Canal Colony Cantt Road, Lucknow.(Lot No.54)
Supply, Installation, Testing and Commissioning of Off-Grid rooftop 10 kw capacity PV Power Plant at Babina Pump Canal,Jhansi
Repairing of damaged stone pitching L/B U/S and D/S of Bridge at Km 19.970 Of Agra Canal
Restoration work and Demarcation of canal land from Km 0.000 to 25.200 of Machhlisahar Dy of Dist. Jaunpur Lot 1
Electrical Work in Steno Resi. No.-Sa-2, Sa-5, Sa-7, Sa-9, Sa-11, Sa-14, Sa-15 Type T-I Resi. No.-Aaka-2, Aaka-5, Aaka-8, Aaka-12, Aaka-17 and Aaka-20 in Canal Colony.(Lot-12)
Electrical Work in Resi.No.- T-II-1/6, T-II-2/6, T-II-3/5, T-II-4/3, T-II-5/1, T-II-5/3, Type T-I Resi.No.-Saka-1 to Saka-14 at Canal Colony. (Lot-33)
Electrical Work in Steno Resi. No.-Sa-1, Sa-3, Sa-6, Sa-8, Sa-10, Sa-12, Sa-18 and Type-I Resi. No.-Saga-1, Saka-1, Saka-4, Saka-7, Saka-10, Saka-14 at Canal Colony. (Lot-15)
Electrical Work in Type-II Resi.No.-M1/3, M1/6, M1/9, M1/12, M2/15, M2/18, M2/20, M2/24, Type T-I Resi. No.-Waka-1, Waka-4, Waka-7, Waka-11 and Waka-15 at Canal Colony. (Lot-16)
Electrical Work in Type-II Resi.No.-M1/2, M1/4, M1/7, M1/11, M2/14, M2/16, M2/19, M2/22, Type T-I Resi. No.-Waka-2, Waka-5, Waka-8, Waka-10 and Waka-14 at Canal Colony. (Lot-38)
AS per BOQ
Strenthaning of Main Canal by Stone Boulder Piching from 0.158 km to 0.550 km at Kothighat kala Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as dire
Strenthaning of Main Canal by Stone Boulder Piching from 0.040 km to 0.152 km at Kothighat kala Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as dire
1st Class Brick lining work of west canal from Km. 0.00 to Km. 0.200 at Kaurihar Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
1st Class Brick lining work of Main canal from Km. 0.930 to Km. 0.1.180 at Niyardih Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
Renovation work of main canal from Km. 1.325 to Km. 1.475 at Chhitauni Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department. as directed by Engg.
Strenthaning of Main Canal by Stone Boulder Piching from 1.250 km to 1.500 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Renovation work of main Canal from between 0.00 Km to 0.750 Km at Naubatpur Pump Canal including dismantling of old brick lining, including other material, (excluding Cement and brick ) labour and T and P used, Complete in all respect as per drawing
Renovation work of main canal from Km. 0.00 to Km. 0.800 at Chhitauni Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department. as directed by Engg.
Strenthaning of Main Canal by Stone Boulder Piching from 0.250 km to 0.400 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Renovation of 1st Class Brick brick lining work at main canal from Km 0.00 to Km. 0.285 at Banbhikhampur Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided
Strenthaning of Main Canal by Stone Boulder Piching from 1.050 km to 1.250 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Strenthaning of Main Canal by Stone Boulder Piching from 0.570 km to 0.850 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Strenthaning of Main Canal by Stone Boulder Piching from 0.570 km to 0.850 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Strenthaning of Main Canal by Stone Boulder Piching from 0.400 km to 0.564 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
Renovation of Old Brick Lining in main Canal between 0.00 Km to 0.750 Km at Dhanaitpur Pump Canal including other material, (excluding Cement and brick ) labour and T and P used, Complete in all respect as per drawing provided by department. as dire
Renovation of 1st Class Brick brick lining work at main canal from Km 0.00 to Km. 0.410 at Koniya Pump canal including all cost of material (excluding Cement and Bricks), labour, TANDP used complete in all respects as per drawing provided by departm
1st Class Brick lining work of Main canal from Km. 0.680 to Km. 0.930 at Niyardih Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
Renovation of Brick lining work of Main canal from 0.00 Km. to 0.675 Km. at Muradev Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
Strenthaning of Main Canal by Stone Boulder Piching from 0.850 km to 1.050 km at Dhankuwari Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed
1st Class Brick lining work of main canal from Km. 1.070 to Km. 1.470 at Kaithi Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
Strenthaning of Main Canal by Stone Boulder Piching from 0.558 km to 0.958 km at Kothighat kala Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as dire