Loading…
Loading…
683 results • Best match
Panchakki to Katghariya Kamaluwaganja 8.20 km long canal covering work between reach 0.000 km to 0.700 km in Kaladhungi vidhan sabha district Nainital.
Panchakki to Katghariya Kamaluwaganja 8.20 km long canal covering work between reach 1.890 km to 2.740 km in Kaladhungi vidhan sabha district Nainital.
Scheme for Construction of Offshoot from Asoi Canal to Lower 5 Sainj Kyari of Gram Pnchayat Bayla under Chakrata Block of District Dehradun
Renovation of Haripur canal and Old branch and Construction of New Gule in Doiwala block Distt. Dehradun (Ch. 0.000 Km to 1.800 Km)
Panchakki to Katghariya Kamaluwaganja 8.20 km long canal covering work between reach 2.740 km to 3.640 km in Kaladhungi vidhan sabha district Nainital.
Modernization and renovation work of Malsa canal in block Rudrapur distt. Udham Singh Nagar under Nabard (Job-1)- (Reach- km. 0.000 to 0.550, km 0.950 to km 1.353 and km. 1.383 to km. 2.399)
Unbranded high density polyethylene hdpe laminated woven lay flat, Unbranded high density polyethylene hdpe laminated woven lay flat tube for irrigation purpose tube diameter upto 110 millimeter
Supplying and Installing of On-grid Solor PV system in irrigation Schemes of Minor Lift sub division II at Didihat under Minor Lift Division Pithoragarh Lot-2
Supplying and Installing of On-grid Solor PV system in irrigation Schemes of Minor Lift sub division I at Pithoragarh under Minor Lift Division Pithoragarh Lot-1
Reconstruction of Kharwa canal damaged from Badethi-Kanwa Motor Road in Dunda block of district Uttarkashi Job-2 (Reach 0.690 Km to 1.320 Km)
Modernization and renovation work of Chamanganj Canal in block Gadarpur under nabard head in distt. Udham singh Nagar Reach-2.250 km to 3.200 km
Reconstruction of Kharwa canal damaged from Badethi-Kanwa Motor Road in Dunda block of district Uttarkashi Job-1 (Reach 0.150 Km to 0.690 Km)
4700 ERM Extension, renovation and modernisation of malan Canal system under A.I.B.P. Reach- (Km 0.00 to Km 1.700) Kishanpuri Minor and Minors gule Renovation
Modernization and renovation work of Chamanganj Canal in block Gadarpur under nabard head in distt. Udham singh Nagar Reach-0.000 km to 1.200 km
Modernization and renovation work of Chamanganj Canal in block Gadarpur under nabard head in distt. Udham singh Nagar Reach-3.200 km to 4.050 km
Pipe canal scheme in village Sunoda of Gram Panchayat Mathiyana Under Chakrata Block of district Dehradun (Reach-3.170 Km to 6.000 Km)Job-2
Pipe canal scheme in village Sunoda of Gram Panchayat Mathiyana Under Chakrata Block of district Dehradun (Reach-0.000 Km to 3.170 Km)Job-1
Canal covering and Improvement of road from Workshop Line to Mukhani Chauraha Via S.B.I. in Constituency Assembly Haldwani of District Nainital Under State Sector
3. DETAILED ESTIMATE FOR BEAUTIFICATION /LANDSCAPE WORK FOR INVESTOR SUMMIT 2023 ,HELIPAD TO CANAL ROAD TO BRAHAMKAMAL CHOWK TO RAJPUR ROAD( ROUTE NO.05)
DETAILED ESTIMATE FOR INSTALLATION OF VERTICAL GARDEN AT RISPANA PULL, RAJEEV NAGAR PULL, CHUNA BHATTA PULL RAIPUR, AND CANAL ROAD KANTHA BANGLA DOHRAN PULL
Modernization and renovation work of Chamanganj Canal in block Gadarpur under nabard head in distt. Udham singh Nagar Reach-1.200 km to 2.250 km
Construction of Koti Dhalani main canal in Block Sahaspur,Distt-Dehradun C.M. Announcement No. 613/2021) (Reach Between 0. 000 KM To 0.750 KM).
Sacheme for Repair,Renovation and Restoration of Gajoli Canal in the Gangotri Assembly Constituency in Bhatwari Block, District Uttarkashi (Reach -0.00 Km to 2.260Km.)
Under hon Chief minister announcement no 108-2019 construction of road by covering of paha canal in kichha constituency of district udham singh nagar
CANAL Covering 8.2 Km Long Kathgariya Minor From Panchakki to Kamalwaganja at Kaladhungi Vidhansabha HALDWANI Distt Nainital REACH Chambal Bridge 0.730 to 1.030 Km
Hiring of Support Services for Hydrological Observation on eflow sites u/s and d/s of the hydropower/irrigation projects on Various Rivers Under Himalyan Ganga Division, Dehradun
RENOVATION OF SEMALKHALIYA CANAL AND TAIL GULE UNDER NABARD BETWEEN KM 6.00 TO 7.00 KM AND TAIL PORTION KM 0.000 TO KM 0.700 CM ANNOUNCEMENT 44/2024
Construction of Dhanauri-Sidkul Link road on right bank of upper Ganga canal Causeway in Distt. haridwar (Ch. 3.775 KM to 3.865 KM) JOB-03
Construction of Dhanauri-Sidkul Link road on right bank of upper Ganga canal Causeway in Distt. haridwar (Ch. 6.275 KM to 6.325 KM) JOB-04
Covering and Drainage Work of Khatima Main Canal No. 2 (Phase-1) in Block Khatima, Udham Singh Nagar under Honable CM announcement no. 1697/2021
Under the State sector, work of strengthening and asphalting of Canal Road from Herbertpur Asan Barrage road to Ambadi in Vikasnagar constituency of Dehradun district.
Under NABARD, the modernization and restoration work of the Sisaiya Canal, received from the State of Uttar Pradesh, in Sitarganj Tehsil, Udham Singh Nagar district.
Construction of Bailey bridge on the Eastern Ganga Canal for entry of vehicles to the Gauri Shankar parking in Distt. Haridwar under Kumbh Mela 2027
Construction of Bailey bridge on the Eastern Ganga Canal for exit of vehicles from the Gauri Shankar parking in Distt. Haridwar under Kumbh Mela 2027
Construction of water distribution system (pipe offshoot) from Dasau pipe canal and main tank in Gram Panchayat Dasau of Chakrata development block of Dehradun district.
Construction, Renovation and Modernization of Golawar Feeder Canal from Chainage 3.5 km to 11.00 km under Jamrani Dam Multipurpose Project in Haldwani, Distt. Nainital, Uttarakhand
REPAIR/REPLACEMENT OF EXTERNAL WATER SUPPLY, IRRIGATION PUMPS, CLEANING OF UNDER GROUND SUMP/OVER HEAD TANK, PIPE LINE AND OTHER MISC E/M WORK AT DIBER FIELD STATION PITHORAGARH
REPAIR/MAINT OF EXTERNAL WATER SUPPLY, IRRIGATION PUMPS, WINDING OF MOTORS,CLEANING OF UG/OH SUMP, PIPE LINE AND OTHER MISC E/M WORK AT DIBER FD STN PITHORAGARH
Construction of Ghat on left bank of Upper Ganga Canal in downstream of Shaheed Bhagat Singh Ghat to Singh Dwar under Kumbh Mela-2027 in Haridwar
Desilting and timely Ganga river diversion work in Ganga canal escape channel for Water supplying in existing ghats in Har-Ki-Pauri and other Kumbh area
Flood protection works at right bank of Swarna river from canal head to Joshi farm in block Sahaspur district Dehradun Under C.M Announcement Number 599/2021.
Scheme for Strengthening and modernization of the head of Bijapur Canal Under the Centrally Sponsored scheme Amrit 2 in Distt Dehradun (Reach 0.00 Km to 0.600Km)
22- Ward No. 20 Construction of the main gate of Sainik Colony with CC or iron pillars near Dr. Pratap house, towards Dr. Bansal side, along the Irrigation Department wall.
Under NABARD item, plan for reconstruction work of silyara canal damaged due to natural disaster in Bhilgana development block of Tehri Garhwal district. (REACH- 0.000 Km to 4.000 km )JOB -01
Under NABARD item, plan for reconstruction work of bahedi canal damaged due to natural disaster in Bhilgana development block of Tehri Garhwal district. (REACH- 0.000 Km to 1.800 km )JOB -02
Reconstruction work of Chamiyala feeder canal damaged due to natural calamity in Bhilgana development block of Tehri Garhwal district, reach- 0.000 km to 2.800 km Job 02
Work for restoration of lining of left side of main canal no. 01 in block Khatima in Udham Singh Nagar district (Reach- Km 2.200 to 4.500 Km).
The restoration work of Bhujanari canal under the development block of Bhignalna in Tehri Garhwal district under 4700 Navard scheme is from reach 0.000 km to 2.000 km.
New construction of Mothi canal in Mothi village of Chakrata block in district Dehradun (Reach Km 1.450 to Km 2.500 and Part-II Km 0.000 to Km 0.500)
Repairing work of MS angle, MS chain, Hook, Tile/Stone, Railing etc of existing ghats in left and right bank of Upper Ganga Canal under Mahakumbh Mela-2021