Loading…
Loading…
5,019 results • Best match
JJM balance work in Kundara Panchayath-Re appropriation road restoration works at various wards in Kundara Panchayath in connection with JJM work
Construction, Testing, Commissioning and Trial running of 22 LL OHSR, Supplying, laying, testing and commissioning of Clear water transmission main and distribution system and providing functional household tap connection-Pipeline Work
Providing FHTC
LWSS ELAVALLY- PROVIDING FHTC TO ELAVALLY GRAMAPANCHAYATH IN THRISSUR DISTRICT UNDER RPMU, MALAPPURAM
LWSS NADATHARA- PROVIDING FHTC TO NADATHARA GRAMAPANCHAYATH IN THRISSUR DISTRICT UNDER RPMU, MALAPPURAM
JJM WSS to Chakkupallam,Vandanmedu,Karunapuram and Vandiperiyar Panchayats in Idukki District Survey work for distribution network design
JJM-2021-2022- Providing FHTCs in Thalakkulathur Grama Panchyath(Phase 2) By extending the pipe lines laid under JICA Scheme and JJM Phase I
JJM-Replacing the damaged 160 mm HDPE pipe laid across the Kayikkara lake in Anchuthengu pt
Jal Jeevan Mission.JJM.Project work.Providing FHTC to Venappara area in Karimannoor GP.
AMRUT_Providing FHTC to households in Thrissur Corporation Area _Package V_Pipeline Work
AMRUT_Providing FHTC to households in Thrissur Corporation Area_Package II Pipeline Work
Providing FHTC in Perambra Grama Panchayath in Kozhikode District from WSS in Permabra Panchayath
JJM 2023 2024 Parassala Grama Panchayath Panchayath Road Restoration Balance work
JJm-Hiring of Vehicle for dry lease mode For the use of JJM project, UIDSSMT WSP Payyannur-Hiring of Vehicle-General Civil Work
Road reformation work of PWD Roads
JJM-ERATTAYAR AND KAMAKSHI PTS IN IDUKKI. S.L CWPM, Construction of reservoirs, steel tanks at Kurisumoottilpady, Heropady
Supplying and laying
Construction of 18 LL Capacity OHSR - Laying Distribution system and providing FHTCs in Ajanur Panchayath.
Laying Distribution network and providing FHTCs
Construction of 10LL Capacity OHSR- Laying Distribution system providing FHTCs in Pallikkara panchayath(Part).
Construction of 12 LL Capacity OHSR and Laying Distribution and providing FHTCs in lower level of Pullur Periya Panchayath.
JJM Providing FHTC to rural households in Edakkattuvayal Panchayath Part IV
JJM Phase III package I Kizhuvilam panchayath providing pipe line extension and Household tap connection
JJM -WSS to Thanniam Grama panchayath - Road Restoration works.
JJM - WSS to Thanniam Grama panchayath-Road Restoration works.
DEPOSIT-RESTORATION ESTIMATE FOR JJM AT PADANILAM -NARIKKUNI ROAD
JJM-WSS to Chungathara Kurathimala -Construction of WTP,OHSR
JJM 2021 2022 Supply Installation Validation and warranty of
POOVAR BEACH ROAD RESTORATION JJM POOVAR GP PRO 229
JJM 2021 22 Supply installation validation and warranty of
JJM 2021 2022 Supply Installation Validation and warranty of
AMRUT 2.0 - Perinthalmanna municipality - Providing FHTC and laying of distribution pipe lines in various places in Perinthalmanna municipality Phase -1-AMRUT 2.0 - Perinthalmanna municipality - Providing FHTC-Pipeline Work
JJM 2021-22 -3rd SLSSC - Eraviperoor Grama panchayath- Functionality Improvement - Providing 70Nos of FHTCs Replacing old and damaged AC pipe with DI Pipes along Thottappuzha - Vallamkulam road during BMBC road renovation work by PWD Reach - 2
JJM Hiring of vehicle with driver above 1500 CC for the work of JJM Survey for Quality Control District Lab Idukki for one year for sample collection under JJM
Jal Jeevan Mission CWSS to Pallickkal Madavoor and Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of Clear Water Pumping Main to Decentmukku OHSR in Navaikulam Panchayath
Jal Jeevan Mission-RWSS to vilavoorkal-supply erection, testing, commisioing and maintaining of centrifugal pump discharge 73 lps 115m head over all efficiency 75 percentage 1500 2 years warrenty
Jal Jeevan Mission CWSS to Kalipara Optimization of Water treatment plant Improving capacity of 36 MLD WTP at Kalippara Repacking existing Slow sand filter media and other maintenance work
Jal Jeevan Mission WSS TO NEDUMKANDAM PAMPADUMPARA UPPUTHARA ELAPPARA PART AND ARAKULAM PART PANCHAYATHS IN IDUKKI DISTRICT -Design and construction of 35 MLD water treatment plant Structural Design Work
JJM WSS to Ayarkunnam Panchayath Supplying and Laying DI GI PVC Distribution net Work and Providing FHTC in Zone 1 and 2 in ARWSS to Ayarkunnam Kooroppada and Pampady Panchayath Along the Alignment of 300 MM DI pumping Main from WTP to OHT at RIT
JJM- WSS to Edamalakkudy Panchayath in Idukki District- Design and Construction of 0.25 MLD WTP,Clearwater Sump Cum Tank at Paarakudy
Additional proposal for full coverage - Supplying, laying, testing and commissioning of additional distribution system for providing FHTC in Chathamangalam Panchayath
Construction and commissioning of 70 LL MBSR at Thannikodumala supplying,laying , testing and commissioning of distribution system and providing FHTC in Chathamangalam Panchayath
DEPOSIT JJM cutting Restoration Work on Paleri Ottakkandam road km 0000 to 4200 Due to JJM road cutting work General Civil Workin Kozhikkode LAC
DEPOSIT JJM 2025 26 Restoration of trenching done by KWA for JJM in Anickadu Church Road from 0 000 to 1 000 KmRestoration Work
JJM-2021-22-Karakulam Grama Panchayath-Road Restoration work in Mullassery-Palathara-Vengode road at Plathara
JJM-WSS - to Santhanpara, Rajakumary Part andSenapathy Part Panchayaths in Idukki district-Package IIA - Supplying and Laying Distribution and Providing FHTCs in Senapathy GP Pipeline Work
Supplyand Laying Clear water Pumping MainsGravityMains.construction of GLSRsProviding Distribution System and providing FHTC in Munnar and Pallivasal area Package1General Civil Work
Construction of 5LL Capacity OHSR at Kaikkottkunn- Laying Distribution system providing FHTCs in Upper level of Pullur Periya Panchayath.
DEPOSIT-Restoration -JJM Supplying and laying of pipe form Karakkonam -Vlankulam Road-Restoration work-General Civil Work
J J M PROVIDING FHTC TO RURAL HOUSE HOLDS IN KUNNUKARA PANCHAYATH