Loading…
Loading…
5,019 results • Best match
Providing FHTC to Thariyode Grama Panchayath(WTP Sump)by Laying new Distribution system Zone I
JJM-KWA Hiring Vehicle Hiring of vehicle with driver for One year for water sample collection under JJM Normal Survey and Sanitary Survey for Quality Contol Sub District Lab Chittur -General Civil Work
JJM-KWA Hiring Vehicle -Hiring of vehicle with driver for One year for water sample collection under JJM Normal Survey and Sanitary Survey for Quality Contol Sub District Lab Kollengode -General Civil Work
JJM (2021-22) Phase-II- ARWSS to Krishnagiri Purakkkady and adjoining Villages-Providing Functional House Hold Tap Connections in Meenangadi GP
JJM ROAD RESTORATION WORK-Pro No-424-25-RENNOVATION OF SAMADANI ROAD IN WARD1
JJM- NABL Accreditation work for Setting up of Quality Control District Lab at Thiruvananthpuram
JJM ROAD RESTORATION WORKS -Pro No-507/25-RENNOVATION OF MANNATHIPPARAMBU VELUVIL KSHETHRAM ROAD
JJM VELIYAM -Balance work - distribution line -Balance FHTCs and water supply to elevated zones
JJM -2021-2022 -Conducting Topographical Survey with Electronic Total Station/DGPS for Avanur Panchayath
JJM ROAD RESTORATION WORKS-Pro No-503-25-NJALUPADAM ANGANVADI ROAD IN WARD 21
IMPLEMENTAION OF MWSS AT KUMMINIPPADY, MARIYAPURAM GP IN IDUKKI DISTRICT UNDER GWBDWS and JJM
DEPOSIT KWA JJM Restoration work in Villiappalli Chemmarathur road between km 1800 and 3400
JJM RESTORATION WORKS-Pro No-518-25-MEENADATHUR RAILWAYLINE DRAINAGE CONSTRUCTION IN WARD 14
JJM -2021-2022 -Conducting Topographical Survey with Electronic Total Station/DGPS for Kadappuram Panchayath.
JJM WSS to Devikulam and Chinnakanal Panchayath Survey and Investigation for Design Distribution Network
JJM -2021-2022 -Conducting Topographical Survey with Electronic Total Station/DGPS for Tholur Panchayath
JJM WSS to Chenkal Karode Kulathoor Topographical Survey at Chenkal Panchayath in Trivandrum District
JJM 2021-22 - Kuttoor Gramapanchayath- Supplying Laying balance distribution system Providing FHTCs - III SLSSC
JJM Support activities 2021-22- Automation of rural pump houses under PH section Kanhangad
IMPLEMENTAION OF MWSS AT NATTARIVAYAL , MARIYAPURAM GP- IN IDUKKI DISTRICT UNDER GWBDWS and JJM
JJM-2022-2023- IInd Phase -Extension of Pipelines and Providing FHTCs in Kanjirappally Panchayat
JJM- Phase II- Veliyanoor Panchayat- Balance work Kottayam District-Laying pipelines and Providing FHTCs
JJM)-WSS to Valavannur and Kalpakanchery GPs-LSGD Road Restoration in Valavannur Grama Panchayath
JJM-3rd SLSSC- Laying of Pipe Lines and Providing 2489 FHTCs in Puramattom Panchayath
JJM -2021-2022 -Conducting Topographical Survey with Electronic Total Station/DGPS for Nenmanikkara Panchayath
JJM-2020-21- Providing house hold tap connections in Mallappally Panchayat in Pathanamthitta district
JJM- RWSS to Cherukole Naranganam and Ranni - Construction of 10 LL OHSR at Anthyalankavu
JJM-WSS to Chungathara, Pothukallu, Edakkara and Vazhikadavu-Distribution networks in Chungathara HL Zone
NAVAIKULAM GP 2025 PJT 347 RESTORATION OF JJM PIPELINEROAD WORKS IN WARD 4(retender)
JJM- NABL Accreditation - Setting up of Sub District lab at Aruvikkara in Thiruvananthapuram District
JJM - NABL - Accreditation - Setting up of Quality Control Sub District Lab at - Valakam ,Kollam
JJM -WSS to Keezuparamba Panchayth in Malappuram Dt- Package VI - Providing Additional Pipe Lines
JJM-2020-21 -Pipeline Extension and Providing new FHTCs in Thottapuzhasserry Panchayath (Phase - II)
NAVAIKULAM GP PJT NO 349 RESTORATION OF JJM PIPELINE ROAD WORKS IN WARD 7
(JJM)-WSS to Padinjarathara panchayath----Road restoration for Padinjarathara Gramapanchayath - Zone II-Pipeline Work
JJM -2021-2022 -Conducting Topographical Survey with Electronic Total Station/DGPS for Kaiparambu Panchayath
JJM - Phase 2 -Providing Functional Household Tape connections to Makkaraparamb GramaPanchayath in Malappuram District
JJM-NABL Accreditation work for Setting up of Quality Control District Lab at Kollam
JJM - WSS to Kandanassery Panchayath - Soil exploration test at Proposed OHSR site at Kandanassery
JJM CWSS to Peringamala Grama Panchayath Construction of 1.50LL OHSR at Adiyodicolony Package 8
JJM - Kuttoor Panchayath Road Restoration Of Kallissery Vallamkulam Road due to Pipe laying Works.
JJM- WSS to Enadimangalam, Ezhamkulam, Erathu pts. Construction of 25 LL OHSR at Kunnathumala
JJM- SETTING UP OF NEW SUB DISTRICT LAB AT PALLIPPADU WTP HARIPPADU FOR NABL
JJM Kannur District Valapattanam Panchayath WSS to Kannur Corporation and adjoining Panchayaths Phase II
JJM 2022 24 CWSS to Peringamala Grama Panchayath zone II to IV Package 13
WSS to Velinalloor Pt JJM Work Renovation of Raw water Pump house at Attoorkonam
Laying Distribution network (HDPE pipe) and providing FHTCs
Laying Distribution network (PVC and HDPE pipe) and providing FHTCs
Laying Distribution network PVC and HDPE pipe and providing FHTCs
Laying Distribution network (HDPE pipe) and providing FHTCs