Loading…
Loading…
5,019 results • Best match
-Annual plan 2025-26 - Tanalur G P JJM Road restoration work- Pro. No. 525/26, Puthentheru - Kelappuram road renovation in ward 4
JJM 2020-21 Phase I (Part II)- Pipe line extension and providing FHTCs to various areas in Arpookkara Grama Panchayat - Kottayam District
JJM 21 22 Upgradation and shifting of sub district lab sulthan bathery for NABL accredation of chemical lab Civil and Electrical work
JJM - 2020-2021- Phase II-A4- C- Karakulam Grama Panchayath-Providing and Fixing Steel Storage tank at Kallayam in Karakulam Grama PanchayathPanchayat
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-BT Road Restoration Works of Panchayath Roads in EDAPPAL GP-General Civil Work
Deposit KWA JJM Pipeline Restoration work in Muttungal Nadapuram Pakramthalam road in between ch 10.310 to 11. 400 LHS General Civil Work
JJM Deposit work 2022 23 Restoration of trenching done by KWA at Payyappadi Ayarkkunnam Road Ch 0/000 to 1/082 km
JJM Ongoing WSS to Vellathooval Panchayth Supply erection testing and commisioning of main switch board MSB atr Raw Water Pump house Vellathooval
DEPOSIT Restoration work Under JJM Scheme in Koikkal Kattachira road at chainage 0 000 to 2 800 Restoration work General Civil Work
JJM 2021 24 CWSS to Nellanad Vamanapuram and Manickal panchayaths Phase III Providing FHTCs to remaining households in Vamanapuram and Nellanad panchayaths
JJM-WSS to Cheekode and adjoining Villages Muthuvallur GP-Phase IIIProviding Balance distribution and Road restoration in Muthuvallur Grama Panchayath.-Pipeline Work
JJM DER 2021 22 VITHURA GP -Pipeline Extensions and providing house connections in VITHURA GRAMA PANCHAYATH A1 FHTCS from ongoing scheme PART2
JJM WSS to Vengola and Rayamangalam Pts Replacing of AC distribution mains 2nd Reach from CH1440 to CH 2820 in Rayamangalam Panchayath
JJM 2021-22 - WSS TO ATHIRAMPUZHA PANCHAYATH - SUPPLYING AND LAYING DISTRIBUTION LINES AND PROVIDING FHTCs PHASE 2 EAST SIDE OF RAILWAY LINE
DEPOSIT Restoration work 2024 25 KWA JJM Kodannur Nedupuzha westfort road from ch 1 300 1 773 RHS General Civil Work 1
JJM 2021-22 Providing pumping lines supply line construction of new OHSR Pump house and 676 Nos. of FHTCs in Elikkulam Panchayat.
JJM support activities 2021-22-Automation of rural pump houses of RWSS to manjeswaram, Vamanjoor Kaje and Bangaramanjeswaram under PH Section, Kumbala
JJM Kerlassery Balance works WSS to Keralassery GP Providing distribution system in uncovered areas of the Panchayath and LSGD road restoration works
JJM WSS to Vengoor Asamannoor and Mudakuzha Panchayath Providing Distribution Network and FHTCs Pipe line Extension and providing FHTCs in Asamannoor Panchayath
JJM 5th SLSSC WSS to Kozhencherry Supplying and Laying distribution system and providing 1251 nos of FHTCs in Kozhencherry Panchayath Zone 2
JJM 2021 2024 CWSS to Pallickkal Madavoor and Navaikulam Panchayaths Phase II Road restoration work Velinalloor Oyoor Kurushummood Road General Civil Work
JJM -3rd SLSSC - Supplying and laying pipelines and providing 2316 FHTCs in Zone 4,5,6,7,8,9 in Ranni-Angadi Panchayath including road restoration works.
JJM-WSS to Vettathur Keezhattur Melattur GPs in Malppuram District Laying distribution line and providing FHTCs for Keezhattur GP - Pipe line work
jjm arwss to kulathuppuzha providing scour pipe for wash water disposal from kulathuppuzha plant to near by forest area pipe line work
JJM-3rd SLSSC- Koipuram Grama panchayath 2021-22-Final Phase-Package I-Laying of Pipe lines and providing 7667 FHTCs in Koipuram
Deposit work in Anicad -Enanelloor road 3/400 to 4/500 due to JJM cutting-General Civil Work
JJM Aryanadu and Uzhamalakkal panchayaths Supply laying testing and commissioning of 200mm DI K9 Clear Water Pumping Main from WTP to 5.5 LL OHSR at Vettichankunnu Pipeline Work
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 4 - Laying distribution line and providing balance FHTCs in Edappal Grama Panchayath PipelineWork
JJM Phase 2 Pampakuda Grama Panchayath Additional Proposal Extension amp Replacement of damaged Pipe line in non covered area Part 1-Pipeline Work
JJM-WSS KALLARA-REPLACING 63MM OLD AND DAMAGED PIPE LINE ALONG THUMPODE-OZHUKUPARA LINE REPLACING EXPOSED 160MM PVC PIPE USING 150 MM DI PIPE AT THOTTUMUKKU,UPGRADING UNDER SIZED 75 MM PVC PIPE FROM PATTARA TO VELLAMKUDY BY USING 160MM PVC PIPE
AMRUT 1 0 KOZHIKODE WATER SUPPLY PROJECT KOVOOR ZONE EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS KOVOOR DEVAGIRI ROAD Pipeline Work
AMRUT1 0 KOZHIKODE WATER SUPPLY PROJECT POTTAMMEL ZONE EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS PATTERI MAVOOR ROAD PUTHIYARA Pipeline Work
JJM- 5th SWSM - Providing 1027FHTCs in wards1,2,14 and15 of Aruvappulam Grama Panchayath by extension and replacing of pipelines including road restoration works.
JJM-2020-21- Rennovation of WTP at Malankavu and Improvement works to the existing Distribution System in Kadambanadu Panchayath- Surveying with electronic total station
JJM- Bedadka Panchayat- RWSS to Munnad and adjoining Villages Phase II- Source improvement- Construction of side protection wall near existing weir at Ramankayam
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Construction of Check Dam to the Downstream of Aruvippuram Bridge in Pullampara Grama Panchayath
DEPOSIT- KWA JJM PIPELINE TRENCH RESTORATION WORK IN AYOOR ITHIKKARA ROAD CH 0/000 TO 1/420 LHS and RHS-General Civil Work
JJM 2021 22 CWSS to Kalippara Water supply line extension and providing water connections from existing and proposed pipelines to households ofvellarada GP
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package11- Laying distribution line and providing balance FHTCs in Thavanur Grama Panchayath-Pipeline Work
JJM 21 22 KASARAGOD District Shifting of Sub District Lab Kasaragod to area under OHSR Pulikkunnu near Kasaragod Municipality Civil and Electrical Works
JJM-3rd SLSSC - CWSS to Pallickal Panchayath-Laying distribution system providing 3300FHTCs in Zone- 4(from Chakkanchiramala OH Tank) including road restoration works.
JJM -2021-22- Anthikkad Gramapanchayath - CWSS to KPCTA and WSS to Chazhoor, Thanniam, Anthikkad panchayath (on going scheme) - Laying pipelines for distribution strengthening
JJM - 3rd SLSSC - WSS to Kollamula and Vechoochira Panchayaths - Construction of OHSR, GLSR, Sump cum Pumphouse and Pumping main and road restoration works.
JJM-Augmentation of CWSS to Chithara and adjoining panchayaths -Construction of 9m dia well cum Pump house, supply, and laying of pumping main.
JJM-5th SLSSC - Supplying and Laying distribution system and Providing 4209 FHTCs in Thiruvanvandoor Grama Panchayat in Alappuzha District -including road restoration works
JJM-2020-2021-Phase II -WSS to Akalakkunnam Panchayat-Kottayam District- Packges2 Supply and Laying distribution networks from Karimpani Tank and Providing FHTCs
JJM-5th SLSSC- Koipuram Grama panchayath 2021-22-Final Phase-Package 2-Full Coverage-Laying of Balance Pipe lines for Last Mile Connectivity.
JJM 2021-22 - Supply ,installation,testing and trial running of Rectangular Water Baths in various Quality Control Labs under Quality Control Division, Kozhikode
JJM-WSS to Tanur Municipality and adjoining four Panchayaths in Malappuram District-PWD Road Restoration BM BC-Tanalur HL GP-General Civil Work
KWA JJM-Hiring of a vehicle with driver with valid license having cubic capacity between 1000cc and 1500cc for KWA, Project Division, Nattika