Loading…
Loading…
5,019 results • Best match
JJM-CWSS to Ponnani adjoining Panchayaths Phase 2 - Road Restoration Work for Panchayath Roads-Perumpadappu Panchayath - Package 5B-General Civil Work
JJM - 2020-2021- Phase II-A4-A- Providing Functional House Hold Tap Connections and Pipe line extensions in Karakulam Grama Panchayat
JJM Pattazhy Vadakkekkara- Renovation of Existing GLSR at Chelikkuzhy and constructing compound wall around OHSR of Manampuvila in Pattazhy Vadakkekkara Panchayath
JJM-WSS to Tanur Municipality and adjoining four Panchayaths in Malappuram District-PWD Road Restoration BM BC-Cheriyamundam -General Civil Work
JJM- Water supply scheme to Pattazhyvadakkekara Grama Panchayath in Pathanapuram Constituency - Constructing 3.00LL capacity OHSR at Koippallymala in Pattazhy vadakkekara Panchayath
JJM-CWSS to Ponnani adjoining Panchayaths Phase 2 - Road Restoration Work for PWD Roads-Perumpadappu Panchayath - Package 5A-General Civil Work
JJM RWSS to Thabore Supply and laying 150 mm DI GI Pumping main from Thabore Pump house to proposed OH tank
JJM Edayur GP Providing FHTCs from Ongoing scheme WSS to Irimbiliyam and Valancheri and WSS to Edayur Panchayth to Edayur Panchayath
JJM -5th SLSSC - Laying distribution system and providing 4182 FHTCs from proposed OHSR in Pandalam Thekkekara panchayath including road restoration works
JJM WSS to Pananchery Puthur and Madakkathara Panchayaths Soil exploration test at proposed OHSR site at Palakunnu Kuthiran Murikkumpara and Chocherikunnu
JJM-Kannur District - Setting up new Quality control sub district lab at Kuzhichal OHSR in Thaliparamba Block-Civil and Electrical Works
JJM CWSS to Elevanchery Pallassena, Erimayur Puducode and Kavassey Panchayaths in Palakkad Dist. Phase II Alathur Maruthamthadam PWD Road restoration works.
JJM Anchal Phase II- JICA gap closing works and extension of existing pipe line for additional coverage of Anchal Grama Panchayath
JJM - CWSS to Karulai, Amarambalam, Moothedam and Chokkad Panchayaths-PACKAGE - III- Construction of 27 MLD WTP at Arakkumpouyilkunnu-General Civil Work
JJM Pallikkal Grama Panchayth Supply and laying of 200mm DI K9 160mm PVC and 90mm PVC in Kottapuram Kakkancheri PWD road
DEPOSIT-JJM- DEPOSIT WORK II IN CHADAYAMANGALAM PALLIKKAL ROAD-CH 2/650 TO 5/850 LHS CHADAYAMANGALAM LAC-General Civil Work
JJM-CWSS to Ponnani adjoining Panchayaths Phase 2 Road Restoration Work for PWD Roads-Maranchery Panchayath - Package 3A-General Civil Work
JJM - Peruvayal - online Booster Stations - Providing online boosters at 5 locations (ward no. 8,18,19 and 21) in Peruvayal Panchayath - reach 1
JJM WSS to Edathala,Keezhmad and Choornikkara Panchayath Providing distribution system and FHTCs for Edathala panchayath in various wards Part II
JJM 2022 2024 CWSS to Adjoining Panchayaths of Varakala Phase II Laying 600mm RWPM for 120m along Alamcode Kadakkavoor Anchuthenghu Road
JJM-Augmentation of CWSS to Chithara and adjoining panchayaths -Replacement of existing AC transmission main from Madathara to Chingeli -Pipeline Work
JJM - 2020-2021- Phase II-A4- D- Karakulam Grama Panchayath- Replacing damaged MS pumping main at Enikkara in Karakulam Grama Panchayath.
DEPOSIT KWA Deposit work in Ottoor Chennancode road Restoration of Ottoor Chennancode road after JJM pipe laying works General Civil Work
JJM- 5th SLSSC- WSS to Naranamoozhy Panchayath- Providing 1348 FHTCs in Naranammoozhy Panchayath from ongoing schemes and by extension- Balance Work
JJM - Hiring of vehicle - Contract basis for the use of office of the Exe Engineer ,Project Division, Kottayam- 2026 -27 ( R1)
JJM - 2020-21 - Innovation-R and D-Sensor based real time monitoring system - Digital Automation of rural pump houses (10 Nos.) under PH Section Alathur (Phase-II)
DEPOSIT Restoration of JJM pipe line trnches on Pengad- Alungal road km 4- 500 to 5 -900 RHS Kondotty LAC General Civil Work
JJM 202122 Setting up upgradated operation of laboratories NABL accreditation Shifting and setting up of the existing Quality Control Sub District Lab of Chittur block to the first floor level space of OH tank, near Chittur Muncipality office
JJM-2020-2021-Phase II -WSS to Akalakkunnam Panchayat-Packages 4-Kottayam District-Laying distribution networks from Paduva tank and Providing FHTCs
JJM-Supply and installation of 20 KVA online UPS with SMF Battery and Battery stand for Quality Control District Lab Thrissur
RWSS to Kulashekharapuram - Supplying and Laying 110 mm PVC CL 3 pipe to replace old and damaged 100/ 80 mm AC pipe, Interconnection work and Shifting of existing house connection at Puthiyacavu - Kattilkadavu
CWSS to Kadinamkulam Mangalapuram Andoorkonam Panchayath and Attingal Muncipality JJM 2021 24 Laying of 850 meter 500mm DI K9 Pipe and NH Crossing at Chainage 534 760 near Korani Pipeline Work
DEPOSIT JJM Restoration Work in Areekkaramukku Kannanakuzhi Road in CH 0 900 4 385 RHS LHS Areekkaramukku Kannanakuzhi Road in CH 0 900 4 385 RHS and LHS
JJM 2021-22 Phase II -Thirupuram Panchayat -Balance work-Providing FHTC to 50 nos HH and urgent interconnection work at Puruthivila Bye-pass crossing service road
AMRUT--2-WATER SUPPLY IN KUNNAMKULAM MUNCIPALITY-Part-1-Supplying and laying distribution network and providing FHTC -3100 nos in Kunnamkulam Muncipality General Civil Work
J J M Providing FHTC to rural households in Chengamanad Panchayath Supply errection testing and commissioning of 40 HP Centrifugal pump set in Chowara plant
Jala Jeevan Mission - 2021-22 - Augmentation of WSS to Nattika Firka - Phase II - Providing distribution network and FHTC and existing tank strenthening to Thalikulam Panchayath
AMRUT 1 Providing FHTC to households in Thrissur Corporation Area Package 14 Construction of Intake Well Cum Pump House Ramp at Mulayam General Civil Work
JJM 2023-24 Kottukal Grama PanchayathSupplying Laying Testing commissioning of 300 DI Clear water pumping main from Pongil to Kattachalkuzhi OHSR-Part -4
JJM-WSS to Tanur Municipality and adjoining four Panchayaths in Malappuram District-LSGD-Road Restoration(BT)-Niramaruthur Grama Panchayath-General Civil Work
JJM-WSS to Tanur Municipality and adjoining four Panchayaths in Malappuram District-PWD Road Restoration BM BC -Ponmundam GP-General Civil Work
JJM Kannur District Muzhappilangad Panchayath WSS to Anjarakandy Peralassery and adjoining Panchayath Phase II Balance work Laying distribution system and providing FHTCs
JJM Pathanapuram Grama Panchayat (For last mile connectivity) - Minor line extension and last mile connectivity by using 50mm and 63mm pvc pipes
JJM Upgradion of existing Quality control Sub District Lab at Parappanangadi in malappuram District and obtaining NABL accreditation civil and Electrical works
DEPOSIT KWA JJM Pipe line Trench restoration on Morayur Ozhukur Ekkaparambu Road km 0 000 to 5 000 Restoration General Civil Work
DEPOSIT RESTORATION WORK IN CHENGAMANAD KADAKKAL ROAD KWA JJM TRENCH RESTORATION WORK FROM CH 21290 TO 29410 CHADAYAMANGALAM LAC General Civil Work
JJM - 3rd SLSSC - WSS toNaranamthodu (Ranni-Peruadu Pt) Laying of 200mm DI K9 pipeline from Nilakkal to Aryattukavala including road restoration works
JJM WSS to Vellathooval Panchayath in Idukki District Renovation of Existing GLSRs and Pre Commissioning Works of Vellathooval Scheme-General Civil Work
JJM BAWSS to Kundara and Adjoining Pt Electrical and Mechanical maintenance Supply and fixing 2kg per Hrcapacity chlorinator and accessories at ElampalWTP
JJM 2022 23 WSS to Panachery Puthur and Madakathara Panchayaths. Construction of 9.5LL GLSR at Chocherikunnu in Puthur Panchayath General Civil Work