Loading…
Loading…
5,019 results • Best match
JJM-WSS TO THRIPANGODE MANGALAM PURATHUR THALAKKAD AND VETTOM GPs--CONSTRUCTION OF 41 LL OHSR AT BP ANGADI FOR VETTOM AND THALAKKAD-General Civil Work
DEPOSIT-Restoration work for K W A pipe laying -JJM in Thanissery Karanchira road ch 0/400 to 0/990-Restoration work-General Civil Work
JJM Balance work of 2022-2023 Extension and Replacing of pipelines and providing 200 Nos of FHTCs in Nedumpuram Panchayath in Pathanamthitta Dist-Pipeline Work
JJM 2021 24 Kuttichal Poovachal Panchayaths CWSS to Mannoorkara Veeranakavu and Perumkulam villages Phase II Supplying Laying Testing and Commissioning of Clear Water Pumping Main
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Distribution System Providing Pipelines and Pipeline Extensions and 566 FHTCs in Various Wards of Panavoor Grama Panchayath
JJM-Phase 3- CWSS to Edappal and adjoining Panchayaths-Package 6 - Construction of 25 LL Capacity OHSR at Changaramkulam for Nannamukk Panchayath-General Civil Work
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 8 - Construction of 16 LL Capacity OHSR at Kokkur for Alancode Panchayath-General Civil Work
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Road Restoration - Panchayath BT roads after laying pipe line works in ALANCODE PANCHAYATH-General Civil Work
JJM-WSS to Vazhikadavu AND ADJOINING PANCHAYATHS Additional requirements for LSGD BT and amp, Concrete Road Restoration works in entire Project area -General Civil Work
JJM -5th SLSSC- Providing 2617 FHTCs and Pipeline extensions in all wards of Kunnamthanam Panchayath including supply and erection of pumpset and road restoration works.
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-PWD Road Restoration work in Chalissery-Valayamkulam Road Othalur - Pavittapuram in Alancode Panchayath-General Civil Work
JJM Kundara panchayath- BAWSS to Kundara and adjoining panchayaths- Replacement of old 500mm AC transmission main with 500mm DI pipe from padinjaretheruvu to Pulamon jn.
JJM 2021-22 3rd SLSSC - Ezhumattoor Grama Panchayath -Pipe line extension and Providing 120 Nos. FHTCs along Ezhumatoor - Vazhakala Road before PWD, BMBC Renovation work
JJM - Hiring of a vehicle (below 1500CC motor cab) for the use of Quality Control Sub District lab, Kollam for 1 Year for Ward Survey
JJM Setting up of new Quality Control Sub District lab below OHSR at Tirur and obtaining accreditation of NABL estimate for civil and Electrical works
JJM 21 22 KASARAGOD District Setting up of Chemical and Bacteriological lab for obtaining NABL accreditation for Quality Control District Lab Kasaragod Civil Electrical works
JJM- WSS to Edarikode-Multi GP CWSS to Thennala Perumanna cari and Ozhur pts Construction of 10 m dia well at Perumpuzha in Kadalundi River
JJM-5th SLSSC -WSS to Kulanada - Mezhuveli-Supplying and laying of distribution system and providing 4507 FHTCs in Mezhuveli Panchayat line including road restoration work
JJM Phase -II WSS to Mampad Package -1 A Source Improvement RW Pump-set And Pumping Main Wash Water Disposal Line Transformer and Allied Works
JJM WSS to Aloor and kodakara Part 1 Panchayaths in Thrissur Dt Construction of 12LL OHSR at Porunankunnu and Valve chamber Structural Design Work 1
JJM-CWSS to Ponnani adjoining Panchayaths Phase 2 Construction of 10 LL Capacity OHSR in Veliyancode Panchayath of Malappuram District-Package 2C General Civil Work
JJM-RWSS to Elampalloor Panchayathu - Replacing old damaged 100 mm CI pipe with 100 mm DI K9 pipe from Punukkannoor old pumphouse to Colony tank
JJM-3rd SLSSC-WSS to Enadimangalam, Ezhamkulam, Erathu and Kalanjoor (part)- Laying distribution system and providing 7853 FHTCs in Erathu Panchayath.- including road restoration work .
JJM Phase I 2020 21 Velinalloor Grama Panchayath Providing functional House hold tap connections and providing pipe line extensions in Velinalloor Grama Panchayath PART III
JJM 2021 2022 Setting Up Of Quality Control District Lab Malappuram At Naripparamba Thavanur Grama Panchayath Ponnani Taluk And Malappuram District Civil And Electrical Works
JJM-Providing FHTCs to Kuttipuram Thirunavaya ,Athavanad and Marakkara Panchayaths-Kuttipuram panchayath in Malappuram dt Survey works for distribution,pumping main,WTP and tank site.
JJM-CWSS to Thrikkalangode Porur and Pandikkad Panchayaths in Malappuram District-Supply, Erection and Commissioning of Clear Water Pumpsets at Kunnumpuram Thrikkalangode-General Civil Work
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Road Restoration - Panchayath BT roads after laying pipe line works in VATTAMKULAM PANCHAYATH-General Civil Work
DEPOSIT KWA JJM Restoration work 2024 25 Sasthamkkadavu Kodannur Chakyarkadavu Road from ch 1 075 to ch 2 853 RHS Civil works General Civil Work
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 11(E) - Distribution main from Koorada OHSR to Nariparambu Through PWD-OLD NH.-Pipeline Work
JJM CWSS to Idukki Kanjikuzhi, Vazhathope Mariyapuram, Kamakshi Vathikudy and Vannapuram (Part) Panchayaths in Idukki District Control Room and Surveillance unit for Floating Pumping Station
DEPOSIT-JJM-Deposit work 2025-26-Urgent restoration work to West Tippu Sulthan Road km17/800 to 20/600 due to pipe laying of KWA
AMRUT Providing FHTC to households in Thrissur Corporation Area Package 16 Floating intake structure at Peechi dam Additional works Construction of operator room with sheet roofing General Civil Work
AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ELATHUR ZONE-Pipe line work- Replacing old and obsolete pipelines, extension of pipe lines 160 MM PVC and providing FHTC in various divisions
JJM2020 21 Kizhakambalam anchayathin Ernakulam District phase II part 1 Extension of Pipe Line in Ward no 5,6,7and 9 and Providing Functional House Hold Tap Connections FHTC Balance works
Jal Jeevan MissionCWSS to Nattika Firka Nattika Grama Panchayath SWSM Reappropriation Construction of 5 LL OHSR at Nattika Sub Division Office Soil investigation
AugmentationofRWSStoElanji Panchayath SurveyInvestigationconstructionof 9 LL OHSR atKoorumalaSupplyingandlaying250mm pumping main from KakkadWTPto KoorumalaOHSRandSupplyingandlaying distributionlineandgivinghouseconnectionsand providing FHTCs.Part1
AugmentationofRWSStOThirumarady PanchayathSurveyInvestigationconstructionof9 LLOHSRatMandalammalaSupplyingand laying250mmpumpingmainfromKakkadWTP toMandalammalaOHSRandSupplyingand layingdistributionlineandgivinghouse connectionsandprovidingFHTCsPart1
JJM 2021-2023 -RWSS to Aruvikkara ,Vellanad and Aruvikkara Supplying laying testing Commissioning 200 mm DI K9 From Mullelavinmoodu to Kannamkara Pump House and 150 mm DI K9 Clear water gravity main from Kannamkara Pump House to Ponthanpara GLSR.
JJM 2020 21 Setting up Up gradation Operation of Laboratories for WQMS Procurement of 10nos Rectangular Water bath with stirrer for various Quality Control Laboratories of Kerala Water Authority
DEPOSIT Restoration to KWA JJM trenching in Mathurappa Vayaykal road ROW 10106431/116816 ch 0/000 to 2/000 LHS amp RHS WORK General Civil Work
JJM Setting up of new Quality Control Sub District lab below OHSR at Chullikkod Padapparambu and obtaining accreditation of NABL estimate for civil and Electrical works
JJM 2023 24 Kottukal Panchayath Supplying Laying Testing and commissioning of 150mm DI K9 clear water pumping main from Punnakulam Sump to Pulinkudi OHSR Part 6
DEPOSIT KWA JJM Balance Restoration work Urgent temporary restoration work for NAD-HMT road from Cochin Bank Junction to Manalimukku LHS of road General Civil Work
JJM-WSS to cheekode and adjoining villages Cherukavu Gpt of Malappuram district -Phase II-Providing Balance distribution and Road restoration in Cherukavu Grama Panchayath.-Pipeline Work
JJM-2021-22 CWSS to Karulai Amarambalam Moothedam and Chokkad Gramapanchayaths in Malappuram Dist Topographical Survey work with Electronic Total Station and DGPS for Karulai Panchayath
JJM- 2020-21 - KOTTAYAM DISTRICT - WSS TO VELLAVOOR PANCHAYAT - SUPPLYING AND LAYING DI/PVC/GI DISTRIBUTION NETWORK AND PROVIDING FHTCs IN VELLAVOOR PHASE I - Package 3
JJM-2020-21-Phase-2 - Balance work - Water supply to Quality affected habitations - Providing Iron removal Plant for Chelliparambu area in ward-11 of Kannambra Pt.
JJM-5th SWSM -WSS to Enadimangalam, Ezhamkulam, Erathu and Kalanjoor(part) -Supply and Laying distribution in Kalanjoor Panchayath and Providing 3000 FHTCs - including road restoration work
JJM-2020-21-Phase-2 - Balance work - Water supply to Quality affected habitations - Providing Iron removal Plant for Palakuzhy area in ward-10 of Kizhakkenchery Pt.