Loading…
Loading…
5,054 results • Best match
Transportation of coal from Wagon Tippers to JT2 underneath the conveyors 1A/1B,2A/2B,3A/3B,UC-1 & RC-1 galleries and Surroundings of JT2 to Un crushed coal yard and removal of chute jam coal in mansoon season from WTs to JT2 in MMSD-1 of CHP/Dr.MVR RTPP for the period of the year 2025-26
10, 20, 30, 40, 50, 60, 70, 80, 90, 100, 110, 120, 130, 140, 150, 160, 170, 180, 190, 200, 210, 220, 230, 240
00010 M5507446009 BELT, CONVEYOR, NN 400/3, 2200MM (Q3)
Repair and Overhauling Service - CONCLUDING REPAIR RATE CONTRACT FOR OFFLOADING OF REPAIR AND REFIT OF IN SHIPS MARINE ASSETS INCLUDING DRYDOCK AND MACHINERY EQUIPMENT; ANY OTHER SUITABLE BRAND; No; Buyer Premises
Repair and Overhauling Service - REMOVAL REPAIR OVERHAUL REFURBISHMENT SHOP FLOOR TRIALS REFITMENT ONBOARD TRIALS AND PROVING OF ELECTRICAL EQUIPMENT MACHINERY ONBOARD SHIP; REMOVAL REPAIR OVERHAUL REFURBISHMENT SHOP FLOOR TRIALS REFITMENT ONBOA..
2026-HOR01-CB-350- Taskforce for Engaging one no. of 5.50Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in PENDURTHI ZONE including all machinery & Crew etc.,
Engaging/Hiring of Necessary Machinery for improvement of bund for Ippatam Cheruvu beside Railway Gate Ippatam village Tadepalli Rural in AE-4 Section in Mangalagiri Tadepalli Municipal Corporation under General funds
2026-HOR01-CB-106- Taskforce for Engaging one no. of 5.50Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in PENDURTHI ZONE including all machinery & Crew etc.,
2024-HOR01-CB-118- Proposals for duly engage of one tipper for tree branches pruning , lifting of tree waste including all machinery and crew for 300 days in zone- VII (Anakapalli)
2024-HOR01-CB-121- Proposals for duly engage of one tipper for tree branches pruning , lifting of tree waste including all machinery and crew for 300 days in zone- VIII (Pendurthi)
Engaging/Hiring of Necessary Machinery for improvement of bund for Ippatam Cheruvu beside Railway Gate Ippatam village Tadepalli Rural in AE-4 Section in Mangalagiri Tadepalli Municipal Corporation under General funds
Annual repairs and maintenance of all types of light and heavy PH Section sanitation vehicles and Earth mover machinery working in Zone VIII of GVMC for the financial year 2023 24
2024-HOR01-CB-124- Task force- Proposals for duly engage of one tipper for tree branches pruning , lifting of tree waste including all machinery and crew for 300 days . (Gajuwaka zone)
SUPPLY OF 1000 TPH ROTOR ASSEMBLY SETS FOR RING GRANULATORS OF COAL CRUSHER HOUSE
REPAIR KIT, NMNESR, COMPRESSOR, 63452726, REPAIR KIT, NMNESR, COMPRESSOR, 63452728, O- RING, 130449175, NMNESR, COMPRESSOR, GASKET, 102455102, NMNESR, COMPRESSOR, GASKET, 1- 010-000042, NMNESR, COMPRESSOR, CONICAL CLAMPING SLEEVE, 102059005, NMNESR, ... NMNESR, COMPRESSOR , ... NMNESR, COMPRESSOR , ... NMNESR, COMPRESSOR , ... NMNESR, COMPRESSOR , ... NMNESR, COMPRESSOR , ...
Picking of shale, stone oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.50 Meters per second pertains to CHP for the period of 7 months (September 2024 to March 2025).
Picking of shale, stone oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.50 Meters per second pertains to CHP for the period of 7 months (September 2024 to March 2025).
Wetting, poking and clearing of jammed coal in the 48 No.s BOBR Hoppers through 6A/6B Conveyor in CHP-Stage-I&II- Dr.NTTPS for the period from 01.04.2025 or from commencement of work to 31.03.2026 or till exhaust of quantities
Overhauling of Electrostatic Precipitators of Units-3&4 boilers during Annual Overhaul period for the year 2026-27.
Carrying out miscellaneous shrouding of units-3&4 boilers during annual overhaul period for the year 2026-27.
SUPPLY OF E-7018 WELDING ELECTRODES OF VARIOUS SIZES FOR HP-1203 BOWL MILLS OF UNIT-IANDII BOILERS
Procurement of Spares for Boiler Feed Pump model:FK6D30
Repairs to Hot primary air bus duct APH outlet to venture duct and venture ducts of pulverizing mills and cold air primary air duct in the boiler of Unit 1 during the running and overhaul period 2020 21
Overhaul works on Boiler pressure parts for replacement of eroded water wall tubes, DNPSH & PSH, Carrying out cracked fin welding where ever required during D meter survey at Unit-6/Stage-IV during annual overhaul period 2020-2021
Repairs of Hot primary air bus duct (APH outlet to venture duct) and venture ducts of pulverizing mills and cold air primary air duct in the boiler of unit- 1 during the running and overhaul period 2021-22
Repairs of Hot primary air bus duct (APH outlet to venture duct) and venture ducts of pulverizing mills and cold air primary air duct in the boiler of unit- 1 during the running and overhaul period 2022-23
Replacement of Worn out Grinding rolls, Bull ring segments, Vane wheel assembly, Bull ring clamping ring, Bowl extension ring & other connected mill internals and other repair works for Mill-1B of Unit-I Boiler with necessary T&P
Replacement of Worn out Grinding rolls, Bull ring segments, Vane wheel assembly, Bull ring clamping ring, Bowl extension ring & other connected mill internals and other repair works for Mill-1B of Unit-I Boiler with necessary T&P
Removal & re fixing of aluminum insulation sheeting on hot venture ducting of mills, Hot air bus ducts, Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit-7 during the year 2021-22.
Certain Maintenance works (Break down and Repair works) and Overhauling of FD fans and ID Fans including their lube oil systems of Unit-3 Boiler including T&P and consumables during running and overhaul period in 2025-26
Replacement of Worn out Grinding rolls, Bull ring segments, Vane wheel assembly, Bull ring clamping ring, Bowl extension ring & other connected mill internals and other repair works for Mill-1B of Unit-I Boiler with necessary T&P
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-3/Stage-II Boiler including T&P and consumables during overhaul period 2024-25
Repairs to Hot primary air bus duct (APH outlet to venture duct) and venture ducts of pulverizing mills and cold air primary air duct in the boiler of unit- 2 during the running and overhaul period 2022-23
Replacement of Cold end Sector plates Secondary air to Flue gas side1 no per each APH on Air preheaters 7A and 7B in unit 7 Boiler during the Annual overhaul Capital overhaul period in the year 2024 25.
Certain Maintenance works (Break down and Repair works) and Overhauling of FD fans and ID Fans including their lube oil systems of Unit-3 Boiler including T&P and consumables during running and overhaul period in 2025-26
Certain Maintenance works (Break down and Repair works) and Overhauling of FD fans and ID Fans including their lube oil systems of Unit-3 Boiler including T&P and consumables during running and overhaul period in 2025-26
Overhaul works on 6.6KV. HT Motors and its Auxiliary LT motors and general cleaning maintenance works on 6.6KV motors of Boiler,Turbine and common auxiliaries of Unit-5 during the annual overhaul period for the year 2025-26.
Overhaul works on 6.6KV. HT Motors and its Auxiliary LT motors and general cleaning maintenance works on 6.6KV motors of Boiler,Turbine and common auxiliaries of Unit-6 during the annual overhaul period for the year 2025-26.
Fabrication of new adjustable coal nozzle tips 26" inch size with devider plates Y & Z arrangements for all corners 2 & 4 and 1& 3 of unit 3&4 boiler and load hanger guards during the year 2025-26.
Supply of Refrigerant Compressor Oil heater and Compressor Oil forTAC dryer of ash handling system of NTPC KUDGI
2025-HOR01-CB-168- Taskforce for Engaging one no. of 6Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in Zone-V (Gnanapuram) including all machinery & Crew etc.,
Gudur Municipality - Navarathnalu - Pedalandariki ILLU - Jungle Clearance cutting the heaps and filling of dips by machinery levelling the site and formation of roads with Gravel at Survey No.2058 of west Gudur
Gudur Municipality - Navarathnalu - Pedalandariki ILLU - Jungle Clearance cutting the heaps and filling of dips by machinery levelling the site and formation of roads with Gravel at Survey No.2055 of west Gudur
Gudur Municipality - Navarathnalu - Pedalandariki ILLU - Jungle Clearance cutting the heaps and filling of dips by machinery levelling the site and formation of roads with Gravel at Survey No.2131 of west Gudur
2025-HOR01-CB-166- Taskforce for Engaging one no. of 6Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in Zone-VI (GAJUWAKHA ) including all machinery & Crew etc.,
2025-HOR01-CB-169- Taskforce for Engaging one no. of 6Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in Zone-II (Madurawada) including all machinery & Crew etc.,
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 248/000 to Km 250/580 & TS, 1L, 3L & 73 DP in Hanwal Section of RBLLC.
2025-HOR01-CB-167- Taskforce for Engaging one no. of 6Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in Zone-IV (SURYABAGH ) including all machinery & Crew etc.,
2025-HOR01-CB-165- Taskforce for Engaging one no. of 6Cmt. Tipper on hire basis for tree branches pruning, lifting the tree waste in Zone-III (Asilmetta ) including all machinery & Crew etc.,
(a) Repairs and Maintenance of Mobile Equipment, other Plants, Machinery and Equipment etc. (b) Manning and Operation of various facilities and installations located in Shipbuilding (SB) Yard and Ship Repair (SR) Complex.