Loading…
Loading…
5,054 results • Best match
Repairs & Maintenance of 6 Nos. Earth Movers Machinery of PH section working in Zone-II of GVMC for a period of one year i.e., from 01.04.2022 to 31.03.2023.
Operation and Comprehensive Maintenance of canteen equipment and other machinery at various places and outside temple under Mechanical subdivision at Tirumala for the year 2024-2026 (Two years)
Repairs & Maintenance of 3 Nos. Earth Movers Machinery of PH section working in Zone-VII of GVMC for a period of one year i.e., from 01.04.2022 to 31.03.2023
Repairs & Maintenance of 6 Nos. Earth Movers Machinery of PH section working in Zone-VI of GVMC for a period of one year i.e., from 01.04.2022 to 31.03.2023
Repairs & Maintenance of 6 Nos. Earth Movers Machinery of PH section working in Zone-IV of GVMC for a period of one year i.e., from 01.04.2022 to 31.03.2023.
Air Filter prt 2914930200, OIL SEPERATOR KIT 2903775400 GAE22, FILTER OIL 2903752501 GAE22, Min Press Valve kit 2901099700, THERMOSTATIC VALVE 1622706403, MOTOR SERVICE KIT 1092000232 GAE22, SCAVANGING LINE 2901107700 GAE22, AIR HOSE RUBBER ... GA15 compressor , ...
Quenching of fires and wetting of coal, Drawing Diesel for Dozers, Cleaning Dozers Filters and General materials Drawals clearing of accumulated Scrap and all unwanted materials from all TPs and conveyors, etc., and clearing of coal jams in chutes round the clock for Stage-IV/CHP for the period from 01.04.2023 to 31.03.2024
Please refer item description 1, Please refer item description 2, Please refer item description 4, Please refer item description 5, Please refer item description 7, Please refer item description 8
VZ9700002128, VZ9700002136, VZ9700002144, VZ9700002152, VZ9700002160
ELGI AIRUBE UT SYN PLUS 20L (5.3G) Oil f [ELGI AIRUBE UT SYN PLUS 20L (5.3G) Oil for EG110-13 compressor of ELGI make. Make: ELGI or its authorized dealers only.]
Complete Discharge Drum Assembly Part No G0910R, Complete Tandem Drive Drum Assembly 650MM Part No G0710DR, Complete Deflector Drum Assembly Part No G2010R, Complete Tail Drum Assembly Part No G1110R, Loop Take Up Trolley Part No G1710, Equalizing Gear in Set of 2 Nos Part No G067590
INPUT SHAFT 1090, 1ST STAGE GEAR AND PINION IN SET 1118C90, FIRST INTERMEDIATE SHAFT 2090, COMPLETE TANDEM DRV DRVN DRUM ASSY 650MM CA469010, EQUALISING GEAR IN SET OF TWO NOS 529010, DISCHARGE DRUM 6190, DEFLECTOR DRUM 6390, TAIL DRUM TD90, TAKEUP DRUM TUD90, LOOP TAKEUP TROLLEY 90 KW LTT90
10, 20, 30, 40, 50, 60, 70, 80, 90, 100, 110, 120, 130, 140, 150, 160, 170, 180, 190, 200, 210, 220, 230, 240, 250, 260
Maintenance works (Break-down and repair works) for ESP of Unit-II i.e.,EERM , CERM &GD rapping gear boxes ,shaft bearings &drives as and when required during the year 2019-20 for Unit-II Boiler
Maintenance works (Break-down and repair works) for ESP of Unit-II i.e.,EERM , CERM &GD rapping gear boxes ,shaft bearings &drives as and when required during the year 2019-20 for Unit-II Boiler
Replacement of eroded and defective water wall and screen tubes, Metal build up on eroded portions and fin welding of pressure parts in Unit-4 boiler during annual overhaul period for the year 2025-26
Replacement of eroded and defective water wall and screen tubes, metal build up on eroded portions and fin welding of pressure parts in Unit-3 Boiler during annual overhaul period for the year 2022-23
Cutting and Removal of badly damaged bent collecting electrodes U guides Shock bars Support angles from 2A12 both hoppers in ESP A pass of field of Unit 2 boiler include all T and P consumables
Repair and Overhauling Service - REMOVAL REPAIR OVERHAUL REFURBISHMENT SHOPFLOOR TRIALS REFITMENT ONBOARD TRIALS AND PROVING OF ELECTRICAL MACHINERY EQUIPMENT ONBOARD IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
DISMANTLING, RE-INSTALLATION AND RE-COMMISSIONING OF EXISTING MACHINERY FROM ALTERNATE SITES TO NEW DMC FOR THE PROJECT AUGMENTATION OF DRY DOCK AND SLIPWAY PH-III AT ND(V)
Manufacture, supply and delivery of machinery to cleaning the UGD lines with sewer rodding machine to water supply and sewerage maintenance to AE-12&14 sections in Zone-III
Providing machinery such as Hydraulic Excavator and Tractor on hire basis for removing illegal pipe lines etc. in HLC No.2 Section, HPC for the period of two months.
Providing Ground Leveling with Men and Machinery at IGMC Stadium premises for Independence Day Celebrations 2019. (Hiring of JCB, Tractor, Dozer, Rollers etc.,) 1st call General Funds / Government Funds
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 194/000 to Km 204/000 in Holagunda No.2 Section of RBLLC.
Operation and comprehensive maintenance of canteen equipment and other machinery at various places and outside temple under Mechanical sub-division at Tirumala for the year 2022-24(Two years)
Carrying out rectification works of SS gratings for eco, LTR and LTS area gratings, providing new T pieces in place of missed, damaged T pieces Inspection and adjustment of set values of constant load hangers and Flushing of Bottom ring header of ... VI Boilers during ...
SUPPLY OF SHAFT WITH BEARING ASSEMBLY SPARES FOR PA FD FANS OF UNIT- I ANDII BOILERS
SUPPLY OF SPARES FOR JOURNAL SPRING ASSEMBLY OF HP-1203 BOWL MILLS OF UNIT-IANDII BOILERS
Cleaning and clearing of ash settled at various locations of boiler Cleaning of all floors from 0 mts to Drum level with air after overhauls Inspection and adjustment of set values of constant load hangers and spring hangers of various link pipes and ... 2 boiler during ...
SITC of Non Inline Departure conveyor system for 24 Nos Check In Counters and 02 Nos Flat Arrival Carousel Systems including Operation for 07 Years and AICMC for 05 Years after 2 Years of DLP at Kadapa Airport
Plasma Cutting Machine set with requirement as per specification attached, with Plasma cutting machine 1 no, torch 1 no, DG set 2 nos, compressor 1 no, as per the detailed specification enclosed.
Supply of 20 HP ELGI compressor with working pressure 30 bar along with 500 ltrs receiver tank pertaining to Mechanical Section, Mechanical Sub Division of Dam Power House and Hampi Power House
Supply of 20 HP ELGI compressor with working pressure 30 bar along with 500 ltrs receiver tank pertaining to Mechanical Section, Mechanical Sub Division of Dam Power House and Hampi Power House
Supply of 20 HP ELGI compressor with working pressure 30 bar along with 500 ltrs receiver tank pertaining to Mechanical Section, Mechanical Sub Division of Dam Power House and Hampi Power House
Plasma Cutting Machine set with requirement as per specification attached, with Plasma cutting machine 1 no, torch 1 no, DG set 2 nos, compressor 1 no, as per the detailed specification enclosed.
Custom Bid for Services - Compressed air and N2 leak survey Similar Category Survey or Market Research Services/Program evaluation or assessment survey services/Feedback Survey Operation And Maintenance Of Gas Compressor Station
Procurement of AI based wireless temperature and vibration monitoringsystem for High rise conveyors of CHP of TSTPS
Emergency coal clearing of coal heaps in Wagon Tipplers- 1to 4 , slurry coal, jammed coal and wet coal in crushers, vibrating screens& belt feeder chutes & poking of bunkers in M-1(conveyors), M-1(crushers), M-II & M-IV Sub-Divns./CHP(M.M)-I&II/Dr.NTTPS. as and when required during the year 2024-2025
Providing of patch repairs and carrying out of belt jointing works, edge repairs, relaging of pulleys and belt replacement works for the conveyor system from Bunker house to Transfer points and other required areas of CHP/Stg-IV
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.50 Meters per second pertains to General/CHP/SDSTPS for the period of 01.04.2025 to 30.09.2025.
Replacement of Worn out Grinding rolls Bull ring segments Vane wheel assembly Bull ring clamping ring Bowl extension ring and other connected mill internals and other mill repair works for Mill 2C of Unit II Boiler
Annual Maintenance Works Break Down and Repair works and overhauling of FD fans and ID fans including their lube oil systems of Unit II Boiler including T and P and consumables during the period 2018 19
Overhaul works on Boiler pressure parts for replacement of eroded tubes of LTSH,Back-pass and Economizer tubes where ever required during D -meter survey at Unit-7/ Stage-IV during annual overhaul period 2024-25
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-2 Boiler including T&P and consumables during overhaul period 2021-22
Breakdown works and repair works for ESP of Unit-2 i.e.,EERM ,CERM &GD rapping gear boxes ,shaft bearings &drives as and when required during running and overhaul the year 2023-24 for Unit-2 Boiler
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2026-27
Certain break down and repair works,adjustment of eroded grinding rolls and other repair works for HP-1103 Bowl Mills of Unit-8 Boiler Stage-V/Dr.NTTPS as and when required for the year 2025-26
Certain Maintenance works Break down and Repair works and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2025-26
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2021-22
Certain break down and repair works,adjustment of eroded grinding rolls and other repair works for HP-1103 Bowl Mills of Unit-8 Boiler Stage-V/Dr.NTTPS as and when required for the year 2025-26.