Break down works, Repair works and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-2 Boiler including T&P and consumables during overhaul period 2023-24
Cutting and Removal of badly damaged bent collecting electrodes, U guides, Shock bars, Support angles from 1B12 both hoppers in ESP-Bpass of field of Unit-2 boiler include all T& P consumables
Over hauling kit for (54 Months) Compressor type 3 HC55 of M/s kirloskar make:54 months Replacement kit -0912012600.4.(Full Description is as per Annexure enclosed in the documents).
Accessories for circuit breaker Auxiliary compressor, type-HKSS, 2 NO as per CLW specification No. CLW/ES/3/0037 Alt. H or latest and ABB document No- HBTB585557R1200 or latest.
PROCUREMENT OF V BELTS SPC-4250 FOR IAC NO.6 COMPRESSOR HOUSE AND FOR D-85-D AND D-135-8 PUMPS OF ASH PUMP HOUSE AND ASH HANDLING SYSTEM
Self contained storage type drinking water cooler, fully SS body with Non CFC refrigerant, energy efficient compressor, cooling capacity 40 ltrs. per hour, type storage, storage capacity 80 ltrs. Rate
"Accessories for circuit breaker Auxiliary compressor, type-HKSS, 2 NO as per CLW specification No. CLW/ES/3/0037 Alt. H or latest and ABB document No- HBTB585557R1200 or latest."
Supply, Installation & Commissioning of IGBT Inverter based Air Plasma Cutting machine along with Compressor as per Annexure-A, Make:ESAB or ADOR WELDING LIMITED or ADOR FONTECH or HYPERTHERM or MIGA
Supply of Refrigerated hermetically sealed compressor, Model No.: KCM 522 CAL-E510H, Volts 400, Power 2600, Three Phase, 50Hz, LRA 45. Make Emerson Copeland only. Accepted make/brand: EMERSON COPELAND
Carrying out rectification works of SS gratings for eco, LTR & LTS area gratings, providing new T pieces in place of missed, damaged T pieces and Inspection & adjustment of set values of constant load hangers & Flushing of Bottom ring header of Units ... V&VI Boilers during ...
CLOSING COIL, 110V DC FOR ABOVE HWX, TRIPPING COIL 110V DC FOR ABOVE HWX, SPRING CHARGE MOTOR WITH GEAR BOX, 230V AC FOR ABOVE HWX MOTOR
Procurement of Asbestos Metallic Tape for Coal & oil Firing Equipments for Units-1&2 Boilers
SUPPLY OF PLAIN BEARINGS, INNER ARMS AND OUTER ARMS REQUIRED FOR UNIT-I ANDII BOILERS
SUPPLY OF LAMELLA COUPLING SETS FOR PA,FD AND ID FANS OF UNIT-IANDII BOILERS
Leveling, filling with crusher stone dust and gravel, providing bore well, 0.75 HP Submersible motor, electrical and plumbing items at Satrucharla Real Estate Park for temporary parking of Swatcha Andhra Corporation Sanitation Vehicles, Back side of RTC Complex of Parvathipuram Municipality under General Fund
Markapur Municipality - General Fund - Construction of Culverts at Mettu Surya Narayana Reddy house in Sai Balaji Theater road, At Seven Hills lodge in Y-Palem road, Leveling the road infront of Mahammad house in Ward No.31 and in ELSR site with ... with Crusher Stone
O and M of existing WQ2 and WQ3 Terminal for carrying out cargo handling operations with Harbour Mobile Cranes HMCs one plus one Nos, Material handler, Conveyor system and other associated equipment including Administration and Mar
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.50 Meters per second pertains to CHP for the period of 18.11.2024 to 31.03.2025.
Regular and special maintenance works of conveyor system and 4 Nos of TTs pertaining to SD 2 of EM 1 Division of Stage 4 CHP for the period from 01 04 2023 to 31 03 2024
Replacement of gravemetric feeder belts Replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of RC feeder doors,replacement and overhauling of main reducer gear box of R.C.Feeders and Replacement-repairing of feeder outlet gates and chutes of R.C Feeder Patch welding of 22 coal pipes from all corners of unit-5-Stage-III/RTPP as and when required during the year 2022-23
Replacement of Gravimetric feeder belts,Replacement of head pulley bearings, coupling halves,studs,bronze and rubber bushes of main drive pulley coupling, opening of R.C.feeder doors and closing of R.C.feeder doors,replacement & overhauling of main ... main gear box of ...
Replacement of gravimetric feeder belts Replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of R.C.feeder doors,replacement and overhauling of main reducer gear box of R.C.Feeders and replacement/repairing of feeder outlet gates and chutes of R.C Feeder Patch welding of 22inch coal pipes from all corners of unit-5/Stage-III/RTPP as and when required during the year 2025-26
Replacement of gravimetric feeder belts Replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of R.C.feeder doors replacement & overhauling of main reducer gear box of R.C.Feeders and replacement/repairing of feeder outlet gates and chutes of R.C Feeder Patch welding of 22inch coal pipes from all corners of unit-5/Stage-III/RTPP as and when required during the year 2023-24
Custom Bid for Services - COMPREHENSIVE AMC FOR AIRCOOLED SCREW CHILLER OF CAPACITY 260 TR CONSISTING OF 3 NOS HANBELL SCREW COMPRESSOR OF MODEL NORC2320B COMPLETE WITH CONDENSEREVAPORATORREFRIGERANT CONTROLS AND OTHER ACCESSORESELCTRICAL ... SCREW COMPRESSOR MODEL ... SCREW COMPRESSOR MODEL ... SCREW COMPRESSOR MODEL ...
Labour charges for Surface preparation Application of primer application of Epoxy paint for Structure of Boiler and Critical piping structure of Unit II including required consumables like wire brushes rust cleaner and excluding paint
Dr. NTTPS - R&M - Replacement of damaged GCI sheets with pre-painted galvanized/GI trapezoidal profile roofing sheets to the roof and side cladding of Boiler pent house of unit II in Stage-I
Annual Maintenance works Break down works and repair works for collecting electrodes in ESP passes including T and P and consumables of Unit II Boiler as and when required during the year 2018 19
Replacement of Eroded and defective Water wall & Screen Tubes, Metal build up on eroded portions and fin welding of pressure parts in Unit-4 boiler during annual overhaul period for the year 2018-19.
Replacement of eroded and defective water wall & Screen tubes, Metal build up on eroded portions and fin welding of pressure parts in Unit-4 boiler during annual overhaul period for the year 2017-18.
Annual Maintenance works Break down works and repair works for collecting electrodes in ESP passes including T and P and consumables of Unit I Boiler as and when required during the year 2018 19
Labour charges for Surface preparation, Application of primer, application of Epoxy paint for Structure of Boiler and Critical piping structure of Unit-1 ,including required consumables like wire brushes, rust cleaner and excluding paint
Annual Maintenance works Break down works and repair works for collecting electrodes in ESP passes including T and P and consumables of Unit I Boiler as and when required during the year 2018 19
Labour charges for Surface preparation, Application of primer, application of Epoxy paint for Structure of Boiler and Critical piping structure of Unit-I, including required consumables like wire brushes, rust cleaner and excluding paint
Replacement of eroded and defective water wall & screen tubes, metal build up on eroded portions and fin welding of pressure parts in Unit-4 boiler during annual overhaul period for the year 2021-22
Replacement of Worn out Grinding rolls, Bull ring segments, Vane wheel assembly, Bull ring clamping ring, Bowl extension ring & other connected mill internals and other repair works for Mill-1A of Unit-1 Boiler
Replacement of eroded and defective water wall & screen tubes, metal build up on eroded portions and fin welding of pressure parts in Unit-4 boiler during annual overhaul period for the year 2021-22
Replacement of eroded and defective water wall & screen tubes, metal build up on eroded portions and fin welding of pressure parts in Unit-4 Boiler during annual overhaul period for the year 2023-24
Replacement of eroded and defective water wall & screen tubes, metal build up on eroded portions and fin welding of pressure parts in Unit-3 boiler during annual overhaul period for the year 2021-22.
Break-down works and repair works for ESP of Unit-1 i.e., EERM, CERM &GD rapping gear boxes ,shaft bearings & drives as and when required during the year 2022-23 for Unit-1 Boiler
Annual Maintenance works Break down works and repair works for collecting electrodes in ESP passes including T and P and consumables of Unit II Boiler as and when required during the year 2018 19
Repair and Overhauling Service - CABLE END PREPARATION WITH MATERIAL CONNECTORISATION AND PACKING OF CABLE GLANDS OF ELECTRICAL MACHINERY ONBOARD IN SHIP; ANY OTHER SUITABLE BRAND; No; Buyer Premises
FABRICATION RENEWAL MAINTENANCE UPGRADATION OF INFRASTRUCTURE OF SDD AND NDD PUMP HOUSES AND OTHER MACHINERY SPACES IN DRY DOCK AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
Repairs & Maintenance of 3 Nos. Earth Movers Machinery of PH section working in Zone-VII of GVMC for a period of one year i.e., from 01.04.2021 to 31.03.2022
Repairs & Maintenance of 6 Nos. Earth Movers Machinery of PH section working in Zone-VI of GVMC for a period of one year i.e., from 01.04.2021 to 31.03.2022
Repairs & Maintenance of 5 Nos. Earth Movers Machinery of PH section working in Zone-V of GVMC for a period of one year i.e., from 01.04.2021 to 31.03.2022
Repairs & Maintenance of 5 Nos. Earth Movers Machinery of PH section working in Zone-III of GVMC for a period of one year i.e., from 01.04.2022 to 31.03.2023.
Engaging men and machinery for clearing chocking points in storm water drains at various locations under AE-13 Section, Works Division-II Area for Monsoon Action Plan-2026
Engaging men and machinery for clearing chocking points in storm water drains at various locations under AE-13 Section, Works Division-II Area for Monsoon Action Plan-2026
Repairs & Maintenance of 4 Nos. Earth Movers Machinery of PH section working in Zone-I of GVMC for a period of one year i.e., from 01.04.2021 to 31.03.2022
Repairs & Maintenance of 5 Nos. Earth Movers Machinery of PH section working in Zone-VIII of GVMC for a period of one year i.e., from 01.04.2021 to 31.03.2022