Loading…
Loading…
5,054 results • Best match
Supply of Refrigerated hermetically sealed compressor, Model No.: CR53KQM, TFD-233DM, Phase: 3, Power: 2600, Voltage: 380-460V, LRA,61,60, 50Hz. Accepted Make: Emerson Copeland only Accepted make/bran
Supply of maintenance spares for EG110-1 [Supply of maintenance spares for EG110-13 compressor of ELGI make as per annexure attached. Make: ELGI or its authorised dealers only]
Supply of maintenance spares for EG110-1 [Supply of maintenance spares for EG110-13 compressor of ELGI make as per annexure attached. Make: ELGI or its authorised dealers only]
Supply of maintenance spares for EG110-1 [Supply of maintenance spares for EG110-13 compressor of ELGI make as per annexure attached. Make: ELGI or its authorised dealers only]
CONDUCT OF ISO CAT II VIBRATION ANALYSIS COURSE USING M/S SPM VIBRATION MEASURING INSTRUMENTS
PROCUREMENT OF HYDRAULIC OIL PARTICLE TEST KITS
SUPPLY OF SPIRAL BEVEL PINION SHAFT WITH SPIRAL BEWEL WHEEL FOR 8.5 E10MILL GEARBOX
Supply of Hot end and cold end Sector plate assemblies for Units-5,6 Boilers
Proposal for the procurement of Scaffolding Material Steel Boardsrequired for boilers at NTPC Ramagundam
HYDROBLASTING OF OBM COVER, COMPRESSOR COVER, BA COMPRESSOR COVER AND SPTA BOXES
10, 20, 30, 40, 50, 60, 70, 80, 90, 100, 110, 120, 130, 140, 150
MTM THERMOCOUPLES, BOILER, 20 MTR
PIN WHEEL, BHEL, BOILER, 500MW
Improvements Such as Overhauling of Gear Box & Eletrificaton in Krishna Western Main Regulator & Kondaveetivagu Outfall Sluice for effective water regulation for the year 2026-27
Providing labor assistance for emergency coal clearing of slurry coal, jammed coal & wet coal in crushers, vibrating screens& belt feeder chutes & poking of bunkers in M-1(conveyors), M-1(crushers), M-II & M-IV Sub-Divns./CHP (M.M) -I&II/Dr.NTTPS. as and when required during the year 2022-2023
providing labor assistance for emergency coal clearing of slurry coal, jammed coal & wet coal in crushers, vibrating screens& belt feeder chutes & poking of bunkers in M-1(conveyors), M-1(crushers), M-II & M-IV Sub-Divns CHP (M.M) -I&II Dr.NTTPS. as and when required during the year 2020-2021
Providing labor assistance for emergency coal clearing of slurry coal, jammed coal & wet coal in crushers, vibrating screens& belt feeder chutes & poking of bunkers in M-1(conveyors), M-1(crushers), M-II & M-IV Sub-Divns./CHP (M.M) -I&II/Dr.NTTPS. as and when required during the year 2022-2023
DISMANTLING, RE-INSTALLATION AND RE-COMMISSIONING OF EXISTING MACHINERY FROM OLD DMC TO ALTERNATE SITES FOR AUGMENTATION OF DRY DOCK AND SLIPWAY PH-III AT ND(V)
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 233/000 to Km 241/000 in Basapuram Section of RBLLC.
Providing machinery such as Hydraulic excavator, tractor on hire basis to carry out miscellaneous works during the month of November 2016 and December 2016 in Power Canal.
Supply and Installation Testing and Commissioning of FLUID MECHANICS AND HYDRAULIC MACHINERY Laboratory Equipment FOR DEPARTMENT OF CIVIL ENGINEERING University College of Engineering UCEV JNTUK VIZIANAGARAM AP
Providing Machinery such as Hydraulic Excavator tractor on Hire basis to carry out misceellaneous works during the month of November 2019 to January-2019 in Power Canal.
Providing Machinery such as Hydraulic Excavator tractor on Hire basis to carry out misceellaneous works during the month of November 2019 to January-2019 in Power Canal.
De-silting and flooting material in Katcha drain from US Rao nagar culvert to Budameru channel and Upparabhavi to Railway bridges by machinery in 29th & 30th divisions.
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 205/000 to Km 218/000 in Ingaladahal Section of RBLLC.
Providing Machinery such as Hydraulic excavator, tractor on hire basis to carry out miscellaneous works during the month of February 2019 and March 2019 in Power Canal.
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 233/000 to Km 241/000 in Basapuram Section of RBLLC.
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 205/000 to Km 218/000 in Ingaladahal Section of RBLLC.
Nellore Municipal Corporation - MPLADS Id No.865 - Providing RO Plant Machinery and a Room at Mahila Pranganam, Gandhi Nagar in Division No.20 of Nellore Municipal Corporation
Maintenance and repairs to Machinery, Pumpsets, Gate Valves, Electrical Control Panels with replacement of damaged material at 9 MLD Filtration Plant in 3rd ward in Tanuku Municipality
Maintenance and repairs to Machinery, Pumpsets, Gate Valves, Electrical Control Panels with replacement of damaged material at 9 MLD Filtration Plant in 3rd ward in Tanuku Municipality
Providing Machinery to carryout removal of out crop and for closing of syphon points from Km 233/000 to Km 241/000 in Basapuram Section of RBLLC.
Providing Machinery such as Hydraulic excavator, tractor on hire basis to carry out miscellaneous works during the month of February 2019 and March 2019 in Power Canal.
De-silting and flooting material in Katcha drain from US Rao nagar culvert to Budameru channel and Upparabhavi to Railway bridges by machinery in 29th & 30th divisions.
Formation of Track on Right side bank for the movement of Farmers and Machinery for Agriculture purpose from Km 55.000 to Km 56.000 of Pulivendula Branch Canal
Wetting, poking and clearing of jammed coal in the 48 No.s BOBR Hoppers through 6A/6B Conveyor in CHP-Stage-I&II- Dr.NTTPS for the period from 01.04.2026 or from commencement of work to 30.09.26
Picking of shale, stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.50 Meters per second pertains to CHP for the period of 3 months
APGENCO-RTPP-MM-CHP-PROCUREMENT OF PLUMMER BLOCKS WITH INNER END OPEN WITH SUITABLE LABYRINTH SEALS AND OUTER END CLOSED WITH END COVER AND ITS SPARES AS SHOWN IN ATTACED DIAGRAMS FOR CONVEYOR SYSTEM-REG.
Custom Bid for Services - Tender for providing services for the job of inspection segregation shifting and stacking of bottom defect cylinders through dedicated manpower identified through mirror provided under chain conveyor at Indane Bottling Pla..
AMC for replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, Take up pulley bearings replacement and overhauling of main reducer gearbox, R.C ... of boiler to ... of boiler and ...
Break down works, Repair works and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-2 Boiler including T&P and consumables during overhaul period 2023-24
Annual Maintenance works Break down and repair works for Insulation Cladding sheet and Refractory in Unit II Boiler as and when required during the year 2017 18 including T and P and consumables
Annual Maintenance Works Break down and repair works for ESP Passes of Unit II ie rapping mechanism Boiler including T and P and consumables as and when required during the year 2017 18
Break down works, Repair works and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2022-23
Break down works, Repair works and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2022-23
Cutting and Removal of badly damaged bent collecting electrodes, U guides, Shock bars, Support angles from 1D12 both hoppers in ESP-Dpass of field of Unit-2 boiler include all T& P consumables
Replacement of damaged insulation and cladding of all ducts i.e. flue gas duct, primary and secondary air ducts of Unit-6 boiler at all elevations during annual overhaul for the year 2023-24
Overhauling of Coal, Oil & Auxiliary air nozzle shaft assemblies, ignitor air, scanner air hoses, seal tubes, oil gun assemblies & replacement of worn out Coal burners in Unit-2 Boiler during 2024-25 overhaul
Overhauling of Coal, Oil & Auxiliary air nozzle shaft assemblies, ignitor air, scanner air hoses, seal tubes, oil gun assemblies & replacement of worn out Coal burners in Unit-3 Boiler during 2026-27 overhaul
Break down works, Repair works and Overhauling of PA fans including their lube oil systems and Seal air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2023-24