Loading…
Loading…
2,980 results • Best match
Facility Management Services - LumpSum Based - OVERHAUL OF BOILER PRESSURE PARTS AND BIENNIAL MAINTENANCE WORKS AT NTPC KORBA; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
Custom Bid for Services - RLA STUDY OF BOILER#1 & 3 OF BHEL MAKE MODEL VU-40 HAVING CAPACITY 150 TPH NSPCL BHILAI PP-II Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - 200155263 ONLINE LEAK SEALING OF LEAKAGES FROM VALVE GLAND BONNET FLANGE OR PIPELINE IN BOILER and TURBINE AREA NTPC LARA Similar Category Operation and Maintenance Power House/Power Plant
Scrapper Bar HD Part no BD1000CF501, Scrapper Chain Part no BD1000CF502, Chain Lock Bolt Part no BD1000CF503, Nylock Nut Part no BD1000CF504, Sprocket HD Part no BD1000FB303, Sprocket HD Part no BD1000FB403, Fly Wheel Part no BD1000FB506, Locking Assembly Part no BD1000FB507, Scrapper Bar HD Part no BD1000FB601, Chain Lock Bolt Part no BD1000FB603, Nylock Nut Part no BD1000FB604, Sprocket HD Part no BD1000CF303, Sprocket HD Part no BD1000CF403, Joining Linc Part no BD1000CF505, Scrapper Chain Part no BD1000FB602, Joining Linc Part no BD1000FB605
As per NIT
Drawing of temporary HT overhead line from Existing HT O/ H line near Mahan II OCM boundary to Proposed site of Mobile Coal Crusher along embankment of diverted Nallah of JOCP to provide 3.3 KV power to transformers 3.3 KV / 440 V at Jagannathpu
Hiring of (a) tippers for transportation of coal from Coal Stock Yard of Jampali OC to the hopper of the Mobile Crusher (b) pay loader for mechanical transfer of coal into tippers at Coal Stock yard for a period of 100 days. TPD 4600 tes
800 mm type3 PVC Belt, 1000mm FR PVC Conveyor Belting type 5, 1200 mm FR PVC Conveyor Belting type 6
PROCUREMENT OF PIPE AND BEND FOR DRAIN AND VENT REPLACEMENT OF BOILERSAT SSTPS
Erection of temporary stopping by old reject conveyor belt and construction of reserve station, miners station, first aid station, material yard in proposed 4J-2 depillaring distt in 4A seam at jhiria ug mine of Hasdeo
Preparation of loading points of working distt. G1, G2 in 4A seam and W37 in 5A seam as per direction of district incharge for smooth loading of coal on the belt conveyor at West JKD Colliery.
Cleaning of spilled coal muck accumulated in day to day working at different conveyor belts and loading points of CHP at Manikpur OCP of Korba Area for 365 days (Minimum 06 labours daily for 365 days)
Erection of temporary stopping by old reject conveyor belt as per required basis for approaching intake airway in working faces of depillaring panel no. 4J-5A and 4J-5B in 4A seam at Jhiria UG Mine.
Work of cleaning of spillage coal of hoppers on tippers unloading platform by mechanical means JCB, TRS W1 TO W5 at PQ series of in pit conveyor at Back-Up of Gevra Project for 365 days.
Malma cleaning removal of debris from UG galleries of cleaning of Tailend (TB-1, TB-2 and D-1) of Belt conveyor in seam-A, seam-C and seam-D at Bijuri Colliery of Hasdeo Area
Annual cleaning and removal of deposited silt from existing drains and floor of conveyor belts of P1Q1, P2Q2 and P3Q3 series I/c cross drains of bunkers portion (small belt) at Gevra Project of Gevra Area.
Custom Bid for Services - Transportation of all kind of scrap (including conveyor belt) for various sites of BIOM Complex to CSD-Bacheli including loading and unloading by crane Similar Category Handling and Transport on Lumpsum Basis
Facility Management Services - LumpSum Based - BACKUP CHP SECL GEVRA PROJECT; Assistance in miscellaneous work like clearing of jammed chute tail end broken conveyor chain re handling snapped belt rehandling material handling etc in back shift of ..
Custom Bid for Services - Supply of Trucks Cap 9MT above to carry any ferrous non ferrous misc items collection and transportation of empty drumsbarrels and Collection cutting bundling nailing and transportation of used unserviceable conveyor belts ..
Custom Bid for Services - 200151259 Deployment of EX-WRI Welding expert & Ex-BHEL expert for supervision of Boiler pressure parts overhauling works at NTPC Korba Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - JOB CONTRACT FOR DPT MPI STRESS RELIEVING RADIOGRAPHY TESTING OF BOILER OTHER AREAS DURING UNIT OVERHAULS OF 202526 AT NTPC SIPAT Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - 200151909 BIENNIAL MAINTENANCE RATE CONTRACT FOR BOILER PRESSURE PARTS OF STAGEI AND STAGE-II AT NTPC SIPAT FOR YEAR 2026-28 Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - BIENNIAL CONTRACT FOR REPAIR/REFURBISHMENT OF HIGH PRESSURE VALVES NRVS OF TG and BOILER AREA AT NTPC SIPAT 3X660MW AND 2X500MW Similar Category Operation and Maintenance Power House/Power Plant
Procurement of Dry Air Generators for Transformer Maintenance andPortable Compressors for Track Hopper
42611401000010, 42611401000006, 42611401000007, 42611401000011, 42611401000008, 42611401000009
Repair of Radiator Brake Oil Cooler Transmission /Hydraulic cooler and Compressor Oil cooler of HEMMs totaling to 35 Nos.of repair jobs on as and when requirement basis. at Dipka Expansion Project
K- SMART PREMIUM SCREW COMPRESSOR FLUID IN 20 LTRS PACK, ORDERING PART NO. 270.02.478.50 (OIL TO BE SUPPLIED IN 20 LTRS PER CAN). FIRM OFFER MAKE: SHELL CORONA S3 R 68
Supply of Thermax make boiler spares
Discharge Drum 650 Dia Drum 61A 150 12, Tail Drum TD 150 12, 2nd stage pinion and gear in set with integral shaft 22 AND 26 150 12, Discharge Drum 61 90 10, Jaw clutch Driving and driven part 44 AND 45 90 10, Tandem Drive Driven Drum 650mm Dia 46 90 10, Tail Drum TD 90 10, Input shaft oil seal 09 55 08, 1st stage gear and pinion with integral shaft in set 25 11 AND 18 C 55 08, 1st Intermediate shaft Bearing Conver Spacing washer 16 55 08, 2nd stage gear and pinion with intergral shaft in set 22 AND 26 55 08, Equalizing Gear in Set of Two Nos 52 55 08, Tendem Drive Driven Drum 46 55 08, Complete Tail Drum Assly CATD 55 08, 1st stage gear and pinion with integral shaft in set 25 11 AND 18 C 75 10, Output shaft oil seal 35 75 10, Equalizing Gear in Set of Two Nos52 75 10, Complete Tandem Drive Driven Drum Assly CA46 75 10, Input shaft oil seal 9 75 10, Complete Tail Drum AsslY CATD 75 10, 2nd stage Helical Gear and Pinion in set 35 AND 43 37, Input shaft Bearing Cap 6 37, Output shaft oil seal 34 37, 3rd stage Helical Gear and Pinion in Set 44 AND 45 37, Output shaft Bearing Cover 32 37, Out shaft Bearing Cap 33 37
Sipat_M5507366205, Sipat_M5507366207, Talcher_M5507366231, Barh_M5507366205, Mouda_M5507366205, Kudgi_M5507366205, Lara_M5507366205, Lara_M5507366225, Gadarwara_M5507366205, Gadarwara_M5507366207, Gadarwara_M5507366230, Telangana_M5507366207, telangana_M5507366229
Custom Bid for Services - CAPITAL REPAIR OF SINTER COOLER & DIP BUNKER, CAPITAL REPAIR OF CHUTES OF CONVEYOR BELTS OF PRODUCT ROUTE, CAPITAL REPAIR OF SINTER CRUSHER TO DIRECT CHUTE & BYPASS CHUTE AND CAPITAL REPAIR OF SINTER SCREEN OF MACHINE-1 Similar Category Repair and Overhauling Service
PUMP P7-9A, PART NO. 2658607738 (58607738) FOR DM-H2 DRILL MACHINE, DMH PTO GEAR BOX, PART NO. 57055808 PUMP P7-9A FOR DM-H2 DRILL MACHINE
Custom Bid for Services - Cleaning of spilled coal muck accumulated in day to day working at different conveyor belts and loading points at Manikpur OCP for 365 days Similar Category Facility Management Service- Manpower based (Version 2)
Scheme for providing shed and heightening of belt structures for newly installed diagonal belt line and Drive head starting from G-point Discharge to C-6 conveyor at CHP under Churcha (RO) Sub Area of Baikunthpur Area
Transportation of 1000mm belt conveyor from 82L East belt from (14 Dip to 43 Dip) to 9 East panel to 88 L between (1 Dip to 29 Dip 10 East panel ) at Shiwani UG Mine, Bhatgaon Area.
Erection of temporary stopping by old reject conveyor belt and construction of reserve station, miners station, first aid station, material yard in proposed 4J-3 depillaring distt in 4A seam at Jhiria UG Mine of Hasdeo Area.
Dismantling, transportation and Installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to New depillaring panel no. 27D
(I) Dismantling, transportation and Installation of 1000mm wide belt conveyor along 101L West in 101L West Panel. (II) Dismantling, transportation and Installation of endless haulage system, laying and packing of haulage track line along 102L West ga
Annual assistance jobs for cleaning and removal of deposited silt from existing drains, and floors of conveyor belt of JK series including cross drains of bunker portion (small belt) at Gevra Project of Gevra Area.(2nd call)
Erection of temporary stopping by old reject conveyor belt and construction of reserve station, Miners station, First Aid station, Material yard in proposed KCW-1 depillaring distt. In C seam at Kapildhara UG Mine of Hasdeo Area
Cleaning of spilled coal from feeder breaker nos 2 and 3, and C-3 C-6 C-7 (Belt and tunnel) and C-8 Belt conveyor and loading plat form at Bhatgaon CHP/Siding under Bhatgaon Area.
Dismantling, transportation and Installation of (1000mm size) Tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6D,
(I) Dismantling, transportation and installation of 1000mm wide belt conveyor in 95 Level East proposed depillaring panel and (II) Dismantling, transportation and installation of haulage system, laying and packing of haulage track line in 95 Level Ea
Fabrication of drive head, loop take up, discharge and tail end base plate structure, transportation , installation of 800/1000mm 02 Nos belt conveyor of 500mtr and 200mtrs length in Underground of Jhilimili Mine of Jhilimili Sub Area
(I) Dismantling, transportation and installation of 1000mm wide belt conveyor along 87L West gallery. (II) Dismantling, transportation and installation of haulage system, laying and packing of haulage track line along 89L West gallery of 87L West de
Installation of 02 nos. belt 1000mm wide belt conveyor along 39 LW Gallery from 0 dip to 32 dip (Total 746 mtr.) in 39 LW distt. at Rehar UG Mine of RGK Sub Area of Bishrampur Area.
Cleaning of spilled coal from feeder breaker nos 2 and 3, and C-3 C-6 C-7 (Belt and tunnel) and C-8 Belt conveyor and loading plat form at Bhatgaon CHP/Siding under Bhatgaon Area.
(I) Dismantling ,Transportation and Installation of 1000 mm wide belt conveyor in 97 L.East dep panel and (II) Dismantling ,Transportation and Installation of endless haulage system in 97 L.East depillaring panel of East Block of churcha Mine
Conveyor Belts, as per Size- 1220mm Wide X(11-12)mm Thickness open length belt, tensile strength 630 KN, 4 ply grade M24 IS: 1891 (PART I), Top rubber thickness 5 mm, bottom thickness 1.5 mm. [Accepta
Facility Management Services - LumpSum Based - Industrial; Cleaning of Spillage coal near hoppers by mechanical means at tippers unloading platform of RRLOS Gevra Laxman siding conveyor at Backup of Gevra Project for a period of 01 year; Consumables ..