Loading…
Loading…
2,980 results • Best match
AIRCOMP IR ING R110I SOLENOID V 4761980, AIRCOMP IR ING R110I XE 90M ASS 2362951, AIRCOMP IR ING R110I KIT SERVIC, AIRCOMP IR ING R110I VALVE THE 2387914, AIRCOMP IR ING R110I PAD FILTER 2349700, AIRCOMP IR ING R110I VALVE ORIF 2344920, AIRCOMP IR INGE R110I O RING 9506001, AIRCOMP IR ING R110I O RING 9675935, AIRCOMP IR ING R110I O RING 9502339, AIRCOMP IR ING R110I O RING 9502234, AIRCOMP IR ING R110I HOSE 8557565, AIRCOMP IR ING R110I HOSE 8557566, AIRCOMP IR ING R110I HOSE 8557517, AIRCOMP IR ING R110I HOSE 2426565, AIRCOMP IR ING R110I HOSE 2426564, AIRCOMP IR ING R110I VALVE MPC 2303090, AIRCOMP IR ING R110I VALVE ASSE 2342502, AIRCOMP IR ING R110I VALVE INL 2342118, AIRCOMP IR ING R110I KIT SERVIC 2353157, AIRCOMP IR ING R110I KIT SERV 2353324, AIRCOMP IR ING R110I KIT SERVIC 2346725, AIRCOMP IR ING R110I KIT SERVI 2357034, AIRCOMP IR ING R110I KIT SERVIC 2346724, AIRCOMP IR ING R110I SENSOR TEM 2352224, AIRCOMP IR ING R110I O RING 9675929, AIRCOMP IR ING R110I TRANSDUCER 4754527, AIRCOMP IR ING R110I SENSOR TEM 2352223, AIRCOMP IR ING R110I TRANSDUCER 4756090, AIRCOMP IR ING R110I CABLE PRE 3987557, AIRCOMP IR ING R110I CABLE TRAN 2352937, AIRCOMP IR ING R110I KIT R37 1 2406129 Bid Number ( ) : GEM/2025/B/6172701 Dated : 26-04-2025 Bid Document 1/27
Facility Management Services - LumpSum Based - Deployment of Technical Supervisors during Daily Maintenance Activities and Overhauling of Boiler and Turbine at NTPC Sipat; O&M of Mechanical Work; Consumables to be provided by service provider (inclus..
Repair / Cleaning of Radiator, Brake Oil Cooler, Transmission/ Hydraulic Cooler and Compressor Oil Cooler of HEMMs totalling to 40 Nos. of repair jobs for one year on as and when requirement basis.
Supply of Single Door Refrigerator with power saver compressor, Capacity-190 liters, Eco Friendly refrigerant, BEE 5 Star Rated, Suitable to operate on 230 volts plus minus 10 percent Single Phase AC
Custom Bid for Services - Hydrostatic testing of compressor air receiver tank deployed in Dep05 Dep10and11A AWS at Bacheli Complex Similar Category Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
a) Hiring of tippers for trans. of coal from surface steel bunker/coal stock yard of SRK 3and4 Incline to unloading point of mobile crusher at SRK ww Siding. b) Hiring of tippers for trans. of coal from surface steel bunker of SRK 3and4 Incline to co
Annual assistance jobs for clearing and removal of deposited silt from existing drains and floors of the conveyor belt of JK series including cross drains of bunker portion (small belt) during monsoon at Gevra Project of Gevra Area
Fabrication, erection, installation, and commissioning with trial run of LNT make feeder breaker and SC and operation, maintenance and miscellaneous work of Feeder breaker and belt conveyor for six months at Anand Vatika of Back up , Gevra Project
Custom Bid for Services - Cleaning of spilled coal muck accumulated in day to day working at different conveyor belts and loading points at Manikpur OCP for 365 days Similar Category Operation And Maintenance Of Other Machines And Plants
Work of providing and fitting of mechanical vibrator with its supporting structure, pan, chute etc. and dismantling, removal of old electromagnetic vibrator below 30000 Te. Ground coal bunker on C5/ C6 belt conveyor Back up/ CHP Gevra Project.
Work for dismantling of old, rusted and worn-out structure of Electromagnetic vibrators and erecting installation with new supporting structures below 30000 Te ground coal bunker on C5 / C6 belt conveyor of Back up / CHP of Gevra project.
Cleaning and removal of spillage coal from transfer point and below discharge point of 26No, 27D, 27R and 31R belt and below belt conveyor in panel 35 and 36 CM panel of 4A seam at Haldibari UG Mine.
Annual cleaning and removal of deposit silt from existing drains and floor of conveyor belts of P1-Q1, P2- Q2 and P3-Q3 series including cross drains of bunkers portion (small belt) at Gevra Project of Gevra Area..
Installation of Two (02) Nos. 90 KW drive head at 12E/29S and 12E/47S in Seam-V (Mahesh Incline) for 1000 mm belt conveyor with Loop take up arrangement and extension of belt up to 1200 mtr.
Dismantling and transportation of 1000mm conveyor belt complete from 40 level and 6 dip and installation of the same along 30 level in Seam-III of Vijay West UG Mine in Seam-III of Vijay West UG Mine.
Cleaning and removal of loose coal/debris below belt conveyor of proposed main dip depillaring district KCW-2 for the quantity of 11430.00m3 in seam C for period of twelve month at Kapilhara UG Mine of Hasdeo Area.
Cleaning and removal of spillage/coal/slurry/left out/ scattered/ loose coal on surface below CHP belt conveyor around tailend /stock yard/siding and stacking the same at a distance of 50m at Bijuri colliery of Hasdeo Area
Cleaning and removal of loose coal/debris below belt conveyor of proposed main dip depillaring district KCW-1 for the quantity 7212.80m3 in seam C for the period of eight month at Kapildhara UG Mine of Hasdeo Area
Providing and fixing of Height Guage and making alternate road for HEMM at crossing point of elevated conveyor C/9-10 and C/13-14 of new road CHP Phase-II and existing coal transportation road at KOCP.
Drawing of 6.6KV overhead lines for feeding power to different Substations of AB Series conveyor from different existing sub stations of 33/6.6 KV i.e Mangaon sub station, Main Substation and Dipka Unit Sub Station of Gevra Project
Repairing of different size pulleys/drums for 1600mm, 1400mm and 1200mm wide conveyor belts installed at New CHP, Silo and Mini CHP of Dipka Expansion Project for a period of one year on as and when required basis.
Custom Bid for Services - Maintenance assistance for partial offloading the jobs related to Engine and transmission repair shop as per Annex J and Fabrication assistance for works of conveyor structures related to Structural shop as per Annex M
Custom Bid for Services - JOB CONTRACT FOR CLEANING AND REMOVAL OF MILL REJECT BOTTOM ASH FROM BOILER STAGE II 3X500MW AREA AT NTPC KORBA FOR 2 YEARS Similar Category Operation and Maintenance Power House/Power Plant
PR 100262315 00010 M4706136024 INHIBITOR TABLET, BOILER
ST010490090, ST010490089, ST010490088, ST010490091, ST010490092, ST010490093, ST010490094
Schedule-1 - 10 - M3826201033, Schedule-2 - 20 - M3826201034, Schedule-3 - 30 - M3826201035, Schedule- 4 - 40 - M3826201036, Schedule-5 - 50 - M3826201037, Schedule-6 - 60 - M3826201038, Schedule-7 - 70 - M3826201039
M4801235576, M4801235584, M4801123743, M4801123734, M4801124750, M4801133743, M4801142750, M4801145150, M4801144772, M4801144778, M4801145143, M4801145525, M4801144956, M4801143204, M4801143267, M4801123952, M4801143756, M4801143965, M4801144750, M4801144925, M4801144927, M4801146387
Custom Bid for Services - Fabrication erection and installation of 01 Nos barrier at both side of conveyor gantry of P-2 P-1 and P-3 P-4 of CHP Phase-III (RVR -Circuit), KOCP Similar Category Operation And Maintenance Of Electro-Mechanical Installations
SUPERVISORY SERVICES BY EX BHEL AND EX WRI EXPERTS FOR OVERHAULING OF800 MW BOILERS AT NTPC LARA
AS PER NIT
AS PER NIT
M5511040001, M5511050001, M5511050010, M5511060001, M5511060002, M5511070001, M5511070002, M5511070003, M5511070005
Custom Bid for Services - Repair Replacement and Modification of Transfer Chute Platform Structure Deck Plate Stinger Post Idlers including frame and brackets of Conveyor Belts of Crushing Screening Washing Plant Dalli Mechanised Mine Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
(i) Erection of temporary stopping by old reject conveyor belt in 30LS LHCM Panel (ii) Cleaning and removal of malma along return roadway of 30LS panel (iii) Transportation, laying, charging of armoured cable from old disst. to new disst.
Repair and cutting of drain along the conveyor belt, front of substation No. IV and extension of RCC culvert and drilling of one No. bore hole with submersible pump at TRS point of Dipka expansion Project of Dipka Area
Installation of 1000mm belt conveyor along A to C drift, -1 Dip drift, 21L/-1dip, -4Dip/21L to 16LS, 16LS/-4Dip to -40 Rise and 40Rise/16LS to 0L in seam C at Kurja UG Mine of Hasdeo Area.
Work of replacement of damaged and worn-out chequered plates, supporting beams, channels and angles of top floor, R-4 belt conveyor walkway, C-5 and C-6 discharge chute floor of Silo-1 and 2 of Gevra Project.
(i) Erection of temporary stopping by old reject conveyor belt in -21Rise LHCM Panel (ii) Cleaning and removal of malma along Travelling roadway of -21Rise panel (iii) Transportation, laying, charging of armored cable from old dist. to new dist.
i) Erection of temporary stopping by old reject conveyor belt in 30LN LHCM Panel (ii) Cleaning and removal of malma along return roadway of 30LN panel (iii) Transportation, laying charging of armoured cable from old disst. to new disst.
Repairing / maintenance of Unitised / Transwitch unit 400 KVA , 3.3 KV /440 V , BRENTFORD make , Sl. No. 02/91/066 with providing , fixing all spares in L.T. and H.T. side supplying power to AC-2 Conveyor circuit at CHP, KOCP.
Dismantling of worn-out/ damaged discharge chutes of B-14 and B-15 conveyor belts and fabrication, erection, installation and commissioning of complete discharge chute arrangement along with rubber liner, flap-gate etc at Silo Reclaim Section of DEP.
Spl. Rubber Pads of 240MM width, 10mm thick made of nylon conveyor belt of 3 ply with cover thickness 5mm minimum at top and 1.5mm minimum at bottom confirming to IS-1891 Part-1(Latest) M-24 grade fo
Conveyor and Elevator Textile Belting (Fire Resistant Belting for Surface Application) (V2) conforming to IS 1891 (Part 5) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Custom Bid for Services - PR NO 200128541 BMC FOR INSULATION AND CLADDING WORK IN ST I II AND III BOILER DUCT AND ITS AUXILIARIES 3 X 200MW AND 4 X 500MW 2024 TO 26 AT NTPC KSTPS
Custom Bid for Services - 200141452 In-situ repair and Servicing of valves in 800 MW unit Boiler (Stage-1) of NTPC Lara during Unit OH/Shutdown/NTPC Lara Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - 200136437 OVERHAULING OF FANS AIRPREHEATER DUCTS HP JET CLEANING OF APH BASKETS OF FIVE UNITS 3X660 MW 2X500 MW BOILER AT NTPC SIPAT 202426 Similar Category Operation and Maintenance Power House/Power Plant
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; UP- GRADATION OF TECHNOLOGY FROM RELAY CONTACT LOGIC CONTROL SYSTEM TO PLC SYSTEM FOR LAEIS-1250 TON & LAEIS- 7 (800 TON) HYDRAULIC PRESS OF SRU BHILA..
AS PER NIT
AS PER NIT
Hiring of Pay loaders and Tippers for loading and transportation of crushed coal from feeder crusher Plant No.3 to Siding no.II at 3 to 4 km lead for a Quantity of 38,32,500 Te at 3500 TPD for 1095 days at Manikpur OCP, Korba Area as per NIT.