Loading…
Loading…
5,520 results • Best match
KHARGONE Procurement of BHEL Make HP Valves for Boiler
SUPPLY OF CERAMIC INSULATION FOR BOILER BURNER BLOCKS(SSTPS)
SPARES FOR GRUNDFOS MAKE VERTICAL INLINE BOILER FEED PUMP
Custom Bid for Services - AMC OF THERMAX MAKE BOILER
Procurement of Expansion Bellows for Boiler area for NTPC
Supply of ceramic fibare Blanket Insulation in Boiler and
Supply of Ceramic Fibre Blanket Insulation in Boiler and
CCTVs at Blast proof Buildings Utility Boiler CPP and
Multi-Function Kettle with Egg boiler and steamer (Q3)
Procurement of Combustor Nozzles and Caps for Boiler at
Flowserve make Mechanical Seal of Boiler Feed Pump at
Procurement of Boiler Tube Protection Shields for 500 MW
Boiler Acid Cleaning of Unit 5 During Upcoming Overhauling
Boiler Tube end Caps for North Karanpura and Kargone
Procurement of CPP CFBC Boiler Spiess Valve Spares at
Gland Packing for Critical valves of Boiler and Turbine
Procurement of Boiler Tube Protection Shields for 210 MW
Supply of Mineral Aggregate like broken stone/ Crusher stone (Crushed in Mechanical Crusher) at Road side including all lead and stacking etc. complete work under M-3 Sub Division under P.W.D. Bhopal.
Repairing of 02 nos of Secondary Crusher Roll Assly of BDEPL make Feeder Breaker Sl no 006 by cutting and removing of old damaged Worn Out Wear Resistance Picks from Crusher Roll at CHP Govinda
Repair and Overhauling Service - Reconditioning of Primary Crusher Eccentric Assembly by Rebabbiting and Machining to size as per HCLMCP drawing; Reconditioning of Primary Crusher Eccentric Assembly by Rebabbiting and Machining to size as per HCLMCP ..
Cleaning of coal spilled over from Trunk, Gate and Pony Belt Conveyors at Naheriya Underground Mine of Pench Area
Cleaning of coal spilled over from Trunk, Gate and Pony Belt Conveyors at Naheriya Underground Mine of Pench Area
Procurement of Spares of scrapper/Spill Conveyors Installed Below Apron Feeders 44,46,47 and 48 Installed CHP of Jayant Project
Repairing /Overhauling and alignment of 12 Nos. EOT Hoist installed in different conveyors of CHP at CHP Jayant NCL.
Annual maintenance contract (AMC) of KONE make elevator (Lift) installed in Boiler unit 1 goods elevator (lift), Boiler unit no 2 goods elevator (lift) and passenger elevator (lift) in Boiler Unit 2 of 2x600 MW, SSTPP, MPPGCL, Dongalia
Annual maintenance contract (AMC) of KONE make elevator (Lift) installed in Boiler unit 1 goods elevator (lift), Boiler unit no 2 goods elevator (lift) and passenger elevator (lift) in Boiler Unit 2 of 2x600 MW, SSTPP, MPPGCL, Dongalia
HERMATICALLY SEALED ROTARY COMPRESSOR, CAPACITY 1.5 TON, DETAILS AS PER ANNEXURE-I
Procurement of Instrument Spares of Atlas copco make compressors installed in AHP of 2x660MW SSTPP Dongalia
Procurement of Spares of Atlas copco make compressors installed in AHP of 2x660 MW, SSTPP, Dongalia
Work contract of servicing of Hydrogen compressors (02 No.) in hydrogen plant at SGTPS, MPPGCL, Birsinghpur
Custom Bid for Services - Contract for removal of deposits from Boilers under CP&O group of Plants, Ammonia-I, Ammonia-II and Urea-II for IBR inspection by Director of Boilers (MP) for period of 2026-28 Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
Custom Bid for Services - Cleaning of spillage coal shale below the belt conveyor along both side of conveyor belt at Mathani Underground Mine of Pench Area
Custom Bid for Services - Repairing of Fanuc System Series 16i TA Type No A02B 0236 B532 Make FANUC Installed in CNC Machine OFK No 10368 of A 3 Sec Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
FIRST INT. PINION SHAFT LP180 0 2 80, GEAR WHEEL OF FIRST INT. PINION SHAFT L, SECOND INT. PINION SHAFT RP 250, 0 3, 21, GEAR WHEEL OF SECOND INT. PINION SHAFT, GEAR WHEEL OF OUTPUT SHAFT LP 250, 0 3, 15, OUTPUT SHAFT 135X0537, 5
Repairing of steel bridge near mobile crusher under Dhanpuri OCM sub area of Sohagpur Area.
PROCUREMENT OF NIB Bolt for breaker plates of roll crusher installed at Nigahi old CHP
Providing and fixing GI pipe line from CHP to Semi Mobile crusher at Amlohri Project.
Work contract for overhauling of Secondary Crusher of 2x600 MW, CHP, SSTPP, Dongalia, Distt. Khandwa
Manufacturing & Supply of Adopter Rod for Ballistic Crusher Barrel Assembly on 105 IFG Carriage (Q3)
White washing/Painting and other minor repair works in CHP Crusher House at Jayant Project
Procurement of PLC Spares of Gyratory Crusher Siemens make of Central CHP at Nigahi Project.
PR- 23186 LOWER CONCAVE AS PER DRG. NO. 154/83B ( FOR PRIMARY GYRATORY CRUSHER -PGC1350)
Refurbishment of work of conveyor 1A and 1B head end to conveyor 2A and 2B tail end chute including of primary crushers discharge chute AND removal and replacement of deck plate of conveyor 10 B of CHP I at SGTPS, MPPGCL, Birsinghpur
Housekeeping of Main Boiler area and Associated Building of Unit 3, 4, Switch Yard area, Switch Yard Control room and Building, DG Set Building, CW Pump House Building, Compressor room, COT DOT floor area and Associated building area of SSTPP
Repairing of Compressor condenser Blower motor of Air conditioner of with man and material along with refrigerant and compressor oil
HINGE BELT FOR CONVEYOR 3/A/2088, SIZE: WIDTH: 510 MM AND PITCH: 50.8MM, MATERIAL-45C8, HARDNESS-40- 45HRC., HINGE BELT FOR CONVEYOR 4/A/2054, SIZE: WIDTH: 375MM AND PITCH: 50.8MM, MATERIAL- 45C8, HARDNESS-40-45HRC
Work contract for Residual Life Assessment of Boiler Pressure Parts and Corrosion Mapping of Boiler tubes of Unit-1, 2x600 MW SSTPP, MPPGCL, Dongalia
Procurement of spares for CERM and DERM gear box spare Make New Allen berry Works of ESP of unit no 1 to 4 of PH I an II SGTPS MPPGCL Birsinghpur
Procurement of Limitorque make complete gear box assembly of butterfly valves installed for ACW Pump, TGDMCW Pumps, TGPHE and Condensers in Unit No. 1 and 2 at 2x600MW SSTPP, MPPGCL, Dongalia
Repair of roof of lathe machine section of the workshop of Tawa-I UG Mine of Pathakhera Area.