Loading…
Loading…
13,555 results • Best match
NCTPS I ES Circle EM II Dn S Dn I Time bound works maintenance and breakdown works of LT motors and HT motors of mill plant boiler area of all the three units at NCTPS I site for 180 days
TTPS Mech II BM Unit I Boiler Attending patch-up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during the 2021 2022 overhaul
Removal of Chocking in the Catch pits in the Mill and Boiler areas and Clearing the drains around the Power House Unit 4 and 5 Stage 3 and Drains around the Fuel Oil Tanks for the period from 01.04.2026 to 31.03.2027
MTPS I TM Unit I Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater and its accessories and disposal of waste insulation materials for Unit I during Boiler license renewal work 2020 21
TTPS Mech II BM Unit I Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during the 2020 2021 overhaul
TTPS Mech II AHP Picking and disposal of hard clinkers discharged from Boiler at the strainer provided in the slurry trenches of unit IV V for the period of work on or after 08 04 2020 and upto 30 09 2020
TTPS ES Circle EM III Fault attending in Boiler auxiliary motors and modules valve motor soot blower motor and preventive maintenance of Ash Silo Transformer A and B of Unit IV and V for the period from 08.10.2022 to 31.03.2023
TTPS ES Circle MRT II Blowing cycle operation of water wall Soot blowers and LR soot blowers maintenance of Junction Boxes, field equipments of FSSS and Boiler Auxiliary systems in Unit IV and V in Sub Division III MRT II
MTPS I BM UNIT I Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of wornout buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works
TTPS Mech II BM Unit II Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2023 2024 overhaul
TTPS Mech II BM Unit V Painting of Condensate Storage Tank inner area and overhauling boiler fill pump, hot well make up pumps and related valves including the cost of paint and other all required materials during 2021 2022 overhaul
Maintenance of Control panels of EAST Hitachi Upgraded DCS HIACS 5000M Pro Control Turbodem 9020 HP Bypass PRDS and STC of Unit IV and V and maintenance of various Transmitters and Switches in Units IV and V Boiler and Turbine areas
S.32 NCTPS II ES circle MRT Division Unit II Generator Turbine and Boiler areas and their Auxiliaries Time Bound Contract works for the Routine Maintenance of MRT equipment for a period of 232 Days Including Sundays and All Government Holidays
NCTPS I ES Circle EM II Dn S Dn I Time bound works maintenance and breakdown works of LT motors and HT motors of mill plant boiler area of all the three units at NCTPS I site for 180 days
TTPS Mech II AHP Picking and disposal of hard clinker discharged from Boiler at the strainer provided in the slurry trenches of Unit IV V for the period of work on or after 08 10 2019 and upto 31 03 2020
Sp.22 NCTPS II ES circle C I Division BOPII subdivision Unit II Carrying out Annual Overhauling works of CI equipments in Boiler Turbine and Mill areas of Unit II BOP II tentatively from the date of handing over of
TTPS Mech II BM Unit I Strengthening of weak welding joints of step grills platform grills renewal of damaged corroded structurals from 0 Mtr to 52 Mtr elevation and re routing of ash disposal pipe line of Unit I Boiler
TTPS ES Circle MRT I Annual Overhauling works in Boiler side Valves Dampers Soot Blowers L R Blowers DCS panels Soot Blower Control Panels and ID FD PA fans lub oil panels in UNIT III for the year 2024 25
TTPS MechII BM Unit III Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during the 2021 2022 overhaul
Carrying out routine, preventive and breakdown maintenance of Boiler auxiliaries ID,FD, PA, Mills, Scanner air fan, Mill rejects, Seal Air Fan ,BCW Motors, Maintenance of Electrical work shop ,Fuel oil forwarding PH , Hoists for ID,FD,PA and Lighting
EM I Assembling of the repaired 6.6 kV 4000kW Ms BHEL make Boiler Feed Pump motor bearing Sl No 31136200 17 including overhauling of rotor assembling the rotor with stator measurement of air gap setting the magnetic centre and complete painting
TTPS Mech II BM Unit III Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2025 2026 overhaul
TTPS ES INSTN I Releasing Refixing of Critical instruments of boiler Turbine and Mill area and also cleaning of Secondary Air Aero foils CVA panels cable tray and cleaning and terminal tightness checking of GVDC Transformers GVDC modules UPS I
TTPS ES Circle MRT I Annual Overhauling works in Boiler side Valves, Dampers, Soot Blowers L R Blowers DCS panels Soot Blower Control Panels and ID FD PA fans lub oil panels in UNIT II for the year 2024 25
Periodical cleaning of all drains in Bottom ash hopper plant area boiler area and mill area in Unit I II and III and C row drain at Power House for a period of six months from the date of commencement
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
S.33 NCTPS II ES circle MRT Division Unit I Generator Turbine and Boiler areas and their Auxiliaries Time Bound Contract works for the Routine Maintenance of MRT equipment for a period of 75 Days Including Sundays and All Government Holidays
TTPS Mech II BM Unit II Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2025 2026 overhaul
Overhauling of Lube Oil System of HP Boiler Feed pump # 1 motor bearings (DE and NDE) and cleaning of mechanical seal coolers (DE and NDE) of HP-BFP # 1 and 2, IPBFP # 1 and 2 and LPBFP # 1 and 2
TTPS ES EM III Comprehensive Annual service maintenance for 2 Nos Freight Cum Passenger Lift at boiler area in Unit 4 and 5 Make VOLTAS Capacity 1360kgs Sl No LM 2681 LM 2682 for the period from 01042024 to 31032025
Providing One Number Diesel Driven TATA SUMO/Tavera/Xylo/Bolero on hire basis for the official use of Executive Engineer / Mechanical / Boiler Maintenance Division / Mettur Thermal Power Station-II for the period of one year from the date of commence
TTPS Mech II BM Unit III Boiler Attending patch-up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2019 2020 overhaul
TTPS ES Circle EM I Annual Maintenance of H T Motors of Boiler Feed Pump A B C Main Condensate Pump A B C and Starting Oil Pump in Unit III during the Annual overhauling for the year 2025 26
TTPS Mech II BM Unit II Replacement of eroded pressure parts tubes in water wall screen tubes super heater screen tubes rear water wall tubes left water wall tubes and Hot reheater of Unit II Boiler during overhaul 2025 2026
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2025 26
MTPS I BM UNIT III Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of wornout buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works
TTPS Mech II BM Unit I Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2025 2026 overhaul
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2026 27
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2026 27
NCTPS I ES Circle EM II Dn S Dn I Time bound works maintenance and breakdown works of LT motors and HT motors of mill plant boiler area of all the three units at NCTPS I site for 180 days
Covering the ESP and Boiler materials and ICHS/ECHS, FOHS, CWS materials which are stacked in the open yard by using tarpaulin sheets to avoid rust formation due to saline atmosphere and during forthcoming rainy seasons for the year 2018 -19
MTPS I BM Unit IV Boiler AOH 2019 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I and II pass area
BM Division - Unit II 600MW Boiler - Providing cup lock metallic scaffolding arrangements inside the Boiler furnace from 11 Mtr S-panel area) to 54 Mtr EL (Elephant door - 9th floor level and Cleaning of Boiler I pass heating surface tubes
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 08.10.20 to 31.03.21
Underwater and other machinery routines
Condemned Machineries (Lathe Drilling Power Hacksaw Grinding Sewing Welding Refrigeration AutomobileFoundry Machines /Other items (Hand tools MS CI Scraps)
Sale of Condemned machineries (Lathe Grinding, Drilling, Heavy Machines, Automobile, Pumps and Motors), Tools and Equipment and metal scrap
Goods Transport Service – Per Trip based Service - Machinery & Equipment; MINI LCVTATA ACE BOLERO DOSHTAI TOP OPEN 5 HRS UPTO 1 TON 0 TO 20 KMS; MINI LCVTATA ACE BOLERO DOSHTAI TOP OPEN 5 HRS UPTO 1 TON 0 TO 20 KMS, Goods Transport Service – Per Trip ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ...
The System Design Manufacturing Testing Supply Installation and Commissioning of Plant and Machinery Equipment Electrical and other related Works for Setting Up of Proposed Site Mixed Bulk Explosives Plant at Neyveli Dist Cuddalore TN.