Loading…
Loading…
13,519 results • Best match
ECHP-I- Rectification and replacement of worn out pinion gear Third stage, Final gear wheel with hub, oil seal by new and service overhauling of FMG make Gear box ZTNW 1270.
TTPS Operation Circle MPM II Unit IV Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 4D, 4E and 4F during 2021 annual overhau
TTPS Operation Circle MPM II Unit IV Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 4A, 4B and 4C during 2021 annual overhaul
"RIGHT ANGLED FOOT MOUNTED GEARED MOTOR.MOTOR USED SHALL BE FLANGE MOUNTED SQUIRREL CAGE INDUCTION,1.5 HP, 4POLE,INSULATION CLASS "F" FRAME 90.CONFIRMING TO IS 325. GEAR BOX DETAILS:- MOUNTING-UNIVERS
CT-20 Complete gear box assembly 200:1-LH-1HP-415V-0.75KW-B14 Face mounting -1300-1500Rpm with motor of ISI Standard, Make: Miven Mayfran (or) Equivalent. Offer accepted make: MAYFRAN.
TTPS Operation Circle MPM II Unit IV Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 4A, 4B and 4C during 2018 annual overhaul.
TTPS Operation Circle MPM II Unit IV Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 4D, 4E and 4F during 2018 annual overhaul.
TTPS Operation Circle MPM II Unit IV Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 4D, 4E and 4F during 2019 annual overhaul
TTPS Operation Circle MPM II Unit IV Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 4A, 4B and 4C during 2019 annual overhaul
TTPS Operation Circle MPM II Unit V Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 5D, 5E and 5F during 2019 annual overhaul
TTPS Operation Circle MPM II Unit V Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 5A, 5B and 5C during 2019 annual overhaul
Repair and Overhauling Service - Replacement of Economizer coil bends in boilers-1, 2 & 3 of Stage-I Units of TPS II under LEP; Thermal Power Plant; No; Buyer Premises
MTPS I BM Unit I and II Boiler Pressure Parts AOH COH 2024 Cleaning of boiler structures from 0 to 52 m Level etc
TTPS Mech II BM Unit I Replacement of eroded boiler pressure parts tubes bends in inter pass and II pass of Unit I Boiler
MTPS I BM Unit I and II Boiler Pressure parts Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism etc
Providing platform in half retractable soot blower at 51mtr elevation, renewal of damaged grill from 17mtr to Boiler top left right side of boiler
MTPS I BM Units III and IV Boiler Pressure parts Preventive/Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism etc
TTPS MechII BM Unit I Replacement of boiler pressure parts tubes bends in I pass of Unit I Boiler during the year 2024 2025
Supply of galvalume sheets of thickness not less than 0.8mm with accessories for roofing and four sides of Boiler structure in Unit V Boiler
TTPS Mech II BM Unit II Replacement of boiler pressure parts tubes bends in Unit II Boiler during overhaul for the year 2024 2025
NCTPS-II 2 X 600 MW MI Circle BM Division Unit II Boiler Cleaning of Boiler I pass heating surface tubes from 43 Mtr
TTPS Mech.II BM Unit III Replacement of boiler pressure parts tubes bends in I pass of Unit III Boiler during the year 2025 2026
MTPS I BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism etc
Professional Painting Service - Painting of Boiler Structure, Piping and Exposed Auxiliary Equipments including the Supply of Paint and Consumables at NTPL; NA; Painting of Boiler Structure, Piping and Exposed Auxiliary Equipments
CHIPPER INFEED CHAIN CONVEYOR SERVICE WORK AT TNPL UNIT - II
PAINTING OF CONVEYOR STRUCTURES AT CHP IN TNPL UNIT - II
CHIPPER INFEED CHAIN CONVEYOR SPROCKET WORKS AT TNPL UNIT - II
Procurement of Compressor Spares FRICK INDIA LTD make
NYLON NYLON CONVEYOR BELTS OF 1800MM BELT WIDTH, STRENGTH 1250 KN/M, 5 PLY, 5/3 MM THICKNESS, MOULDED EDGE, FR COVER GRADE
UPGRADATION OF COMPRESSOR HOUSE HMI, UPGRADATION OF SMS PUMP HOUSE HMI
Purchase of machinery for thermal lab
Multi purpose Steam Boiler Fire Wood Model Steam and Water Capacity 420 L, Additional Modification provision to convert to Gas Model Boiler, Rice Cooking Vessels Fully SS 304 Grade Capacity 30 kgs, Double Jacket Dhall Vessel Fully SS304 Grade capacity 100L, Steam Pipe Line Work
MTPSI BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and air washing of Boiler structures, floor and allied works
MTPS I Mill Plant Unit II Coal flow system to boiler Rotating the existing eroded straight coal pipes to Boiler corner 1 to 4 to 180 deg at 16 meter level near Boiler area during capital overhaul 2024 25
Belt Conveyor system 1000 mm belt width Length 1000M with 2X90KW 550V FLP electricals, Belt Conveyor system 1000 mm belt width Length 900M with 2X90KW 550V FLP electricals, Belt Conveyor system 1000 mm belt width Length 750M with 2X90KW 550V FLP ... Belt Conveyor system ... Belt Conveyor system ... Belt Conveyor system ... Belt Conveyor system ... Belt Conveyor system ... Belt Conveyor ) ... Belt Conveyor ) ... Belt Conveyor ) ...
REDUCTION GEAR SYSTEM FOR CHIP CONVEYOR, GEAR MOTOR 1: 100 SIMILAR TO MGM VARVAL FRT60 MODEL, REQUIRE (Q3)
Engagement of Mobile Crane 80 MT Capacity for Shifting of Gearbox,Chips Screw in Hardwood plant at Pulp Mechanical
Pin Bush Coupling for Mill Motor and Gearbox suitable for ZGM 133G II model vertical coal mill 2 Sets
Overhauling and rectification of defects in Air cooled condenser fan 01 and 10 and its Gearbox at KGTPS Maruthur
ITEM 1 BUSH FOR TRACK TENSION WHEEL OF 2000 MM CONVEYOR TRIPPER (Q3), BUSH (ST. BORE) FOR CAM WHEEL OF 2000 MM CONVEYOR TRIPPER (Q3), ITEM 3 SPLIT BUSH FOR CAM WHEEL OF 2000 MM CONVEYOR TRIPPER (Q3), ITEM 4. SPLIT BUSH (ST. BORE) FOR CAM WHEEL OF ... MM CONVEYOR TRIPPER
Custom Bid for Services - REAL TIME RADIOGRAPHY TESTING OF STRAIGHT TUBE BUTT WELD JOINTS IN BOILER AND PRESSURE VESSEL COMPONENTS
Repair and Overhauling Service - BMC Works of ABG, Slag Conveyor, Feeder and Conveyor Works in Boilers of TPS-II; As per Scope; Yes; Buyer Premises
procurement of Spares for Boiler Goods cum Passenger Lift
BOILER PREPARATION FOR ANNUAL INSPECTION AT TNPL UNIT II
Cassette Baffles for Economizer coils of 600MW Boiler
Water wall rifled tube panel for 600MW Boiler
Overhauling of Airpreheater - A in Unit II boiler during the year 2017-2018
Overhauling of Airpreheater - B in Unit II boiler during the year 2017-2018
Rack and pinion with rack gear housing assembly for water wall soot blowers of Model WB 1E for boilers
Supply of SBV/ Poppet valve for Water Wall Soot Blowers of Model WB-1E for boilers of unit-II