Loading…
Loading…
13,521 results • Best match
ICHP- Attending preventive maintenance and monitoring works to avoid breakdown in Conveyor-74.
Supply and Erection of Stringer Channel Assembly for 1400mm Belt width Conveyor 14
MTPS I CHP I Cleaning of spilled coal from Conveyor 1 to 4
Supply and Erection of Stringer Channel Assembly for 1400mm Belt width Conveyor 16
SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 3 PHASE DOUBLE MOUNTING SIREN FOR CONVEYOR
ECHP-I- Attending preventive, breakdown mechanical maintenance works in Conveyor-,14,15 and 16.
ECHP-I- Attending Breakdown, Preventive mechanical maintenance works in Conveyor-13A, 14,15 16.
ICHP- Complete overhauling of Tripper gate A B actuator in Conveyor-59A B
Procurement of Fabricated Supporting Beam for Band Element for Drycon Conveyor 40 Nos
Supply of Alloy Steel Chain for Unit IV and V Scrapper Conveyor Feeders
Fabrication, Supply and Erection of Skirt Board Assembly in the Conveyor BFD 8
Supply and Erection of Discharge Chute Assembly Middle for 1400mm BW Conveyor 14
Transmission assembly suitable for PROMTRACTOR make Russian Conveyor Shifter of model TP-20.02
ALLOY STEEL ROUND LINK CHAIN OF SIZE 22 X 86 FOR SLAG CONVEYOR
ECHP-II- Erection of skirt board assembly for Conveyor-73 tail end area
Belt conveyor replacement work in Back water clarification plant at Pulp Mill Mechanical
Supply of Stacker Boom Conveyor Drive Pulley of size Dia 630 and 2000mm
Supply of Alloy Steel Chains for Unit IV and V Scrapper conveyor Feeders
BEARING FOR HOT WHEEL CONVEYOR ROLLER 70 DHT TO WAP DRG NO.702067410020.
BEARING FOR HOT WHEEL CONVEYOR ROLLER 70 DHT TO WAP DRG NO.702067410020.
SUPPLY OF ALLOY STEEL CHAIN FOR UNIT IV and V SCRAPPER CONVEYOR FEEDER
Repair and maintenance works to conveyor 72 RCC pedestals in between JT 21
CHP II Routine preventive maintenance works in SCR Machine I and Conveyor 13
MTPS I CHP I Conveyor 8A1 preventive maintenance replacement of eroded head pulley
Supply of Alloy Steel Chain for Unit IV and V Scrapper Conveyor Feeders
Fabrication and Supply of discharge chute for SFD-5B Middle and Bottom Portion at Secondary Crusher House I
MTPS I CHP I Primary Crusher A Discharge end spider cone tire surface grinding machining and blue matching
Dismantling and Erection of Lime Stone Crusher in Lime Kiln 1 at SRP Mechanical in TNPL Unit I
ECHP-I- Erection of RBFD-20 21 receiving chute Top and bottom portion at Secondary Crusher House-I
Improvement works to the Eastern side of Secondary Crusher House SCHBuilding I at ICHS area inside NCTPS I
Renovation of RCC structure (BC#5) infront of ECOMAN crusher in Coal Handling Plant at TNPL Unit I
Supply of Suspension Bar of Rotor Assemblies for Secondary Crusher 1A, 1B, 2A and 2B at SCH II
Sale of condemned machinery scraps, M.S Scrap and E-Waste Annexure 1,2, and3
SUPPLY OF HOT AIR DAMPER ACTUATORS WITH ACCESSORIES SUITABLE FOR AUMA MAKE MODEL NO.SAR 6E 45 WITHOUT E-PAC and WITHOUT GEARBOX
Inter Cooler for ELGI Make Compressor Type TRC 1000 MN Compressor. As per M/s. ELGI's Part No. 00-03-2097-A (New). FIRM'S OFFER: INTER COOLER FOR TRC 1000 MN COMPRESSOR AS PER CEC DRG NO. 01-22-77-00
TTPS Mech II BM Unit I III Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2021 2022
MTPS I BM Unit II Boiler pressure parts AOH 2023 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes and fin welding in boiler IInd pass area
TTPS Mech II BM Unit V Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the annual overhaul 2021 2022
TTPS ES EM II Overhauling of LT Motors in Boiler and mill area and valve motors in Boiler area of unit II during annual overhaul period of 2024 2025
TTPS Mech II BM Unit I Boiler Replacement of Platen Water wall bends and eroded portion of the Tubes in header No.2 4 of 210 MW Capacity Boiler
TTPS Mech II BM Unit IV Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the annual overhaul 2021 2022
TTPS Mech II BM Unit V Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the annual overhaul 2019 2020
MTPS I BM Unit II Boiler pressure parts COH 2024 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes and fin welding in boiler IInd pass area
study the reduction of heat rate by supply and application of coal additive (THERMACT) at boiler furnace in any one unit of 210 MW capacity boiler of MTPS-I.
TTPS ES EM II Overhauling of LT Motors in Boiler and mill area and valve motors in Boiler area of unit III during annual overhaul period of 2024 2025
TTPS MII BM Unit IV Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2023 2024
TTPS Mech II BM Unit II Replacement of plugged eroded boiler pressure parts tubes in Economizer coil assemblies in Unit II Boiler during overhaul for the year 2024 2025
MTPS I BM Unit I Boiler pressure parts AOH 2023 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes and fin welding in Boiler IInd pass area
TTPS ES EM II Overhauling of LT Motors in Boiler and mill area and valve motors in Boiler area of unit I during annual overhaul period of 2024 2025
TTPS Mech.II BM Unit IV Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2024 2025