Loading…
Loading…
13,522 results • Best match
Procurement of SU-3" Roller Conveyor Chain for the Annual Requirement of FRM Machines
ECHP-I- Reconditioning of wornout Troughing idler rollers for Conveyor-13A,14,15 and 16
Replacement of Grits Belt Conveyor in Causticizer at SRP Mechanical in TNPL Unit 1
Supply of Bottom Idler Wheel Assembly for Unit-IV and V Scrapper Conveyor Feeder
Replacement of excess feed belt conveyor work in CBP 2 at Pulp Mill Mechanical
Supply of Mounting wheel for scrapper conveyor feeder 4A2 and 4B1 in Unit IV
SUPPLY OF CCTV CAMERA WITH ACCESSORIES FOR FIVE LOCATIONS IN ECHP II CONVEYOR SYSTEM
PCC FLOORING BELOW CHIPS CONVEYOR (BC8, BC9, BC1 AND BC2) AT TNPL UNIT-II
MTPS I CHP I Cleaning of spilled coal from Conveyor 1to4 Belt Feeder floor
Repair and Overhauling Service - Conveyor Pulleys; NLC India Limited Neyveli; Yes; Service Provider Premises
Supply and Installation of Hydraulic Press for Upsetting forging extrusion and Bending
Provision for Machinery annual maintenance charges in Madhuranthagam Municipality
PROCUREMENT OF TOOLS AND MACHINERY EQUIPMENTS FOR TNPL ITI
Custom Bid for Services - BOILER MAINTENANCE WORK IN BUILDING-7 (STEAM TESTING STATION) AT BHEL TRICHY Similar Category Operation And Maintenance Of Other Machines And Plants
TTPS Mech II BM Unit IV V Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2022 23
MTPS I BM Unit-I Boiler pressure parts AOH 2021 Disposal of Ash from Eco hoper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports
MTPS II M II Circle CHP II Descoped Pending mechanical work Balance supply of Lift Car spares material Erection Testing and Commissioning of 3Ton capacity Boiler Elevator at Boiler Eastern side
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Water Washing of boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube etc
Limited Tender for Providing 3 Nos. manpower Grade 2 or Grade 1 IBR Boiler operator for 3 Nos. of Boiler and steam pipelines and valves for one year at Ambattur Dairy
MTPS I BM Unit I Boiler pressure parts AOH 2024 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube etc
MTPS I BM Unit III Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube etc
Supply and Erection of seal plates and Dismantling, cleaning and rectification of defective / dislocated boiler seal trough seal plates and S.S woven wire mesh inside boiler during Annual Overhaul 2019-20.
General and Superficial cleaning housekeeping and up keeping of all the Main Boiler floors and equipments of unit I boiler for six months from the date of handing over of site
MTPS I BM Unit I Boiler pressure parts AOH 2019 Rectification Replacement of defective Boiler tubes in water wall area steam cooled wall tubes and Inter pass area fin welding etc
Please check tender documents carefully and quote your rates accordingly for the tender Purchasing of Conveyor mechanical spares at Coimbatore LPG Plant.
ICHP- Attending preventive maintenance and monitoring works to avoid breakdown in Conveyors-50,50A,54 BFD-5 etc., (Except coal yard area between rail stoppers)
MTPS I CHP II M I Breakdown work preventive maintenance works in conveyors 10A 10B BFD 9A and 9B JT1 and JT2 tail end
Construction of Structures for the erection of Road crossing conveyors from STP shed to Filling shed and allied civil works at Coimbatore Bottling Plant
ECHP-II- Upkeepment and attending breakdown and preventive mechanical maintenance of Conveyors-48AB, RBFD-1A1B, 61,64,72 73 for the period from 01.04.2024 to 30.09.2024.
SUPPLY, ERECTION AND COMMISSIONING OF AIR COOLED OIL COOLER FOR SCOOP CONTROLLED FLUID COUPLING IN THE DRIVE A/B OF CONVEYORS 65 and 67
NCTPS I MII ICHS Reconditioning of Oil coolers for 23SCR and 26SCR Fluid coupling of conveyors and Vibrator shaft for Trash screen A/B
Repair and Overhauling Service - Bucket wheel excavators Mobile Transfer conveyors; 1400 litre capacity bucket wheel excavators and other special mining equipments; No; Buyer Premises
M.II Circle ICHS Dn. Rectification and replacement of the damaged corroded technological structural at Conveyor 7 and 9 tail end area at JT 5 and 6 with second hand materials available at Emergency Conveyor I
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from the date of entrusting the work upto 31.03.2022
TTPS Operation Circle MPM II Unit IV and V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 08 10 2022 to 31 03 2023
DESIGNMANUFACTURING SUPPLY AND ERECTION OF LONG TRAVEL MOTORIZED GEAR BOX WITH DRIVE WHEEL ASSEMBLY BRAKE ASSEMBLY SUITABLE FOR UPGRADE 25 and10 TON CAPACITY EOT CRANE EASTERN and WESTERN SIDE ALL ELECTRICAL MECHANICAL ACCESSORIES ETC IN CWPH II
CRANK SHAFT ND 35172090, FLY WHEEL 6 GR 35214590, Pully Motor 35346860 sparce for Aircomprecer 1 2 3, CYLINDER 310 PT NO 35003060 SP FOR COMPRESSORE, CYLINDER PT NO 35003160 SP FOR COMPRESSORE, PLATE INTERMESIATE DIA 185 CYLINDER PT NO 35003440 ... FOR AIR COMPRESSOR U ... FOR AIR COMPRESSOR , ... FOR COMPRESSOR , ...
Supply of Conveyor Belt 1400 mm Width, N/N, 1250 KN/m strength, 5 ply, General duty, 5/3 mm cover thickness, Moulded edge construction and FR Grade as per IS 340 quantity 1000 mtrs
Strengthening and Providing Protective Coating Works to RCC PSC structures in Conveyor 71 Span 13 19 in offshore area of Coal Jetty 2 Conveyor System in Red Gate NBW at ECHS area at TTPS
Strengthening and Protective Coating Works to the RCC PSC Structures in Conveyor 69 Span 26 28 in offshore area of Coal Jetty 2 Conveyor System in Red Gate NBW at ECHS area at TTPS
ICHP- Dismantling of existing SH 150mm NB pipe from Conveyor-67 at Coal Jetty area and fixing service water line of Conveyor-25A B and 24A B area after removing the damaged pipe line.
Strengthening and Providing Protective Coating Works to RCC PSC structures in Conveyor 70 Span 1 12 in offshore area of Coal Jetty 2 Conveyor System in Red Gate NBW at ECHS area at TTPS
ICHP- Racking in and out of H.T Breakers and LT modules recording of various parameters of running conveyor equipments- tracing of conveyor tripping, LT modules, LT Breakers, Transformers and vacuum contactors at CHS-V.
Strengthening and Protective coating works to the RCC PSC Structures in Conveyor 71 Span 1 12 in offshore area of Coal Jetty 2 Conveyor System in Red Gate NBW at ECHS area at TTPS
Dismantling of damaged conveyor system supply fabrication erection testing and commissioning of belt conveyor system 10A and 10B between JT1 and JT2 and supply erection and commissioning of automatic fire detection and quenching system
CHANNEL ISMC:200 WITH HEX HOLES FOR GRAVITY CONVEYOR AS PER RWF DRG. NO.702054310040. AND UN EQUAL ANGLE FOR GRAVITY CONVEYOR AS PER DRG NO 702054310030. NOTE:- 1)HEX.HOLE ORIENTATION SHOULD BE FOLLOW
Overhauling of Coal / oil burner and its tilting mechanism of corner 3 and 4 of Unit II Boiler during the year 2017-18
Overhauling of Coal/oil burner and its tilting mechanism of corner 1 and 2 in Unit II Boiler during the year 2017-18
MTPS-II-M-II-Circle-CHP-I Division - Providing working platform at Conveyor 4A/B takeup to facilitate the takeup pulley maintenance and to ensure the safety during belt replacement works.
AHP Dn PDFACS Providing 3 Nos 1400 CFM capacity screw compressors for Operation of PDFAC system to transport the fly ash from one Intermediate Surge hopper of one unit to 1000 MT Silo on Rental basis for 90 days