Loading…
Loading…
2,161 results • Best match
Construction of NH 37 to Chungichuk Road under SOPD(G) for the year 2019-20 in PWD Chabua, Duliajan and Naharkatia Territorial Road Division (Chabua LAC)
MMPNA/2023-24/47_Periodic Renewal of road from NH-37 to Nepalikhuti under MUKHYA MANTRI PATH NABIKARAN AACHANI for the year 2023-24 under Bokakhat LAC
Construction of road from NH-15 (Rajbhog dhaba) via Fakhribari to Kharkhabari village under State Govt. Goodwill Project under SOPD(G) for the year 2020-21.
Construction of road from Khagarpur Kharboja PWD Road to Khagarpur PMGSY Road Anganbadi Centre , NH-31 North Salmara Petrol Pump to North Salmara Pt-II Road
Re-Construction of Road from No.I Mohanpur to N.H. 52 via Magurmari road from Ch.0.00 m to Ch.2000.00 m under Srimanta Sankardev Sangha Adhiveshan Scheme under SOPD-G for the year 2022- 23 under Jonai LAC
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6851120 Dated : 03-11-2025 Bid Document 1/10 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Fire Resisting (Insulating) Filing Cabinets (FRFC) as per IS 14561 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6660023 Dated : 09-09-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6552028 Dated : 08-08-2025 Bid Document 1/10 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6851170 Dated : 03-11-2025 Bid Document 1/10 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Improvement of road from NH 15 to Alikash via Khakjani in Mangaldoi and Dalgaon Territorial Road Division under SOPD G for the year 2020-21 Dalgaon LAC
Improvement of Lal Chand Garo Path Kainadhara, Linked to Patarkuchi to NH-37 under Mukhya Mantrir Nagoriya Paki Path Nirman Aachoni (MMNPPNA) for the year 2023-24.
Widening/Improvement to 2-Lane Lane with Paved Shoulder on Dibrugarh to Ledo section of NH-38 in Tinsukia District in the State of Assam Package-5)
Protection and Prevention of NH 15 to Algachar connecting Road from flood Damages under SDMF for the year 2025-26 in Darrang District of Assam,Mangaldai LAC
Recovery and Re-construction of RCC Br. No.1/1 Jungle Block to NH-52 (AS-26-173) under NDRF(PDNA-2022) for the year 2025-26.
Repair and Restoration of Km 175.900 to 180.000 of NH 06 including Toll Plaza and km 197.910 to km 200.460 (at selected locations) in FY 23-24
Additional Repair And Restoration of Silchar-Vairengte Section of NH 306 Km 40.300 to Km 42.00 at Stretches (at selected locations) in FY 2023-2024 - 2nd Call
CONSTRUCTION OF NEW A SITE RO - ON NH-713, FROM KM STONE NUMBER 25 TO KM STONE NUMBER 31, DISTRICT - KENI PANYOR (OLD LOWER SUBANSIRI), ARUNACHAL PRADESH.
Improvement of Road from Chakrapani Khtkhati Village road to Boko NH-17 connecting point, Boko Chariali (Borpara to Chakrapani) under SOPD-G for the year 2024-25.
Re construction of road from Kheteswar No 3 to NH 52 under MukhyaMantrir Path NabikaranAchani (MMPNA) under SOPD-G for the year 2025-26 under Darrang District
Improvement and Upgradation of road from NH 715 at Kuwaritol Tiniali (Ch. 0Km) to Jakhalabondha Road (Ch. 14.93km) under Asom Mala 2.0 for the year 2023-24
1.Bamuni Ahomgaon Playground to Lachit Bordoloi Fishary at Ahomgaon. 2.Borlalung gaon daily market to LP School. 3.NH-36 Gurguri Bridge to Ambu Deka House
Ordinary Repair of NH-37 between from Km 491.050 and Km 535.250 i.e. between Jhanji and Demow at the Risk and Cost of EPC Contractor 2nd call
Reconstruction of selected stretches between Km 514.360 and Km 534.800 of Jhanji to Demow section of NH-37(Old) in State of Assam in FY 25- 26
Short Term Maintenance Contract works from Km 173.325 to Km 201.440 of NH 06 Section Malidor-Badarpur in the State of Assam FY-2025-26-2nd Call
Recovery and Reconstruction of Road from NH 40 (At 13th Mile Tamulikuchi ) to Aadenggiri Garo Basti , Lakhi Suba under NDRF(PDNA-2022) for the year 2025-26
Periodic Renewal of road from NH 39 - Kathkatia Kathkatia Gaon Link Road constructed under PMGSY Package No-AS1238 and Bhitor Amrijan - Kathalguri constructed under PMGSY Package No-AS1238
Repair and Rehabilitation work of Minor Bridge at Km 15.120 of NH-31B of Tulungia-Jogighopa Section in the State of Assam in FY 21-22 (4th Call)
Repair and Rehabilitation work of Minor Bridge at Km 15.120 of NH-31B of Tulungia-Jogighopa Section in the State of Assam in FY 21-22 (3rd Call)
Const. of road side R.C.C. cover Drain from NH-31C to Serfanguri Model Hospital road via North Debargaon village from (Ch.0.00m to Ch.294.00m) including CD work
Ordinary Repair of NH-37 between from Km 453.000 and Km 491.050 i.e. between Jorhat and Jhanji under M and R Head in FY 21-22-3rd Call
CONSTRUCTION OF NEW A SITE RO - ON NH-13, WITHIN 2 KM FROM ORIGIN OF DIBANG RIVER BRIDGE IN BOMJIR TOWARDS DAMBUK, DISTRICT - LOWER DIBANG VALLEY, ARUNACHAL PRADESH.
Improvement of Road from Boko Railway station to NH-17 connecting road (road from Boko to Darisatra) under SOPD-G for the year 2024-25..(Boko Chaygaon LAC)
Construction of Road from Starting from NH-6 to Shampur (from Ch.0.00 m to 1000.00 m) under SOPD(G) for 2020-21, ( L, 1.00 Km) Katlicherra LAC
HIRING OF AGENCY FOR CONDUCTING DETAILED ROUTE SURVEY AND PIPELINE ROUTE SELECTION ALONG THE AVAILABLE ROW OF NH-717A FOR PART D1, D2 AND E, SECTION - 11, NEGG
Improvement of Road from Niz Gadhaijar to NH-15 via MandalPara in Mangaldoi and Dalgaon Territorial Road Division under SOPD G for the year 2020-21 (Dalgaon LAC)
Periodic Renewal of KK Baruah Ali NH-61 from Ch.0.00m to Ch.2000.00m (L_2.00km) (Constructed under PMGSY Package No AS2167) For the year 2025-26, Sivasagar District
Reconstruction of flood damaged of NH-31 to Khutabagra (Ch. 0.00m to Ch. 2000.00m) (PMGSY Package No. AS-05-29) under SOPD (FDR) for the year 2019-20.
Construction of ICBP Road starts from NH-31 AT Kaljhar to Mahapurush Gopal Ata Satra (Shifted at Kaljhar) to Kaljhar Majgaon Road under SOPD For the 2020-21
Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder (Package-I) of Srirampur - Dhubri Section of NH-127Bon EPC Mode in the State of Assam
Reconstruction of Road from NH-31 at Makrijhora to Sataguri via Piazbari Road (Ch. 0.00 Km to Ch. 5.00 Km under NDRF (PDNA-2022) for the year 2025-26
Repair, Maintenance and Improvement of riding quality of the selected sections of Jorhat Jhanji on NH 37 Old in the State of Assam in FY 25 26 2nd Call
MMPNA/2022-23/28 Periodic Renewal of NH-52 to Dhamajibari Road, Khorasimalu to Sadharu,under Mukhya Mantrir Path Nabikaran Aachani under Behali LAC for the year 2022-23
Periodic renewal of L045-NH 36 at Sikari Gate to Ram Terang Gaon Road (Constructed under PMGSY Package No AS12227) for the year 2024-25 in Karbi Anglong District
Repair and Maintenance of existing two lane of Dergaon town of NH 37 from Ch.426.800 km to Ch. 437.400 km in the state of Assam Length 10.60 Km
Periodic Renewal of road from Bamgaon Erabari Road constructed under PMGSY Package No-AS-22-92 Jorabari Balipukhuri to NH-15 constructed under PMGSY Package No-AS-22-79
Construction of NH-37 to Rangagarah No. 2 Ch. 0.00 m to Ch. 2300.00 munder SOPD for the year 2018-19 under PWD, Dibrugarh Rural Road Division-Moran LAC.
Restoration and Repairs of NH 29 from Daboka to Manja Km. 119.000 to Km. 126.000 Total length 7.00 Kms in the State of Assam in the year 2020-21
Construction of Road from 24th. Km of NH-6 to Bawarghat Pt-I under Hailakandi District Territorial Road Division under SOPD-G for the year 2020-21. Hailakandi LAC.
AS01455 1. Bamunkutni to NH-152 via Bhatanta Mohitara road, 2. Nalena Belana road (SH-01 at 4th km), 3. Cheki to Kardeguri road via Barbari and Odalguri village
Improvement of Road from 35th. Km of NH-6 to Chandrapur Pt-I under Hailakandi District Territorial Road Division under SOPD-G for the year 2020-21. Hailakandi LAC.