Loading…
Loading…
2,956 results • Best match
Remodelling of storm water drain and culverts as per the New Master Drainage Plan-2025, connecting Narwana Road drain to the major drain along NH-24 at Narwana Link Road No. 1, Link Road-2 (Big Nallah) and Link Road-3, under Sub-Division East Road-
Up-gradation to 2-lane with paved shoulder work of NH-122 B from Hajipur to Bachhwara via Mahanar and Mohiuddin Nagar from CH- 29 730 to CH- 72 348 in the State of Bihar in the State of Bihar through an Engineering, Procurement and Construction (EPC)
M/o Hort. work at NH-10 Zakhira to Tikri Border, Nangloi- Najafgarh Road, Prem Sukh Road Baba Ramdev Marg and Club Road etc. under HSD-West, Civil Div. West Road -2, PWD, New Delhi during 23-24 and 24-25.SH Complete maintenance of Horticulture work.
4/6 laning of Delhi/Haryana border to Rohtak Section of NH-10 from Km. 29.700 to Km 93.140 including Bahadurgarh and Rohtak bypasses in the State of Haryana under NHDP Phase III (A) on BOT basis Repair Maintenance works from km 65.000 to km 93.140 (P
Construction of i White Topping on the existing bituminous carriageway and SR ii VUP with SR at Delhi Darbar iii VUP with SR at Panduranwadi iv LVUP with SR at Sativali and v Safety measures on Surat Dahisar Section of NH 48 on EPC mode 2nd call
Development of Apna Ghar at 2 No. A Site ROs Shaheed Gulab Singh FS, Kohand, Karnal, Shaheed Bhim Singh FS, Mundlana, Sonipat under Panipat DO and 1 No. A Site RO, Tikri Petro and Gas Co.,NH-10,Tikrikalan under Delhi Divisional Office of Delhi and Ha
Appointment of Safety Consultant for Delhi-Vadodara Greenfield Alignment section of NE-4 (148N) from km 696.890 to km 781.282 (DVE Pkg-26, 27, 28)(Total Length- 80.982 km)
Beautification and Renovation under NH-8 Flyover in Mahipalpur Ward No. 133 NGZ.
SITC of Openwell Submersible Pump for irrigation of NH-24 area adjoining Baansera.
A/R and M/O to Various Roads under Sub-Division East Road-IV of PWD Division East Roads/(M-212), Delhi during 2024-25. (SH- Providing and fixing missing G.I Pipe Railing over crash barriers of flyovers at NH-24, Mayur Vihar Ph-I, Mayur Vihar Extensio
A/R and M/O of various roads under division West Road-2, New Delhi during 2022-23. (SH- Paving of kaccha portion in between service road and footpath from DTC Depot Nangloi to Udyog Nagar Metro Station at Rohtak road (NH-10) under Sub Division WR-23
A/R and M/O various roads under PWD Division South Road-I/ Sub Division SR-15 during 2022-23 (SH- Providing and Fixing Grass paver block on the unpaved area from Mandi Cut to Arjangarh on Left Hand Side on Acharya Shree Tulsi Marg (M.G.Road), NH-236)
A/R and M/O to various roads Sub Division East Road-III under PWD Division East Road/(M-212) during 2024-25.(SH-De-Silting and dredging of Large size drain ( Nallah) and culverts Along with NH-24 from Manglam Red Light to Drain No.1 (Ghazipur Drain
Bio-mining and Bio-remediation of Legacy Waste at SLF Okhla. SH Disposal of inert/C and D at new site of NTPC ECO park (provided by NHAI) near Khadda Colony Jaitpur and RDF at Waste to Energy Plant, Okhla.
A/R and M/O of various roads under division West Road-2, New Delhi during 2024-25. (SH- Repair of entrance and culvert in front of GH-9 DDA Market and raising of footpath and paving of Kachha portion on Rohtak road (NH-10) from Lokesh cinema to S
M/o Completed Scheme (UER-I,II,III) .SH-Cleaning and Sweeping of Road Surface 80M R/W Road (UER-III) from WYC to Mohd. Pur Majri road and NH-44 to 40 M R/W Road and R.O.B. to WYC (UER-I) at 80m R/W UER-I Narela.
Providing and Fixing G.I. chain link fabric Fencing along NH-24 at Amrut Bio-Diversity Park.
Unipole Cluster No.7, On Expressway NH-24/9, FTC Nizmuddin to Ghaziabad, Shahdara South Zone
Providing and fixing in position various sculptures in Kalindi Aviral Extension area adjacent to NH-24.
Construction of Portacabin Site Office between I.T.O. Bridge to NH-24 Eastern Bank (near CWG Village).
Improvement of Service lane along MP Road NO 210 from CT-4 to NH-8 Connectivity
Desilting of drain from NH-8 to Fateh House Mahipalpur Village in Ward No. 133 NGZ.
Repair of Deep Drain starting from NH-44 to SRHC Hosptial traffic light at UER-1.
Providing and Fixing MS grill on Central verge of MP Road no. 224 (from Metro Bridge to MP road No.209 ) and improvement of MP road No. 224 along sec-10 NHAI Building and along CT-4 Sec-20 falls south of metro corridor, Dwarka.
Renovation and repairing of existing Street lights including providing feeder panel
Desilting of deep drain along UER-I (from 40 m ROW) upto open drain near NH-44.
Repair of deep drain along UER-I STARTING FROM Raja Harish Chandra hospital upto NH-44, Narela.
Modification /Upgradation of 30 seater JSC at JJ Cluster Gazipur adjoining NH 24,Kondli (AC-56) 56CJ1242
Desilting of drain from NH-8 to Mother Dairy Rangpuri Village in Ward no. 133 Mahipalpur NGZ.
Chair1, Chair2, Chair3, Chair4, Rack
Request for Proposal (RFP)For Course Content Designer and Developer (Digital/Cyber Forensics) NCTC.
Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12
Restoration and Renovation of Yamuna Signage Boards between Wazirabad Barrage to NH-24 (Eastern bank and western bank).
Repair and maintenance of P-5, P-6 RCC Well at NH-24 (In front of Akshardham Temple)
Remodeling of road by providing RMC from NH-09 to SLF Office at Ghazipur SLF in Shahdara South Zone
Unipole Cluster NH-24, Near Rainwell (DJB) to BQS, CWG Khel Gaon FTC Gaziabad to Nizamuddin, Shahdara South Zone
Providing and fixing road safety signage on 80m. R/W road UER-I from NH-1 to western yamuna canal.
Improvement Development of road drain from Parkash Chowk to NH-8, etc. in Mahipalpur Village in Ward No. 133/NGZ.
Repair of service road and cycle track NH-1 to flyover on 80 m R/W road (UER-1) Narela.
Desilting of drains from Parkash House to NH-8, MC Pry.School to T-Point Rangpuri in Ward No. 133 Mahipalpur NGZ.
De-silting of drain from NH-8 to Fateh House in Rangpuri Village in Mahipalpur Ward No. 133/M-III/NGZ.
De-silting of drain from NH-8 to Mother Dairy in Village Rangpuri in Mahipalpur Ward No. 133/M-III/NGZ.
Cluster No. 1 (C), Delhi to Gurgaon NH-8, from road leading to Westend Green Farms Society to Gurgaon Border, NGZ
Construction of Public toilet near NH-8 Entry point of Rajokari Village Vasant Kunj in Ward No.156 Vasant Kunj/ SZ
De-silting of covered as well as open deep drains along with Culverts along NH-24 and in Pkt.-A, IFC Gazipur.
Individual Unipole Near Milk shop No.15741, Opp. Max Hospital, FTC- Hasanpur Bus Deport Red Light to NH-24, Shahdara South Zone
Providing and fixing stainless steel signage Board in Yamuna Flood Plain area (Eastern and Western Bank) from NH-24 to Jaitpur Extn.
Repair of existing street light network of 80mtr RoW UER-I from NH-I to western Yamuna canal (except Narela- bawana Flyover).
Desilting of drains from Kuldeep House to NH-8, C-9 main gate to Sewer Treatment Plant in Ward No. 133 Mahipalpur NGZ.
Construction of 2 Nos. Portacabin Site Office for watch and ward and Development of Yamuna River at NH-24 and Geeta Colony Reach.