Loading…
Loading…
1,574 results • Best match
SH Formation cutting 5.7 mtrs. Wide in Km. 0.410 to 0.510
C/O U-Shape drain, R/walls and B/walls at various locations from km.0/000 to 43/100
Hiring of labour and hiring of pickup or equivalent for local shifting of labour at various RDs from km.0/0 to 43/00
Fixing, Painting and writing of Danger Sign/Warning Boards adjoining Beas River and NH, downstream of Dam site of Larji HEP up to the Pandoh Dam
Work of MC Baddi from Ward No 1-5 , Sabji Mandi, Sai Road, Bus Stand Baddi NH Road etc as per the direction of MC Baddi
Providing GI drinking water pipe line from switchyard to DPH Police barracks at BBMB Slapper
Miscellaneous Civil Works at Palampur Science Centre, Palampur (HP)
Cutting of bushes or wild growth at WTP,STP,Storage tank ,Store and transport,DPH,cable galleries surrounding of switchyard and BBMB Colony Slapper Loading and unloading the material in department vehicle and disposing at approved site during 2024-25
SH- Construction of Retaining wall and Breast Wall in PCC at various reaches between Km 2-00 to 75-00
SH Construction of V shape drain alongwith cocrete in berm at Km.49/900 to 49/965 (R.H.S) and 49/980 to 50/045 R.H.S
SH Construction of B.wall and Wire crate at RD 40.750 to 40.780
Repair of rasta
SH Construction of B.wall and Wire crate at RD 40.285 to 40.310
SH Construction of B.wall and Wire crate at RD 35.210 to 35.210
Formation Cutting 5/7 mtr wide road in Km 0/000 to 0/345 and P/L Kharanja Stone Soling in Km 0/000 to 0/345
(SH- Providing and laying metalling and tarring, ROFD, retaining and breast wall with wire crates, vented causeway, U a V shape drain, sign board and kilometre stone in km. 0/0 to 5/055). (including five year routine maintenance) (Under NABARD RIDF-X
(SH-C/O Earth Work, Protection work, Cross Drainage Work, Irrigation Pipe, Side Drain, Metalling and Tarring, Crash Barrier, Road Furniture, Dumping Work in km 0/00 to 2/400.)
SH Construction of B.wall and Wire crate at RD 40.420 to 40.450
SH Construction of B.wall and Wire crate at RD 39.990 to 40.010
SH Construction of B.wall and Wire crate at RD 39.510 to 39.530
ROFD 5/7 mtr wide R/walls,dumping sites,CD works and unlined surface drain etc)
C/O Retaining wall.
Providing accommodation for Hamirpur Zone Kangra NH Shahpur Zone Mandi Zome Driver dormitory and JE Richmond enquiry room in existing building of camp office at U.S.Club Shimla
R/R damages (PDNA) on link road from NH-22 to Nesang Km. 0/00 to 10/700 (SH- C/O R/wall in PCC at RD. 3/190 to 3/205, 3/220 to 3/235, 3/580 to 3/587, 4/915 to 4/932, 5/165 to 5/180, 5/220 to 5/260, 8/640 to 8/660, 8/885 to 8/895 and 9/280 to 9
Construction of Foot Over Bridge Near Govt. Senior Secondary School Barmana (SH Protection work of FOB Barmana i.e. Co RWall to Projected NH and existing structures of villagers)
SPL REPAIR TO BLDG NO T-295 T-296 AND BLDG NO T-280J AND T-281J BOUNDARY WALL ALONG NH-05 AT KARCHAM UNDER GE 863 EWS
C/O B/wall at various RDs from km.131/00 to 145/100 and 0/0 to 13/0 on Shimla Bye Pass
Construction of 6.00 mtr span RCC Culvert at RD 0/355 and C/O R/Wall at RD 0/250 to 0/260, 0/270 to 0/277 and 0/570 to 0/600.
C/O B/wall at RDs 10/950 to 10/999 on Shimla Bye Pass).
C/O R/wall at various RDs from km.131/00 to 145/100 and 0/0 to 13/0 on Shimla Bye Pass).
Providing and laying DGBM and 40mm thick BC in Km 98/300 to 102/900 and road side furniture and c/o drain in various RD in Km 98/300 to 102/900
Construction of PCC Retaining wall at Rd.0/449 to 0/460
SH Providing additional boiler and central heating piping therein
SH Patch work at km. 22/930 to 960
Patch work at km. 18/885 to 18/929
SH Patch work at km. 17/940 to 17/988
Construction of Foot over Bridge at Shoghi Bazar
F/c 5/7 mtr. Wide, protection works, CD works, side drain etc. in Km. 0/0 to 4/500 under NABARD RIDF-XXVIII, Distt. Mandi H.P.
Providing and laying interlocking paver blocks.
SH C/O 2.50 m. R/Wall at km. 9/406 to 413 L- 7.00 mtr. 3.40 mtr. Long steel grating and 13.40 mtr. long drain as shown in site plan Drain parallel to existing Rwall Raising height up to 0.45 mtr. of existing Rwall at km. 9/405 to 490 L-85.00 mtr
SH Patch work at km. 20/925 to 20/940,21/00 to 21/030
pls approve ok
Maintenance on Shimla bye pass road K.M .13.000 to 24.250 Sh C.OUShape drain between R.D. 21.500 to 22.500
Construction of Holiday Home cum Senior Management Centre at Katrain Dist Kullu Himachal Pradesh
C/o Rain Shelter on Shimla Bypass at Km.6/380 i.e. Khalini-Chotta Shimla Junction) (against MC Deposit)
Cutting of Grass and bushes,provand PPLYING White washing,Clearance chocked drain bnd removal of slips,Maintanance of earthen ahoulder,Hiring of Excavator and Tipper or equivalent for local shifting of labour and for emergency work etc.from km 30/000
P/L cement concrete pavement in Km 0/00 to 0/250) (Deposit Work)
Cutting of Grass and bushes,provand PPLYING White washing,Clearance chocked drain bnd removal of slips,Maintanance of earthen ahoulder,Hiring of Excavator and Tipper or equivalent for local shifting of labour and for emergency work etc.from km 15/000
SH - Balance work for construction of 3.00 mtrs. Span RCC Slab Culvet at RD 13/250
Cutting of Grass and bushes,provand PPLYING White washing,Clearance chocked drain bnd removal of slips,Maintanance of earthen ahoulder,Hiring of Excavator and Tipper or equivalent for local shifting of labour and for emergency work etc.from km 0/000