Loading…
Loading…
1,567 results • Best match
Repair of existing Rain Shelter at Tutukandi at 1/820) (Against NHAI Deposit
A/R & M/O to GPRA under Phagli Section, Shimla during 2024-25. SH:- Repair and development of access path near NHAI Phagli, Under Phagli Section, Shimla (H.P.).
AMP on NH 21 to Bran Dobha road
Job 6 Construction of link road from Shahtoot Bagh Khad Harizan Basti to National Highway Pandoga Tehsil Haroli Distt. Una H.P Km. 0-0 to 2-600. Sub Head P.L WMM, BC, Thermoplastic and cateyes in RD 0-0 to 0-200 and 0-370 to 0-645 ,Cement Concret
Job 1 Construction of link road from Shahtoot Bagh Khad Harizan Basti to National Highway Pandoga Tehsil Haroli Distt. Una HP Km. 0-0 to 2/600 Sub Head P.L CC Pavement at RD. 0-200 to 0-370, C.O Edge wall at RD. 0-620 to 0-670 Under OTMNP
Repair of Rain Shelter Near Sankat Mochan at RD 142/110 (Against NHAI Deposit
Hiring of excavator cum loader, Hiring of tipper for removal of slips/debris etc, for rainy season for the year 2022-23) ( Against NHAI Deposit)
Repair of existing Rain Shelter at Tara Devi Bazaar at RD 141/00 (Against NHAI Deposit
Short term maintenance and road property maintenance from Km 200/00 to 208/700 on NH-05 in the State of Himachal Pradesh.
SH C/o B/wall and V-shape drain at km 204/680 to 204/710 and 205/260 to 205/310 for the year 2019-20 in the State of H.P.
SH C/o Retaining wall at RD 174/628 to 174/646 Balance Work
P/L CC work at RD. 0/00 to 0/065.50.
Model Landscaping of NH 05 RD 67.00 to 72.00 Sub Head One year maintenance of Park at NH 05 Kms. 69.200 to 69.500
Job 3 Construction of link road from Shahtoot Bagh Khad Harizan Basti to National Highway Pandoga Tehsil Haroli Distt. Una HP Km. 0-0 to 2-600 Sub Head Formation cutting, filling and GSB in km. 0-0 to 1-0, C.O 900 mm dia Hume Pipe Culvert at RD 0-90
Widening of road from NH-105 to CETP, Kenduwal.
C/o road from NH 105 Dattowal to Chuhuwal.
Restoration of Rain Damages on CMM road NH-205
SH Construction of Civil work WS and SI Works Rain Water harvesting tank Septic Tank and Site Development etc
PROVN OF RETAINING WALL BEHIND BLDG NO NH-105 (OFFRS LIVING) BESIDE NATIONAL HIGHWAY-5 FOR 2136 FD HOSP AT KARCHAM IN THE AREA OF AGE B/R-I POOH UNDER GE 863 EWS
C/O Rain Shelter at Ram Nagar near Lal Pani Bridge at RD 3/720).(Against NHAI Deposit
Model landscaping of NH-05 RD 67.00 to 72.00 Kms. Sub Head One year maintenance of Park at NH-05 Kms 69.200 to 69.500.
Cons. of Long-Term Remedial mea. River cut/bank erosion at identified 19 locations (i.e. ARC-16 ARC-46 RC-28 RC-29 ARC-36 ARC-37 ARC-38 ARC-39 ARC-31 ARC-32 ARC-33 ARC-34 ARC-35 RC-16 ARC-17 ARC-18 RC-26 ARC-29 ARC-30) KULLU TO MANALI NH-03 in HP
Construction of 9 FOB on Balance work of Four laning of Kiratpur to Nerchowk sec of NH 21from km 12.75 to km. 26.5 km. 126.5 to km 158.5 including ACC link road from km. 0.0 to km 2.003 Greenfield Alignment (excluding Sundernagar Bypass) pkg 2 on EPC
R.R damages on Kalka Shimla Wangtoo road NH 22 New NH 05 KM 155.00 to 236.00 SH C.O PCC R.wall at Km 211.792.35 to 211.822.35
Maintenance of existing stretch of NH-103 (Old NH-88) from Km. 96.500 to 131.000 of Shimla Mataur section in the state of Himachal Pradesh
Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh
SH C O building with Toilet block Sanitary installation, Spetic Tank Parking area Rain Harvesting Tank and R Wall
Upgradation of Shivbari to Dhawali upto NH 503 road HP12177
R.R damages on Kalka Shimla Wangtoo road NH 22 New NH 05 KM 155.00 to 236/00 SH C.O PCC R.wall at Km 165.745 to 165.765
Development of new A site RO With in 03 KM of Daulatpur Towards Kangra on NH - 88 New NH-503, Distt-Kangra, Shimla DO under PSO
Periodical Renewal of Baddi-Manpura Section of NH-21A (New NH-105) from Km 17.500 to Km 27.000 in the State of Himachal Pradesh (2nd Call).
Providing and fixing of road side boundary pillars for Land Acquisition from Km. 141/0 to 196/495 on NH-70 (New NH-03) against OFC deposit
Re-Construction of Minor bridge at Km. 11/430 on NH-503 A in the State of Himachal Pradesh (Job No. NH-503-HP-2022-23-539)
Repair of path Uday Vihar to NH Ward No.1CRF Grant
Improvement of Road Safety on NH-70 from Km 58 400 to Km 114 0 by Providing and fixing Thrie Metal Beam Crash Barrier Construction of Retaining wall Breast wall Construction of U-Shape drain with edge wall and Providing and fixing of Sign
C/o R/wall at RD 71/110 to 71/120 (R.H.S)2023-24 in the state of H.P. FDR(NEW) Job No. RO-HP-NH-70(03)-2023-24-017
C/o Steel footpath on Kalka Shimla Wangtoo Road NH 22 (New NH 05) in various reaches between km 153/180 to 155/00 against Smart City Project
Periodical Renewal on Nagrota Bagwan Ranital Mubaripur road Km 18 00 to 39 00 of NH 20A New NH 303 in the State of HP on EPC mode
FDR on Shimla Bye Pass road NH. 22 New NH.05 km 0.0 to 24.250 SH C.o R.wall between km 16.0 to 16.015 on Shimla Bye Pass road
Maintenance works and activities PBMC on section from Km 58 400 to 100 Gagret to Chouli on NH 70 New NH 03 in the State of Himachal Pradesh
Ordinary repair to Kala Amb Paonta Sahib Dehradun road on NH 72 (New NH 07) (SH Construction of PCC M10 retaining wall between RD 59/370 to 59/390)
A/R and M/O on NH 70 (New NH 03) Km.58/400 to 196/495 (SH-Repairing Patch/ Pot holes in Km 100/0 to 114/0)
Widening to two lane including road safety works on Paonta Sahib Rajban Shillai Meenus Hatkoti Road from Km. 149/00 to 161/715 on NH-72B (New NH-707)
R.R damages on Kalka Shimla Wangtoo road NH 22 New NH 05 KM 155.00 to 236.00 SH C.O PCC R.wall at Km 225.813 to 225.826 and 228.660 to 228.692
Providing and laying Crash Barrier for Road Safety in Nagrota Bagwan Ranital Mubarikpur road Km 5 to 18 of NH 20A New NH 303 in the State of H.P
Strengthening of road NH -105 to Malpur upper via Cipla G.P. Malpur.
C/o road from NH 105 to HRD agro, Kishanpura, G.P. Kishanpura
C/o road from NH 105 to ANG lifesciences, Bhud, GP Malpur
C/o road from NH-105 to Universal and other Industries, Chunri.
Strengthening of road from NH-105 Chandel Karyana Store to Beli Dyor.