Loading…
Loading…
1,567 results • Best match
Facility Service in NHAI RO and its PIU (Providing manpower viz Stenographers/Accountants/Computer Operators/Office Assistants/Site Engineers/IT Manpower/YP (Plantation)/LA (Asstt.)/Site Supervisor/Peon/Chowkidar/Security Guards...) for two years.
Engagement of user fee agency through E-Tender at Beer Mandi FP at Km 27.700 of Darah Jhalawar Teendhar section from Km 9.860 to Km 58.740 of NH12 (New NH-52) in the State of Rajasthan
Engagement of user fee collection agency on the basis of CB through etender for Baloh FP at km 121.935 for the use of Kiratpur Nerchowk Manali section of NH-21 in the state of Himachal Pradesh
Rehabilitation and Upgradation to 4lane configuration and strengthening of Thanpuri to Paror sec from Km 85.135 to 100.840 of NH20 (New NH154) (Design Length 16.275) of Pathankot Mandi under NH(O) in Himachal Pradesh on EPC
SH Balance work for Construction of Theog Bye pass road from Km. 174.040 to 176.400 Devrighat to Premghat on NH 22 New NH 05 in the State of Himachal Pradesh.
Development of New A site RO within 2 Kms of Dadour either side of four lane on NH-21,New NH-03, Village Majethal on Sunder Nagar-Mandi Road, Tehsil Balh, Distt. Mandi, H.P under Shimla DO.
Construction of Retaining wall at RD 89/965 to 89/980 (RHS) near Mubarikpur
Construction of Retaining wall at RD 78/330 to 78/345
Maintenance works and activities PBMC on NH 20A New NH 303 Nagrota Bagwan Ranital road km 0 to 5 and NH 20A New NH 503 Ranital to Mubarikpur in Km 39 to91 in the State of Himachal Pradesh
IE Services for Rehabilitation and Upgradation to 4Lane configuration and Strengthening of Sihuni to Mataur from Km51.000 to Km78.090 of NH20(New NH154)(Design Length 24.200KM) of Pathankot Mandi Section under NH(O) in Himachal Pradesh on HAM basis
IE services for supervision of Upgradation and 4Laning of Poanta Saheb Ballupur Section of NH72 in Himachal Pradesh and Uttarakhand under NH(O) on HAM Pkg1 n Pkg2 Poanta Saheb Ballupur Chowk Dehradun from Ch 0.000 to Ch 44.800.
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for Maura Fee Plaza at km 81.620 for the use of Kiratpur to Nerchowk section of NH-21 in the state of Himachal Pradesh
Rehabilitation and Upgradation to Four Lane configuration and Strengthening of Mo to Sihuni from Km 42.000 to Km 51.000 Design Length 8.330 KM of NH20 New NH-154 of Pathankot-Mandi Section in Himachal Pradesh on HAM Package IB
Recarpeting of link road connected to national highway Nichli sandholi to Uparli Sandholi Dadima Sandoli AND C/o link road from VMT to House of Baldev Ram AN C/o link road from Warehouse Malpur to Chakka Bye pass to Sandholi,G.P. Haripur Sandholi
SH C.o R.wall at RD 175.110 to175.121 under FDR in state of HP
construction of B wall at Km 175.040 to 175.130 and 177.215 to 177.275 192. 420to 192.430 and construction of M15 Drain PCC between 174.850 to 175.150
SH Removal of Land Slide .Slips and Construction of B.wall in PCC M 15 at RD 0.880 to 0.895 3.880 to 3.940 7.880 to 7.940. 9.635 to 9.660 14.615 to 14.650 15.380 to 15.400 20.080 to 20.300 21.080 to 21.200
SH C.o B.wall in PCC M 15 wire crates from RD 33.800 to 33.845 35.100 to 35.150 36.700 to 36.740 37.050 to 37.120 and 39.600 to 39.650
. S.H C.O R .Wall at Chainage k.m. 202.945 to 202.955 B.Wall at R.D. 220.150 to 220.200 201.700 to 201.760 201.885 to 201.910 168.900 to 168.960 169.020 to 169.025 169.025 to 169.065 and 169.860 to169.900 U shape drain at 201.885 to 201.910.20
Engagement of user fee agency through EQ for Jassi Baghwali FP at design Ch. 18.500 Entry/Exit booths for Six laning of Jodhpur Romana Mandi Dabwali section of NH-54 from Design Ch 0.000 to Design Ch 27.400 in the state of Punjab
IE Services for Supervision of Rehab and Upgrad of Exis Road from Kalar Bala Vill to Nauni Chowk of NH205 for 4 Lane with Paved Shoulder(Ch.Km41.000 to Km58.450 Length - 17.450 Km)PKG-IIC in Himachal Pradesh under NH (O)on HAM
AE for supervision of Balance Work for Four laning of Kiratpur to Nerchowk section of NH-21 from Km 0.000 to Km 12.750 and Km 158.500 to Km 182.215 excluding Sunder Nagar Bypass Pkg-1 in the State of Punjab and Himachal Pradesh
SH Construction of R wall at Km 181.745 to 181.770 B.wall at 201.710 to 201.820 201.885 to 201.910 and u shape drain at 201.710 to 201.820 and 201.865 to 201.910 respectively and providing subgrade metalling tarring between 174.920 to 174.990
SH Improvement of curve by constriction of slab culver at RD 52.00 wing wall at RD 51.963 to 51.998 edging on both facws from km 52.002 to 52.102 and strengthening of improved curve between RD 51.940 to 52.105
SH C.o RCC R.wall 191 to 415 to 191.445
SH C.o R.wall PCC RD 50.380 to 50.400 and R.Wall PCC RD 59.240 to 59.275.
SH C.o B.wall in PCC M15 and wire crates between 5.905 to 5.945 5.820 to 5.850 5.960 to 5.975 and 6.640 to 6.660 and R.wall at RD 06.020 to 6.030
SH C.o R.wall RCC at RD 46.555 to 46.580
SH C.o 1.5 mtr. Span precast box culvert at Km 26.800 28.820. 57.360.29.285
Construction of R wall at km 182.177 to182.197 B wall at km 201.060to 201.100 respectively and providing sub grade metalling tarring at depressed portions at km194.300 to 194.360 211.740 to 211.870 and Thrie Beam crash barriers at 182.177 to
IE Services during OM period of 5 years forNarnaul Bypass Crossing to Pacheri Kalan 11.30 Km Package-I.Ateli Mandi to Narnaul Section of NH-11 from Km.43.445 to Km.56.900 Package-II.Ateli Mandi as Feeder Route in Haryana on HAM(Pkg-III)
Engagement of user fee agency through e-tender at Maura FP at km 81.620 for the use of Kiratpur to Nerchowk section from Km. 73.200 to Km. 119.965 and Km. 0.000 to Km. 3.000 of NH-21 (Now 205 and 154) in Himachal Pradesh
4-laning of existing two lane section of Malout-Mandi Dabwali section of NH-09 from Danewala at km 7.000 (Design Ch. Km 7.00) to Mandi Dabwali at km 29.500 (Design Ch. 29.500) having design length of 22.5 km under BMP in Punjab (Package-1)
IE services for Construction of Proposed Narnaul Bypass Designed Length 24.0 km as an EC and Ateli Mandi to Narnaul Section of NH 11 from Km 43.445 to 56.900 Designed Length 14.0 km as a Feeder Route in state of Haryana on HAM Pkg-II
SH Supplying and stacking of crusher sand hiring of hydraulic excavator cum loader from km 165.0 to 224.0
SH Construction of R wall at Km 206.140 to 206.162 206.210 to 206.234 201.800 to 201.855 B.wall at Km 205.880 to 206.00 201.865 to 201.885 u shape drain cutting on hill side at RDs 205.880 to 206.00 respectively and providing subgrade metalling
SH construction of B-wall at Km 231.500 to 231.550 and233.340 to 233.360
Restoration of Rain Damages on CMM road NH-205 (old NH-21) in km 86/00 to 127/00
Restoration of Rain Damages on CMM road NH-205 (old NH-21) in km 86/00 to 127/00
Restoration of Rain Damages on CMM road NH-205 (old NH-21) in km 86/00 to 127/00
Restoration of Rain Damages on CMM road NH-205 (old NH-21) in km 86/00 to 127/00
Re construction of 6 bridges on NH 21A New NH 105 Pinjore Swarghat in the State of Himachal Pradesh.
Special repair to Old NH-22 to TTR in Km 62/200 to 67/200 (SH Providing and Laying renewal coat by providing 50mm thick BM with 30mm thick Bituminous Concrete and thermoplastic edge line in Km. 62/200 to 64/00)Under NHAI Deposit 2nd call
RFP for Construction of 5 No. FOBs between Solan to Kaithlighat section of NH22 (Now NH 05) from Km. 106.139 to Km. 129.050 under NHDP Phase III of EPC mode in the state of Himachal Pradesh.
C/o Retaining wall and road from NH Malpur to CDSCO C/o Retaining wall and road from NH Malpur to CDSCO C/o Retaining wall and road from NH Malpur to CDSCO C/o Retaining wall and road from NH Malpur to CDSCO
SH Supplying and stacking of crusher sand and hiring of Excavator cum loader in km 0.0 to 3.00 and 30.0 to 60.0
Near Kharapather Valley Side SH C.O building with Toilet block Sanitary installation Spetic Tank Parking area Rain Harvesting Tank and R.Wall
SH Filling Potholes and patch repairs at various RDs between Km 0.0 to 69.00
Repair of existing Rain Shelter at km.0/670 in SBP (Against NHAI Deposit
Engagement of user fee agency through E-Tender at Abul Khurana fee plaza at km 11.150 for the use of four lane of Malout Mandi Dabwali Section from km 7.000 to km 29.500 of NH-9 in the state of Punjab on HAM in the state of Punjab