O.R on Kalka Shimla Wangtoo Road on NH 22 New NH 05 Km 155.0 to 236.0 SH Cutting in earthwork 206.160 to 206.260
Ordinary Repair on Kalka Shimla Wangtoo Road NH 22 New NH 05 km 155.0to 236.0 SH C.O R.Wall at RD 217.781 to 217.802
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN HIMACHAL PRADESH (DBOT-2 SITES)
Strengthning on NH 22 NH 05 On Kalka Shimla Wangtoo Road from Km 208.700 to 214.00 and 223.500 to 236.00 in the state of Himachal Pradesh
C/o Nallah covered with RCC Slab along National Highway from Basdehra gate to Durga Property in Ward No. 3 MC Mehatpur Basdehra Una
Construction of Long Term Remedial measures of identified Landslide location i.e. Thalout Ch. 229.600 To Ch. 230.100 between PANDOH TO KULLU Section of NH 03 (Old NH 21) in the State of Himachal Pradesh under NH(O) on EPC mode
Rehabilitation and Upgradation to 4 Lane with paved shoulder configuration and Strengthening of Bijni to Mandi section from Km 202.815 to Km 208.000 of NH-20 (NH-154) (Design Length 5.357 KM) of Pathankot-Mandi under NH(O) in HP
IE Services for Rehabilitation and Upgrading of Existing 2-4 lane from Bhangbar to Kangra Bypass Section of NH-88 up to Intersection with NH-154 (Design Chainage-Km175.270-Km193.400) in Himachal Pradesh under NH(O) on HAM Mode (Package-VB)
Rehabilitation and Upgradation to 4 Lane configuration and Strengthening of Sihuni to Mataur from Km 51.000 to Km 78.090 of NH-20 (New NH-154) (Design Length 24.200 KM) of Pathankot-Mandi Section under NH(O) in HP on HAM basis (PKG-IIA).
Providing and laying of Interlocking Paver Block in km RD 59/300 to 59/360 near Beas Bridge Dehra
Restoration of road from National Highway to Lalpani, construction and repair of retaining walls, providing parking facility and miscellaneous allied civil works at Lalpani Shimla (H.P.)
CS for AE for supervision of Rehabilitation and Up-gradation to 4 Lane configurations and Strengthening of Thanpuri to Paror section from Km 85.135 to Km 100.840 of NH-20 (New NH-154) of Pathankot-Mandi under NH-(O) in H.P (Package-IIC) on EPC mode
Reconstruction of existing deteriorated stone masonry retaining/breast walls with plum concrete walls below existing staff quarters along the National Highway in the campus of JNV Theog, Shimla Subwork/Packages: Reconstruction of existing ... the National Highway in ...
Inviting Bids for lease of advertising space on 300 Pole in the form of Pole kiosk of 3x4 Ft located on National Highway with in MC Area.
Beautification of Chowk on National Highway-154 at Nagrota Bagwan in Distt. Kangra, Himachal Pradesh (SH-Construction of Clock Tower including providing and fixing Electrical Installation etc.)
O.R on NH 05 Kalka Shimla Wangtoo road km 155.00 to 236.000 SH Restoration of Rain damages by providing GSB WMM DBM and BC maintenance in various settled reaches of NH 05 between km 200.00 to 236.00
Construction of 4 laning of NH-5 (old NH-22) from Kaithlighat to Shakral Village (PKG I from Km 128.835 to Km 146.300 for Design Length 17.465km) in Himachal Pradesh on HAM
Construction of Major Bridge at Ch. 14.020 (RHS) at Pinjore-Nalagarh section on NH 105(Old NH 21A) in the state of Haryana on EPC Mode
O.R on NH 05 Kalka Shimla Wangtoo Road Km 167.0 to 236.0 SH Balance work of Repair of the existing damaged surface by providing DBM and BC at Various locations on NH 5 Between Km 167.00 to 200
Request for Proposal (“RFP”) issued by National Highways Infra Trust (NHIT) for Empanelment and Engagement of Agency/Firm for Supply, Installation, Repair and Replacement of Pedestrian Guard Rail (PGR) for the Projects under SPVs of NHIT.
Operations and Maintenance of Four lane Parwanoo-Solan Section of NH-22 (Now NH-05) from Km. 67.000 to Km. 106.139 in the state of Himachal Pradesh on Performance based Maintenance Contracts (PBMC)
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Permanent Shifting of LT line of Alert Inform and Detect (AI and D) system along the proposed two Lane National Highway Under Electrical Sub Division, HPSEBL, Thalout
Construction of Slope Protection Work at Various Locations on the Hillside between Km 67.000 to Km 106.139 of the Parwanoo Solan section of NH 22 (now NH 5) on EPC mode in Himachal Pradesh
Wayside amenities on various National Highways in the State of Himachal Pradesh along with their operation and maintenance Valley Hill Plain side SH C o Toilet block Septic tank Harvesting tank retaining wall and service lane etc
Construction of Long-Term Remedial measures of Landslide/River cut/bank erosion at identified locations between PANDOH TO KULLU on Kiratpur-Manali Section of NH-03 (Old NH-21) in Himachal Pradesh on EPC Mode
Construction of Retaining wall at RD 77/900 to 77/907.5 (L.H.S ) and 78/930 to 78/955 (RHS) Under FDR ( Job No. RO-HP-NH-503 -2023-24-019
Left bank Reservoir Rim Protection of Chamera-II Power Station along Chamba-Bharmour National Highway between RD 440 m to 480 m by providing Tetrapods, (Pkg. No. D-812).
Collapse of Airport operational boundary wall at Kangra Airport due to soil erosion and land slide towards National Highway. Sub-head- Construction of damaged boundary wall and associated works
Engagement of User fee collection agency on the basis of e-quotation through e-tender for Shahpur Kalyanpur Fee Plaza at Km. 13.400 of Poanta Saheb Ballupur Section of NH 7 (old NH-72) in Himachal Pradesh
Restoration of Rain damages on Kalka Shimla Wangtoo Road NH 22 New NH 05 Shimla Bye Pass Road Km 000 to 24.250 SH C.O R.Wall between Km 21.940 to 21.965 on Shimla Bye Pass Road
Construction of 6 Nos. Foot Over Bridges (FOBs) on Parwanoo to Solan section of NH-22 (Now NH- 05) from Km. 67.000 to km 106.139 in the state of Himachal Pradesh
Construction of 9 nos. FOBs between Pandoh to Manali section of NH-21 (Now NH 03) from km. 221.305 to km. 309.345 under EPC Mode in the state of Himachal Pradesh.
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Construction of New 2-lane with Paved Shoulder of Hamirpur bypass of New NH-103 (Design chainage km 121.175 to km 138.295 Design length 17.120 km) in the state of Himachal Pradesh under NH(O) on HAM Mode
Consultancy service for preparation and submission of infrastructure map of NH 705 Theog Kotkhai Hatkoti Road K.M. 0.000 to 30.000
R.R Damages on Theog Kotkhai Hatkoti road NH 705 k.m. 0.000 to 69.000 SH C.O R.wall at RD23.960 to 23.975
Engagement of user fee collection agency on the basis of EQ through E-Tender for Shahpur Kalyanpur FP at Km. 13.400 of Poanta Saheb Ballupur Section of NH-7 (old NH-72) in the State of Himachal Pradesh and Uttarakhand
Engagement of user fee collection agency on the basis of CB through E-Tender for Shahpur Kalyanpur Fee Plaza at Km.13.400 of Poanta Saheb-Ballupur Section of NH-7 (old NH-72) in the State of Himachal Pradesh and Uttarakhand
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF FOUR LANING OF PINJORE (END OF PINJORE BYPASS)-NALLAGARH SECTION (KM 4.200 TO 35.395) ON NH-105 (OLD NH-21A) IN HARYANA AND HIMACHAL PRADESH ON EPC MODE UNDER BMP
Maintenance of Kalka Shimla Wangtoo Road New Nh 05 Km 167.00 to 236.00 SH C.o R.wall at RD 191.620 to 191.628
Maintenance of Kalka Shimla Wangtoo Road New Nh 05 Km 153.180 to 236.00 SH C.o R.wall at RD 161.195 to 161.210
R R Damages on Theog Kotkhai Hatkoti road NH 705 k.m. 0.000 to 69.000 SH C.O Ramp at R.D 24.550 to 24.561
R.R damages on Theog Kotkhai Hatkoti road NH 705 k.m. 0.000 to 69.000 SH Removal of slips at R.D 15.700 to 15.800
IE services for supervision Construction of New 4Lane with Paved Shoulder from Dareota Village-Kalar Bala Village of NH-205 Chainage Km.33.175-Km41.000 TL 7.825Km including twin tube tunnel PKG-IIB in Himachal Pradesh under NH(O) on HAM 2nd call
Rehabilitation and Upgrading of Existing 2lane to 4lane from Jwalamukhi Bypass to Kangra Bypass of NH 88 up to Intersection with NH154 (Design Chainage -Km 157.000 to Km 193.407) in the State of Himachal Pradesh under NH(O) on HAM Mode Package-V
Construction of New 4 Lane with Paved Shoulder from Dareota Village to Kalar Bala Village of NH-205 (Design Chainage Km.33.175 to Km 41.000 Design Length 7.825 Km) including twin tube tunnel PackageIIB in Himachal Pradesh under NH (O) on HAM
IE Services for Rehabilitation and Upgradation to 2 Lane with Paved Shoulder configuration and Strengthening of Padhar to Bijni section from Km 180.000 to Km 202.815 of NH-154 of Pathankot-Mandi under NH(O) in HP on HAM basis (Package-VA)
IE Services for Rehabilitation and Upgradation to Four Lane configuration and Strengthening of Mo to Sihuni from Km 42.000 to Km 51.000 (Design Length 8.330 KM) of NH-20 (New NH-154) of Pathankot-Mandi Section in HP on (HAM) (Package-IB)