Loading…
Loading…
892 results • Best match
Rehabilitation and widening work for 2 Lane with Paved Shouldering of Existing National Highway 80 Alignment from Km. 132.895 to Km 190.150 Bhagalpur Kahalgaon Mirzachowki section in the State of Bihar.
4-laning of Bilaspur-Urga section of NH-130A from design Ch 0.00 to Ch. 70.200 From NH-49 near Dheka Village to Bhaisma Village under Bharatmala Pariyojna Lot 3 Chhattisgarh Pkg-I Raipur-Dhanbad Economic Corridor in the State of Chhattisgarh on HAM
Construction of 2 no. of Grade separated interchanges at Km 113.730 (Ranchi-Hazaribagh Road) and Km 139.225 (Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in Jharkhand on EPC Mode under NH(O).(Total Length 6.06 km)-2nd call
AE For Rehabilitation and upgradation of existing road to 2-lane with paved shoulders configuration in Purulia-Chandil section of NH-32(Km 70.524-Km 84.000) and from Km 94.300-Km 153.705 with NH-33 in West Bengal and Jharkhand(NHDP Ph-4B EPC Mode)
4 laning of NH-98 from KM. 23.284 to KM. 57.00 in the State of Jharkhand under Hybrid Annuity Mode
IE Services for Supervision of 4-lane Pathalgaon-Kunkuri CG/JH border section of NH-43 starting from end point of NH-130A design Ch. 00.000 to Ch. 104.250 as part of Raipur-Dhanbad Economic Corridor under BMP (Lot-5/Pkg-7) in Chhattisgarh 3rd Call
IE services for 4-laning of NH-80 section of Mirza Chauki to Farakka section from km 190.00-km 200.75 km (junction at km 3.100 of NH 133 B) and from km 260.00-km 283.00 (design km 274.133) in the State of Jharkhand (Package-II) on HAM
Ordinary Repair in Km 177(P) and Km 178(P) of NH-114A under NH Division Deoghar for the Sharawani Mela 2025-26
Installation Metal beam Crash Barrier Under Road safety Work of Existing Road from km 67.00 to 101.00 of NH 75 E(New NH-20) in the state of Jharkhand for the year 2024-25.
Routine Maintenance of Six Laning of Aurangabad to Bihar/ Jharkhand Border (Chordaha) Section of NH-02 from km. 180.000 tokm 209.827 (Pkg - I) and Incident Management of Six Laning of Aurangabad to Bihar/ Jharkhand Border (Chordaha) Section of NH-2
Four laning from km 218.500 (Khajuri) to km 259.640 (Wyndhamganj) on NH-75 (Section-V) in the state of Jharkhand on HAM
Widening, Strengthening and Reconstruction work of Dental More (on NH-75) to Nawadohari (on NH-343) via Hoor Charmuhan road (Total Length 15.132 km.) under Road Division, Garhwa
Renovation of Office building of NH Division Deoghar for the year 2024-25
DEVELOPING, OPERATING AND MAINTAINENCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN EAST ZONE IN DBOT BASIS IN THE STATE OF WEST BENGAL AND JHARKHAND(DBOT-NH12Baharampore - Farakka/Ch.252PLUS541/LHS/Ajagarpara/
Reconstruction Work of Dumuhi (Birkunwar Singh Chowk) (NH 133) to Chandni Chowk (NH 333A) Road from Km 0.00 to Km 11.050 (Total Length- 11.050 Km) under Road Division, Godda
Appointment of Safety Consultants for the projects Pararia-Mohania (pkg-II) section of NH-319, 4/6 lanning of Aurangabad- Chordaha/ Jharkhand Border section from km. 180.00 to km. 249.525 of NH-2 (Pkg-IandII) and 6lanning of Varanasi-Aur (2nd Call).
Engagement of user fee collection agency on the basis of Competitive Bidding through E-Tender for Madangundi Fee Plaza on NH-31 in Jharkhand
4-laning of Palma-Gumla Section of NH-23 from Km 26.00 to Km 89.170 in the State of Jharkhand on Hybrid Annuity Mode
Work Of evacuation and nuisance free transportation of pond ash from TTPS to NHAI project in the lead from 18 to 30 KM for usage in NHAI 6 lane green field Highway project PKG 12 under Bharatmala Pariyojana in the state Jharkhand.
Ordinary repair from Km 65.500 to Km 78.000 and drain, soakpit and paver block in Km 67(P) of NH-114A for the Shrawani Mela for the year 2025-26
Four laning from Km 196.870 (Sankha) to Km 219.600 (Khajuri) on NH-75 (Section-IV) (Rehla-Garhwa Bypass) in the state of Jharkhand on HAM
Widening and Strengthening/ Reconst. of Sundarpahari (NH-333A)- Chandana- Dama-Jamkudar- Agiamore Road (Total Length-24.440 Km.)
Independent Engineer services for four laning from km 218.500 (Khajuri) to km 259.640 (Wyndhamganj) on NH-75 (Section- V) in the state of Jharkhand on HAM
Four Laning of Mehgama Hansdiha section of NH 133 from existing Km 41.900 to existing Km 93.000 in the State of Jharkhand on Hybrid Annuity mode.
Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from 209.827 to km. 249.525 (PKG-II) in the State of Bihar under Bharatmala
Consultancy Services for DPR Preparation for 4 / 6 Laning with 7.0m service road on either side of Ranchi circumferential road starting from Urkid NH-20 - NH-75 - NH-43 - NH-75Ext - Harbul NH-33 and -Urkid NH-20 with spurs road Total Length- 195 Km
Independent Engineer services for 4 laning of Palma Gumla Section of NH 23 from Km 26.00 to Km 89.170 in the State of Jharkhand on Hybrid Annuity Mode
Independent Engineer services for 4-laning of NH 98 from Km 23.284 Hariharganj to Km 57.049 Near Parwa More in the State of Jharkhand on Hybrid Annuity Mode
Independent Engineer services for Four laning from Km 196.870 Sankha to Km 219.600 Khajuri on NH 75 Section IV Rehla Garhwa Bypass in the state of Jharkhand on HAM
DEVELOPING, OPERATING AND MAINTAINENCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN EAST ZONE IN DBOT BASIS IN THE STATE OF WEST BENGAL AND JHARKHAND(DBOT-NH12/Farakka -Raiganj/Ch.307.200/RHS/UttarDariapur 2PIUMALD
Widening and Strenghthening Reconstruction of Dhamaniya to Seregarha (NH-99) via Kacha-Moktama-Tarog
Surface renewal work of Bajrangi Chowk (NH-333) to Deoghar Thana More (NH-333) Via Jain Mandir ,Geeta Devi DAV (Junior) School, Baidnathdham Railway Station Road under Shrawani Mela for the year 2025-26
Construction 4 lane ROB in Lieu of LC no. 9 between Piska More to Palma Section at Km.14.370 of NH-23 on EPC mode in the State of Jharkhand
Consultancy Services for preparation of Feasibility study and detailed project report for construction of NH-133 section from Ekchari to Mahagama (tentative length 40 km) in the State of Jharkhand.
Independent Engineer services for Four Laning of Mehgama Hansdiha section of NH 133 from existing Km 41.900 to existing Km 93.000 in the State of Jharkhand on Hybrid Annuity mode
DEVELOPING, OPERATING AND MAINTAINENCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN EAST ZONE IN DBOT BASIS IN THE STATE OF WEST BENGAL AND JHARKHAND(DBOT-NH18/Purulia -Chandil /Ch.146.430/RHS/Chandil/PIU-PuruliaJH
Evacuation of Ash from BPSCL ash ponds and nuisance free transportation along with disposal of the same to NHAI road projects.
IRQP WORK OF SURDA CROSSING TO NH-33 ROAD LENGTH -6.00KM FOR THE YEAR 2024-25
4 Laning of Basukinath to Deoghar Section of NH 114A from Design km 85.081 to Design Km 130.240 (Design Length 45.159 km) in the state of Jharkhand on Hybrid Annuity mode
IE services for 4-laning of NH-80 section of Mirza Chauki to Farkka from km. 215.00 to km. 260.00 in the State of Jharkhand (Pkg-I) on Hybrid Annuity Mode
Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode
Engagement of user fee agency on the basis of EQ through etender for Navasari Fee Plaza at km 232.385 on Giridih-Jharkhand Section of NH-114A in the state of Jharkhand
Ordinary repair of road at Km 58(P) to 93 (P) of NH-333A
Improvement of surface from Ch. 65.500 to Ch. 78.00 of NH-114A Under Sate Fund in the state of Jharkhand for the year 2022-23.
Improvement of surface from Ch. 78.00 to Ch. 87.000 of NH -114A Under state Fund in the state of Jharkhand for the year 2022-23.
Shifting of 40 meter ground based tower to another site due to NHAI road widening at Pupunki Lohapatti at ,Bokaro (BA- Dhanbad)
Surface Renewal of Meharma (NH 133)- Tetaria- Parasi Road (Total Length- 19.01 Km) at Chainage 1st, 2nd, 3rd, 5th, 7th, 12th km under Non Plan head for the Year 2026-27.
Surface Renewal of Meharma (NH 133)- Tetaria- Parasi Road (Total Length- 19.01 Km) at Chainage 1st, 2nd, 3rd, 5th, 7th, 12th km under Non Plan head for the Year 2026-27.
Design Engineering Supply Erection Testing and Commissioning for height raising of 220 kV S-C Chandil-Santhaldih transmission line of JUSNL crossing NH-32 at Km 149 under Bharatmala Project of NHAI on turnkey basis
IRQP work of Hazaribag St. Columbas College More Churchu Hatyari More NH 33 Road Length 30.038Km Under RCD Road Division, Hazaribag for the Year 2021-22