Loading…
Loading…
2,194 results • Best match
Engagement of user fee collection agency on the basis of E quotation through e-tender at TP-04 Sunderpalya Fee Plaza to Baireddipalle Fee Plaza for the use of Four lane Bangalore Chennai Expressway on HAM in Karnataka and Andhra Pradesh
Engagement of user fee collection agency on the basis of CB through e-tender at Kachwar Fee Plaza at km 210.550 from Km 182.120 to Km 227.600 of Telangana/Karnataka Border (Haggari) Mahabubnagar Jadcherla Section of NH167 in Telangana
Engagement of user fee collection agency on the basis of CB through etender for Halligudi Fee Plaza in the state of Karnataka and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency on the basis of CB through etender at Bangalore Nelamangala section of NH4 at 6 fee plazas located in the State of Karnataka and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee collection agency on the basis of CB through etender for Kannegala Fee Plaza at km 144.130 K.N. Hundy Fee Plaza at km 200.400 and Yeddore Fee Plaza at km 236.550 in Karnataka
Construction of balance work of 4L with paved shoulder of Bellary Bypass from Ch. 254.630 to Jn at Ch. 266.837 (Length 12.207 Kms) and 1 Km Stretch From Ch. 277.690 to Ch. 278.690 at D. Hirehal of NH150A of Bellary Byrapura Sec in Karnataka on EPC
Construction of STRR (West side) NH948A Balagondapalli (Tamil Nadu) to Karnataka or Tamil Nadu border from km 144.170 to km 179.936 in the state of Tamil Nadu on Hybrid Annuity Mode under Bharatmala Pariyojana
Consultancy Services for Preparation of DPR/ Feasibility report for Pune Bengaluru Expressway green field alignment under Bharatmala PhaseII in the state of Maharashtra and Karnataka.
4 Lane Expressway from km 26.400 to km 53.500 of Malur to Bangarpet Section of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Phase-I Package-II)
Construction of access controlled 4-laning with paved shoulder from Mysore-Kushalnagara from Ch.Km 122.200 near Guddehosur-Kushalnagara Bypass to Ch. Km 144.900 at SH-21 Hassan-Periyapatna Road Junction on HAM under BMP in Karnataka(PKG-II)
CS for AE for supervision of Construction of 6Lane Bridge across Palguni River at km 368.849 of length 182.50m and improvement works from Design Chainage km 368.356 to Design Chainage km 369.132 on NH66 on EPC in Karnataka
CS for IE for supervision of Construction of 4laning of Sannur to Bikarnakette section from Existing Km 698.850 Design Km 691.350 to Existing Km 744.190 Design Km 736.362 of NH169 under BMP on HAM in Karnataka Pkg3
Engagement of user fee collection agency on the basis of CB for Hebbalu FP at Km.237.650 for the section of Doddasiddanahally to Hadadi in the state Karnataka
Providing and Laying of Optical Fiber Cable (OFC) from km 22.000 to km 534.72 of Hyderabad Bangalore Highway on EPC mode in the state of Telangana, Andhra Pradesh, and Karnataka.
4 Lane Expressway from km 53.500 to km 71.000 of Bangarpet to Bethamangala Section of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Phase-I Package-III)
4 laning of Channarayanapatna BP from km 140.449 to km 149.596 and Hassan BP from km 175.935 to km 185.684 and providing Grade Separator Structures Service Road and other safety measures in Devihalli to Hassan of NH75 (old NH48) on EPC in Karnataka
CS For AE for Supervision of Construction of 4 lane realignment of Old NH207 (New NH648) From TN/KA Border (Ch 0.000) To Hoskote (Ch 20.900) under BMP as a part of Bangalore Ring Road in Karnataka on EPC Mode
CS for AE of 4 laning of Channarayanapatna Bypass from km. 140.449 to km 149.596 and Hassan Bypass from km 175.935 to km 185.684 and providing Grade Separator Service Road and Devihalli km 108.486 to Hassan (km. 185.684) on EPC in Karnatak
Engagement of user fee agency through CB at Jajirakallu FP Village at Design Km.281.430 of NH150A of four laning of Bellary Byrapura of NH150A from Km. 253.600 to Km 308.550 on HAM mode under BMP in Karnataka
Output and performance based maintenance of Rd from Km 136.600 to Km 268.475 (Excluding from Km 200.600 to Km 215.300) Raising of Profile of submerging portion at Km 192.450 to Km 193.550 from Kerala Border to Kollegala Sec of NH766 in Karnataka.
CS for AE for supervision of construction of 2Lanes With or Without Paved Shoulders From Km 0.000 To Km 69.480 Of Sanquelim To Belagavi Section Of NH748AA in the state of Goa and Karnataka under Bharatmala Pariyojana on EPC mode
Construction of 4-6 lane bypass for Belagavi city from Km11.00(Goa side) of NH4A to Km516.000(Pune side) of NH4(Length 34.48km) inKarnataka on HAM(Pckg1A)
IE for supervision 4 Laning km 0.000-km26.400 Bangalore-Malur (Pkg-I)km26.400-km53.500 Malur-Bangarpet (Pkg-2) and km53.500-km 71.000 Bangarpet-Bethamangala (Pkg-3)Bangalore Chennai Expressway HAM under BMP in Karnataka(Phase-I)
CS for IE for supervision of Construction of STRR (West side)NH948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km144.170 to km 179.936 in Tamil Nadu on HAM under BMP
Consultancy services for Independent Engineer for supervision of four laning of Tumkur Shivamogga section from Ch.170.415 Km to Ch.226.750 Km Bettadahali Shivamogga of NH206 (PackageIV) in Karnataka under Bharatmala Pariyojana on HAM
Engagement of user fee collection agency on the basis of EQ through etender for Electronic City FP and Attibele FP in the state of Karnataka and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee agency on the basis of CB through etender at Gaddurur (Nangli) Fee Plaza in the State of Karnataka and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee collection agency on the basis of CB through e-tender for Kulumepalaya and Chokkenahalli FP at Neelmagla to Tumkuru section from design Km 29.50 to Km 62.00 of NH48 in Karnataka
Engagement of user fee agency on the basis of Competitive Bidding through e-tender at Kannoli Fee Plaza at km 241.100 Harval Fee Plaza at km 303.400 for the Development and Upgradation in Karnataka
Construction of access controlled 4laning with paved shoulder from Mysore-Kushalnagara sec of NH275 from Km144.900 Near Hemmige Village SH21 Hassan -Periyapatna Road Junc to Km169.000 at Near SH86 Ramanathapura-Terakanambi Road KR Nagar Junc in Hunsu
Annual Maintenance of NH-13 to join Bhadravathi Taluk Border via Hosudi, Shettihalli, Thadasa (MDR) from Ch. 0.00 to 12.40 Km in Shivamogga for the year 2025-26.
Annual maintenance of the NH-209 to join Vaddarahalli via Manchanahalli,Manchanapura from Ch 0.00 km to 8.50 km for the year 2026-27 in Malavalli Taluk, Mandya District
Improvements to road from 38th KM of NH 48 - Duddha to join Nambinayakanahalli via Rayashettipura from CH-5.01 km to CH 5.51 km (Doddakottagere to Chandagalu) in mandya taluk.
Annual Maintenance of Road Hosuru to NH-4 via Dyagerahalli, Gorladaku From Ch 1.50 to 2.50 and 3.50 to 8.00 km in Sira taluk for the year 2026-27
Annual Maintenance of Katapadi (NH 66) from -Abbakka Circle (Ullal) SH300 KM 42.11 from 45.20,46.15 from 46.85 and 51.00 from 53.58 also from 56.03 to 63.86 in Moodbidri Taluk.
Annual Maintenance to Hebbalagere (NH-369) to Kanchiganal Cross (SH-245) road (Via Haralakatta-Kanchiganal) from Ch 0.00 to 8.93 Km, Goppenahalli-Kalkere Road (via Kanchiganal) Ch 9.14 to 10.43 & 10.86 to 14.52km, Nallur-Devarahalli road (Via ... Channagiri( NH -369)-Kagatur ...
Re-carpeting to NH-4 Ato Desur Railway station via Waghvade Laxmi Nagar approach road from Km. 0.00 to1.00 in Belagavi South Constituency of Belagavi Taluk MDR Under CRIF 2023-24.
Re-carpeting to Maharashtra Border to Rakasakoppa Sutagatti SH-141 to join NH-4 from Km. 30.00 to 32.75 in Yamakanamardi Constituency of Belagavi Taluk.(Agasaga to Chaluvenatti) (in selected reaches)
Construction of new A site RO at Sangam to Kamalnagar on Udgir - Bidar road on LHS, On NH No. 50, Holsamudra village, Kamalnagar Taluk, Bidar district under Bellary DO of KASO.
Maintenance of road from NH-4 to Budihal, Kachanahalli via Baradi to connecting Doddabele Railway Station in Ch 0.00 km to 5.86 and 6.56 to 15.00km inNelamangala Taluk, Bangalore Rural District.
Construction of ROB in Lieu of LC 110 at Km 108.525 and LC 152 at Km 73.25 on NH 69 Honnavara Chittoor section in the State of Karnataka on EPC mode
Re carpetting to Jamboti-Rabakavi SH-54 from Km.29.10 to 30.05 in Belagavi North Constituency of Belgaum Taluk. From Killa Circle to NH-4 Bridge under Central Road Fund scheme
Annual Maintenance of Chitradurga road to (NH-48) Hunsekatte (SH-224) via Papenahalli- Rayanahalli- Chikkappanahalli- Madanayakanahalli Ch 0.00 to 19.00, 19.25 to 21.00 and 21.90 to 25.15 Km in Chitradurga Taluk
Developments to road from NH 63 to Chikkahandigol interior road and Costruction of Drain and Asphalt road in Hulkoti village of Gadag taluk CAT-II(A). Under 2025-26 CMIDP Yojane
Maintenance of road from NH-4, Mahimapura via Margondanahalli to connecting TNAProad in Ch 0.00 km to 6.00 km in Nelamangala Taluk, Bangalore Rural District. (Ch 0.00 km to 6.00 km)
Annual Maintenance of Hadagali(NH-50) near satihal to join SH-41 via Yambatnal Neginal Mullal bommanhalli Markabbinahalli road km 7.68 to 25.50 H/A 3054-04-337-0-10-200
Annual Maintenance for the year 2025-26 of NH-48 B.M Road to join Ningegowdanakoppalu Shettihalli Road via Uppalli, Hampanakuppe, Maligenahalli Road from Km.0.00 to 8.00 km in Hassan Taluk.
Annual Maintenance of Road NH-4 to Ginnappanahatti Via Bhuvanahalli, Shagadadu From Ch 0.00 to 9.70 and 10.60 to 17.00 km in Sira taluk for the year 2025-26 (ST RESERVED)
Annual Maintenance of Banavara to Hagalavadi cross via, A.Mallapura, Tippanahalli, Pura, Arehalli, Doddametikurke, Kittanakere, Madarahalli,( NH-251) from ch 6.86 to 25.00 km for the year 2025-26 in Arsikere Taluk.
Providing metaling & Asphalting at selected reaches km 0.00 to 0.60 Domanal to NH 50 Approach road in Bagalkote taluka of Bagalkote District. under 3054 MDR Maintenance for The year 2024-25.