Loading…
Loading…
2,194 results • Best match
Road Safety Works on Old NH 48 Haveri City Road (Near RTO office, Near Yalavatti Ettangi Factory, Near Old PB Road and Haveri Shivajinagar 2nd Cross in Haveri Taluk Haveri District
filling of pot holes Jungle Clearance Rectification of damaged shoulders Removal of Unserviceable Soil Longitudinal unlined drain work of NH 275 pertaining to Mysuru Sub Division Bantwala Bengaluru Section Karnataka State
Balance Work of Construction of two/four lane with paved shoulder from km 422.00 to 523.600 (Chitradurga to Shivamogga Section) of NH 13 in the State of Karnataka on EPC mode
Periodical Renewal from Km.16.00 to 30.00 and from Km.86.00 to 90.00 of NH 169A Thirthahalli Udupi section in the State of Karnataka. (Job No.NH-169A-KNT-PR-2019-26)
Widening of existing road to 2 lane 4 lane from km 98.450 to km 100.120 along with widening of existing Major Bridge near Manik Nagar at km 99.225 of NH 50
Road Improvements from Nandoor K ( NH-150) village to Kusnoor thanda in Kalaburagi Rural Constituency, taluka and district Kalaburagi. Under 5054 SH Road Improvements Appendix-E for the year 2025-26
Construction of Aproach road and Protection work at ch 22.20 in road From SH-03 Koratager to Andra Border via Vadagere Kodagadala puravara I D halli (NH 234) in Madhugiri taluk
Improvements of road from Ambedkar Circle to Gandhi Circle in Bhalki Town and Resurfacing of Road NH-752K Bhatambra village from km 26.42 to 26.70 in Bhalki Tq, Bidar District. BDR25210354
Providing and laying of HDPE water supply pipeline along NH 209, Kollegala road and balance sewer pipeline along Kanakapura road in Malavalli town (including 1 year DLP) (lumpsum tender no variation)
Special renovation of the road connecting NH-234 to SH C-15 via Kaimara, Attigunda, Kemmannugundi, Lingadahalli, Birur, Yagati, Singatagere, and Shinigere from 85.50 km to 87.50 km in Tarikere Taluk.
Construction of Road to Connect Hire-Bagewadi NH-4 to Rani Channamma University in Rural constituency of Belagavi Taluk Under HOA 5054-MDR Improvements(Appendix-E) for the year 2024-25
Annual Maintenance of Mankani, Devalapur joining NH-13 to Bevur MDR from Km 0.00 to 14.22,in Bagalkote Taluk of Bagalkote District. Under 3054 MDR Maintenance for the year 2025-26
Improvemnet of NH-150(A) Thuppadhadakanahlli Cross to Hosuru Cross of Belagatta - Molakalmuru Road via Lambani hatti, Inahalli from km 0.00 to 9.00in Molakalmuru taluk (Working Chainage km 6.60 to 7.557)
Recarpeting to Mattihal Malaghan Masuti Kudagi to join NH-13 road Km 13.60 to 23.00 (In selected reaches) in Basavana Bagewadi taluk H/A CMIDP (4059-80-051-0-60-132)
Raising of plantation at Ronihal cross To Kolhar NH 52 Road side-5km, Byaravadagi to Yalavar road side-5km and Yalavar to Kadakol road-5km during 2025-26. (RESERVED FOR OTHERS)
Annual Maintenance of Shivamogga - NR Pura Road (MDR) to Join NH-206 Via Nidige from from Ch. 0.00 to 4.10 & 5.52 to 6.41 Km in Shivamogga for the year 2025-26.
Construction of CC road from NH-4 Service road to Muttyanatti road in corporation limits of Belagavi North Constituency in Belagavi taluka under 5054 MDR Improvements Appendix E for 2024-25.
Improvements to road from NH-209 to join S3 road via Hosadoddi, Dyavapattana, Nanjanayanapura, Vakkarahalli, Honaganahalli, Haladasanahalli, Kaggalipura, Kiragasuru from Ch.6.10 km to 7.55 km in Malavalli taluk Mandya District
Repairs to pipe culvert and hardpath and earthen drain to drain out standing rain water easily at ch. 46.50km in Haradananahalli Chanamallipura road SH 305 connecting NH 766 in gundlupete taluku
Annual maintenance of road from NH-7 to Join Juttanahalli Cross via Akkupete, Bommavara, Devaganahalli, Chikkacheemanahalli, Kundana, Lingadheera gollahalli, Sulikunte, Pandithpura from Ch-0.00 km to 18.00 km in Devanahalli taluk
Construction of Road from Kellur (on NH-150A) Connecting Halgadla from Km 1.70 to Km 4.70 (Kellur to Halgadla) in Jewargi Taluka under KKRDB CDQ for the year 2025-26 (KLB2510303114)
Maintenance of Road NH-150A to Anabi Road from Km. 0.00 to 12.55 (Working Chainage Km 0.00 to 5.00) in Shahapur Taluka. (Under 3054 MDR Maintenance for the year 2025-26)
Improvements to NH-206 to Nelligere-Sira Road Via Heruru, vadaluru, Belavatta Aremaranahalli, Karegowdanahalli from Ch.7.60 to 8.50 km and ch.14.00 to 18.00km in selected reaches in Gubbi Taluk
Maintenance of Road from NH-207 to Kondenahalli Gate (SH-104) via Gangawar, Chowdappanahalli, Kaggalahalli Ch.2.55 to 3.20, Ch.3.50 to 3.95 & Ch.4.20 to 6.20 Km in Devanahalli Taluk.
CULVERT REPAIR WORK ON THE ROAD CONNECTING BADANAVALLU (NH 150A) OF STATE HIGHWAY 301 TO VEERANAPURA GATE (STATE HIGHWAY 81 ) ON BASAVATTIGE-HEMMARAGALA-KEBBEPURA ROAD CH.3.70 KM AND 3.90 KM
REVOLVING CENTRE MT-5 HAVING MAXIMUM LOAD CAPACITY OF 4400 LBS AND FOR OPERATING ON 2500 RPM SUITABLE FOR NH 26 LATHE MACHINE OF MAKE HMT accepted make/brand: Trumax/ Similar
Annual maintenance of the NH-209 to join SH-33 via Matti Thaleshwara Temple from Ch.0.00 km to 10.00 km for the year 2026-27 in Malvalli Taluk, Mandya District
ANNUAL MAINTENANCE TO KUNTIBAILU MUDARU (RAMERAGUTTHU NH 169 TO SH 249) MDR FROM KM. 0.00 TO 3.15 AND NELLIKARU RENJALA MDR FROM KM.0.00 TO 8.92 IN KARKALA TALUK, UDUPI DISTRICT.
Maintainance of Road from NH-4 to join SH-74 via Nagaruru Honnsandra cross Narasipura, Govindapuru Basavanna Temple, Kukkanahalli and Kodihalli at ch 0.70 to 4.00 km in Bangalore North Taluk
Maintenance of road from NH-4, Devarahosahalli via Agalakuppe connecting to Sompura in Ch 0.00 km to 9.00 km in Nelamangala Taluk, Bangalore Rural District. (Ch 0.00 km to 15.00 km)
Annual Maintenance of MDR 1) Devikoppa to Baichawada vai Dimbavalli from Km 0.00 to Km 7.00, 2) NH-63 to Singanhalli vai Galangingatti from Km 0.00 to Km 5.00, 3) Tambur to Tavargeri from Km 0.90 to km 8.82,4) Tambur to NH-63 from km 0.00 to Km 4.20, 5) Dimbavalli to Sangameshwar from km 0.00 to km 4.87 in Kalaghatagi Taluka of Dharwad Dist For the year 2025-26.
Annual maintenance of Highway Connecting Banavara (on NH-69) to Haagalavaadi Cross (on Tumkur - Hagalavadi Road) via A. Mallapura, Thippanahalli, Pura, Valehalli, Doddametikurke (on SH-102), Kittanakere, Handanakere, Mathigatta (on SH-47), Kuppur, ... (on NH -150A), ...
Annual maintenance of the NH-209 to join Hadly circle via Chandahalli, Chottanahalli from Ch 0.00 km to 11.27 km for the year 2026-27 in Malvalli Taluk, Mandya District
Annual maintenance of the NH-209 to join PS Road via Nadakalapura, Gramadevathapura, Dangur,Shanaboganadoddi from Ch.0.00 km to 10.00 km for the year 2026-27 in Malvalli Taluk, Mandya District
Annual maintenance of Road from Mylanahalli (SH-104) to Bommasandra (NH-44) from Ch 75.80 to 79.34, 80.71 to 83.20, 89.93 to 90.43 and 92.13 to 93.38 Km in Bangalore South Taluk
Maintenance of Road From Killanakera To Toranatippa Via NH-150 Km 0.00 To 4.60 and 17.30 To 20.70 under 3054 (MDR) for the year 2025-26 In Yadgir Taluka (Reserved for ST)
Repairs to CD on NH-218 Mandewal Cross to Mahur Road at Km 8.50 in Jewargi Taluka Under 3054 MDR Bridge Maintenance for the year 2025-26 (work reserved for ST category)
Construction of a compartments or kennel for a shelter of dogs at APMC Mega Market Premises next to NH 48 to Conduct sterilization surgery for stray dogs in th RNR CMC limit
Providing metaling & Asphalting at selected reaches from km 7.60 to 7.95 on Chikkamyageri NH-13 Approach road in Bagalkote taluka of Bagalkote District under 3054 MDR Maintenance for the year 2024-25.
Repairs to NH-63 Madakihonalli to Ramanal via Sangadevarkoppa MDR from Km 7.20 to Km 7.75 in Kalaghatagi taluk of Dharwad District(km 7.650 to 7.750)(RESERVED FOR CAT-II(A) CATEGORY)
Filling of pot holes Jungle Clearance Rectification of damaged shoulders Removal of Unserviceable Soil Longitudinal unlined drain work from KM 199 250 to KM 211 250 of NH 275 Bantwala Bengaluru Section
Providing the Street light in the work of Widening and Improvement work to road of Challakere (NH-150A) to Vishwanathanahalli road (State Highway-243) from Km 76.10 to 76.485 in Challakere taluk
Construction of Box culvert and approach road from Guggarahatti Kakarlathota Mundrigi Mincheri MDR to connect NH 150 A on Ballari City constituency, Under 5054-KRDCL Budget Expenditure for the year 2026-27.
Short Term Maintenance Contract STMC for NH 69 for Chainages at Km 71 to Km 82.6 Churikatte to Sagara km 89.500 to Km 111.50 Sagara to Anandapura in the State of Karnataka
Construction CD on NH-218 to approach Road Raddewadgi to Koodi Via Kolkur at Chainage 9.00 Km MDR Road under 5054-80-190-0-01-132 KRDCL for the year 2025-26
Improvements to Village road From B.B. (NH-275) Road Joining Naviluru Gate to Poonadahalli via Charapura, Gandhinagara Road From Ch. 0.00 to 4.00 Km (Working Ch. 0.00 to 3.58km)-One Time Improvements
Annual Maintenance for the year 2025-26 of BM road to (NH-75) Via H.Aladahally, Junjanahally, Hosuru, Nellakihalli Via Kowshika-Markuli-Malali joining road Km.0.00 to 7.00 Km in Hassan taluk.
Improvements to road from NH-234 to SH-94 Via Akki pikki colony, Hosuru, Sonaganahalli at ch-0.00 km to 8.00km in Gowribidanur taluk, Chickaballapura District.( working ch 2.08 km to 7.10km)
IMPROVEMENTS TO ROAD FROM NH-63 TO DANDI DARI ROAD AND ,CONSTRUCTION OF 4 NOS CD AND 400 MTR CC ROAD IN HULKOTI VILLAGE OF GADAG TALUK UNDER 2025-26 CMIDP YOJANE.
Improvements to road from NH-4 (Kantharaj Circle) via Avani, Yalagondahalli, to join Bangarapet Border from Ch 11.50 to 12.38 Km in Mulbagal Taluk (Ch 0.00 to 13.70 Km) (MDR)/Call-2