Loading…
Loading…
2,187 results • Best match
Asphalting Of Road From NH 209 to Nadukalamole Hosamole Via Kempanapura in Chamarajanagara Taluk.
Improvements to Road from NH-150A to Chikkanahalli Road in Molakalmuru Taluk (VR-107)
Four laning of Bellary to Byrapura section of NH-150A from km.253.600 to km.308.550 on HAM mode under Bharatmala Pariyojana in the State of Karnataka- Improvement of exisiting road in Bypassed/Realigned Sections under one time development upon ... by NHAI to ...
AME of road from SH84(Shira-Nanjangud Road) to National Highway 212 Via Gonahalli Kirugunda Kamalli Hadya Karepura Jannuru Bagali Muguru join road (NJG8T) in Nanjangud Taluk, Road from Hadya Village to Karepura Via Gaganurupura Ganagamuru and Bhogaiahnahundi loop road(1.65KM)in Nanjangud Taluk (MYS 14) and Road from Basavanapura Ayarahalli (SH210) to Kempisiddanahundi Hejjige Toremavu Immavu join road Via Hejjige in Nanjangud Taluk (MYS 15)
Annual Maintenance for the year 2025-26 of Kengal (National Highway-275) to Alur (State Highway-110) Byrapur (State Highway-102) ch.191.820 km to Basavaghatta ch.193.440 and ch.193.440 km to 196.160 Niragunda, 196.160 to 198.54 Km Nittoor, Rayapur (State Highway-21), Kadadarvalli Chikkagaddavalli KM 229.02 to Varthikere (State Highway-275) from Km 198.54 to 211.13 and 222.28 to 225.00 in Hassan Taluk.
Short Term Maintenance Contract STMC from Km 308.54 to 335.064 Km 382.70 to 400.70 of NH-52 Hosalli to Yellapur Mastikatta to Baleguli section pertaining to Belagavi NH Division in the state of Karnataka
Improvements to road from NH-44 to Join NH-69 via Gangarekaluve Dibburu Katharaguppe Maralakunte & Thammanayakanahalli in ch 12.60 km to 13.00 km in (Kataharaguppe Village limit) Chikkaballapura Taluk & District. (Reserved for SC category)
Strengthening the SH road starting from NH 75 near Makali connecting SH 104 at Mylanahalli passing through Honnasandra cross Alur APMC Yard Basaveshwara temple Kodipalya Madhure Kakola Rajankunte Thimmasandra Bettalasur NH 7 Muthukadahalli B
Long term rectification to the black spot at Tamboor Cross at Km.19.00 and at Mastikatta Yellapur road at Km 99.00 of NH-52 Old NH-63 in Karnataka including Shifting of electrical utilities
Remedial Measures and improvement of Blackspot Blackspot ID KA 03 110 at Mayagondanahalli Village of Chainage Km 166.675 to Km 167.175 NH 73 Old NH 234 Mangalore Tumkur section in the State of Karnataka
Annual maintainance of NH-206 Kadur to NH-13 Holalkere via Hirenallur Yaraganahalli SH-153 at ch.22.00 to 24.30, Ch.25.00 to 30.50 and 31.50 to 42.80 km in Ajjampura Taluk, Chikamagalur District.
Improvement of the Connection road from NH-46 to Aladakatti village in Kalaghtagi taluk, Construction of CC Road from NH-46 to Basapur road in Bammigatti village limits of Kalaghatagi taluk of Dharwad District.
Periodical Renewal from Km.168.70 to Km.181.30 of NH-167 Hagari Jadcherla section in the state of Karnataka(Job No NH-167-KNT-2019-20-25)
Annual Maintenance of SH 174 AROHALLI NH 948 TO MALLANKUPPE GATE SH 33
Widening to two lane with paved Shoulders from Km 40.0 to Km 75.0 Existing chainages of Mangalore Tumkur section of NH 73 in KNT on EPC Mode Job No NH-73-KNT-2021-22-945
Improvements to road from NH-75 to Yalduru via Nalluru, Agrahara, Hanumanahalli, Vaniganahalli, Krishnagiri, Bestarahalli, NH-234, Kuthandahalli, Koladevi, Agara, Challapalli at Ch 4.90 to 7.64 Km at selected reaches in Mulbagal Taluk/Call-3
Annual maintenance of Road from BB Road old NH-7 to join NH-234 via Agalagurki, Srirampura, Thowdanahalli, Kondenahalli, Mannarapura from Ch 0.00km to 7.00km and 13.202km to 16.10km in Chikkaballapur Taluk & District. (Others Category)
Maintenance 1st year old Plantation at Vijayapur IB to Telasang Athani Taluk Border 7.60 Km, Siddapur Vijayapur NH-561, 7.10 Km & Water tank to solapur NH 50 and Vijayapur city, 3 Km during 2026-27
Maintenance of 2nd year of Plantation in Roadside (NH-948 old NH-209) (including maintenance of 14x20-220 Seedlings and Raising of 14x20 -20 Seedlings) at Honniganahalli to Maaranadoddi in Sathanur Range during 2026-27
HRC fuse link, 25 Ampere, rated Voltage 1000 V AC, minimum breaking capacity 25 kA, , Type NH Knife ( DIN type), size NH 000M, Characteristic gB confirming to IS- 13703-1993 suitable for LHB type coac
Widening to Two Lane with Paved Shoulder from Km 105.00 to 110.838 of NH 544DD Anantpur Molkalmuru section in the State of Karnataka on EPC Basis Contract. Job no. NH 544DD KNT 2020 21 922
Consultancy services for feasibility study detailed project report survey and preparation of land plan for Widening of existing 2 lane to 2 lane with paved shoulder from Km 64 to 90 of NH 52 Yellapur to Sangatigikoppa on ankola Gooty section in KNT
Providing Pavement Quality Concrete to the Road from NH-66 to towards Baikampady Industrial area
Painting of the non-residential buildings of East of NH 66 for the year 2025
Improvement of Belur road to NH-04 Link road in Dharwad taluk of Dharwad District
Replacement of street lights fittings at NH-66 Road from Kulur junction to Baikampady Bridge
Construction of Asphalt road from NH 4 to Fort at Kakati Village in Belagavi Taluka
Drain development work near NH at Alagudu in T Narasipura TMC Limit under General fund
Annual Maintenance of A) Kavadigarahatti to (NH-369) Dhalavayihalli (NH-369) cross road via Echanagenahalli - Chikkapura Gollarahatti - Hosahalli - Manangi - Kallihatti road from Ch 0.00 to 14.40 Km in Chitradurga Taluk B) Seebara to (Old NH-48) Kadleguddu via Guttinadu - Chikkapura - Kyasapura - Kodagavalli -Hunasekatte road from Ch 0.00 to 4.10 and 8.113 to 11.96 Km in Chitradurga Taluk
Raising of Roadside plantation during 2026-27 Anubhav Mantap Via Khanapur- NH-65- 4.00 Kms , NH-65 via Yerbagh to Sadalapur- 3.00 kms, Atalapur to Gundoor- 3.00 kms, NH-65 Via Sastapur to Atalapur- 3.00 kms, Mudbi Dhari Via Hanmanthwadi to Khanapur- 3.00 kms sadalapur to Lingadali- 3.00 kms, Ilhal to Manthal- 3.00 kms at Basavakalyan Range KKRDB Scheme
Annual Maintenance of Highway connecting Basavarajapura (on SH-47) to Tangali (on NH-69) via Honnavalli, Hirebidare (on NH-73), Pannasamudra, Thalalur, (on SH-7) Haranahalli, (on SH-102) Undiganalu, Javagal (on NH-73) Dharmapura, Jodilingadahalli, Nidaghatta, Melalli, Ballekere (SH-255) Ch 13.950 to 20.950 km year of 2025-26 in Tiptur Taluk(Ch 0.00 to 20.950 km)
SH-297, Hunsur (NH-275) to Periyapatna (NH-275) connecting road via Nilavagilu, Ramenahalli, Honnenahalli, Hanagodu, Panchavalli (SH-90), Satyagal Concrete drain construction work in selected reaches (Panchavalli and Satyagal village limits) in Periyapatna Taluk.-SC
Annual Maintenance of NH-69 to Mutta Gundabal-Herebail-Hosgod km.0.00 to 10.00 Road & NH-69 to Gandibail Jankadakal km.0.00 to 16.00 Road in Honavar Taluk Uttar Kannada District. for the year 2025-26.
Improvements To Road From Highway Connecting NH 766 Via Basavanapura Hulimavu Hadinaru Ayarahalli Devalapura Hosahundi To Join NH 766 From Ch 17 300 To 27 30 km SH 210 Job No CRIF KNT 2023 24 273
Construction of Srinivasapura Bypass from existing Km 453 890 Design Ch 0 000 to existing Km 461 450 Design Ch 10 080 on NH 69 in the State of Karnataka Under NH O on EPC mode
Maintenance of 1st year of Plantation in Roadside (NH-948 old NH-209) (including maintenance of 14x20-220 Seedlings and Raising of 14x20 -20 Seedlings) at Kanchugaranahalli to Thattikere (KRDC) in Kanakapura Range during 2025-26
Work of shifting feeder main from Suryanagar phase-1 to Phase-3 to facilitate the NH authority to take up the work of Trumpet interchange location from chainage 25 plus 800Kms to 27.00KmsRHS of NH 44
Maintenance of 2nd year of Plantation in Roadside (NH-948 old NH-209) (including maintenance of 14x20-220 Seedlings and Raising of 14x20 -20 Seedlings) at Kanchugaranahalli to Thattikere (KRDC) in Kanakapura Range during 2026-27
IMPROVEMENTS TO HALEGONDABAL TO NH-63 VIA HOSAGONDABAL-CHIKKASINDHOGI-GUNNALLI-HORATATNAL-MANGALAPUR (CHIKKASINDHOGI TO NH-63 VIA GUNNALLI-HORATATNAL-MANGALAPUR) ROAD FROM KM 1.50 TO KM 5.50(Working Chainage Km 0.00 to Km 5.50) IN KOPPAL TALUKA AND KOPPAL CONSTITUENCY.
Improvements works within the Honnakumaranahalli village limits on the Tiptur-Dudda-Hassan (SH-71) road and road development and shoulder widening works on the following stretches at Chainage Km 181.75 and 183.50 on the Kengal to Alur via ... ( NH -275), ... ( NH -251), ... ( NH -257), ... ( NH -251) ... ( NH -255) ...
Periodic and Routine Maintenance and Engineering Improvement of Davanagere Haveri Section of NH 48 (Old NH 4) for Project Highway between Km. 260.000 (New Km. 262.200) to Km. 338.923 (New Km. 341.123) in the state of Karnataka
Consultancy services for, Preparation of Feasibility/DPR for Construction of ROBs at LC 79 (Kumsi), LC 110 (Hossur) and LC 152 (Talaguppa) of NH 206 and LC 105 (Anandapura) of NH 766C in the State of Karnataka
Improvements road from Dharwad cross (near Dastikoppa ) to Dharwad (near Nuggikeri ) for a length of 28 Kms SH-1 connecting NH-63 and NH-48 in Kalaghatagi/ Dharwad taluka Dharwad ( Job No CRIF-KNT-2023-24-295)
Maintainance of Road from Road from NH-7 (Ambience daba)to join NH-4 (Makali) via Gantiganahalli, Nagenahalli, Mavallipura, Doddabyaladkere, Tarabanahalli, Aluru and K.A.C.A Cricket Studium. From ch 10.20 to12.90 & 17.60to 22.00 km .( Ch 0.00 to 28.00km)
Construction of Road at 1) Honnavar Town Ramatheertha Cross to Rama shetty compound, 2) Honnavar Town National Highway to Suvidha Hoapital Road 3) Honnavar Town ward no 4 Bandehalla Joseph Gonslvies house to Ganesh Measta house Road, 4) Honnavar Town St.Thomas high school Road 5) Honnavar Town Lakshmi Narayan Nagar Road 6) Honnavar Town Murukatte Flour Mill Road 7) Honnavar Town Bazar Road 8) Honnavar Town Bandehalla sarficenter Road.
PROVINDING OF VEHICLES ALONG WITH DRIVER ON HIRE BASIS TO NH SUB DIVISION BELAGAVI AND KARWAR
Road development from Tumkur Tal. Kora Hobli NH-4 main road to Kattigenahalli, Kattigenahalli Cross(SC)
DEVELPOPMENT OF NEW OFFICE BUILDING CONNECTING ROAD FROM ARABHAVI CHALLAKERI AND HUBLI SOLLPUR NH AT NARAGUND
Construction of CC Road from NH-4 APMC to SSP Acedamy School at Sira CMC Limit.
Annual maintenance BB Road(old NH-07)(Ch 511.20km to 514.09km) in Chikkaballapur Taluk & District.(OTHERS)