Loading…
Loading…
2,187 results • Best match
Annual Maintenance of road from NH-206 near KMF Dairy to Join NH-13 near Pillangere Via Jayanthigrama, Honnavile (MDR) from Ch. 0.00 to 6.80 & 7.20 to 12.20 Km in Shivamogga for the year 2025-26.
Rising of Median Plantation on New Mangalore Port Operation and Routine maintenance for development of New Mangalore Port road connectivity for the stretch from Surathkal to Nanthoor on NH 66 and BC Road to Padil on NH 73
Execution of Bituminous Overlay Works under Periodic Maintenance at Identified Locations from Km. 260.000 (New Km. 262.200) to Km. 338.923 (New Km. 341.123) of Davanagere Haveri section on NH 48 (Old NH 4) in the State of Karnataka
Short Term rectification of MoRTH identified Blackspots and Accident Spots by installing Pedestrian Guard rails in 12 locations the project Surathkal to Nanthoor on NH-66 and Nanthoor to Kannur on NH 73 within Mangalore City Corporation limits
Annual maintenance of from NH-150(A) Nagasamudra Cross (SH-19 Srirangapattana - Jevaragi Road has been upgraded to NH-150(A) )to Huchangiduraga Road Via Nagasamudra From Km 0.00 to 3.29 and 3.95 to 7.46 in Molakalmuru taluk
PERIODIC RENEWALS TO ROAD FROM 1)HOSADIMBADAHALLI TO T-11, 2) GOVINDAPURA TO T-07, 3) KEMBLIGANAHALLI TO NH-4(NH-75) 4) VALAGEREPURA TO T-09 IN HOSAKOTE CONSTITUENCY, BENGALURU RURAL DISTRICT (Package Number - KNMR-02-06)
Annual Maintanance of Shira-Nanjangudu road join 38th Km of NH-48 Dudda road to join 38th KM of NH 48-dudda Road from Ch.0.00 to 12.75 Km in Selected reaches For 2025-26 in Mandya taluk.
Annual maintanance of 1) NH-66 to SC/ST Hostel Road from Km. 0.00 to 0.80, 2)Link road NH-66 to Bogribail Road from Km. 0.00 to 8.00, 3)Belekeri-Hennajji Road from Km. 0.00 to 0.88 4)NH-66 to Vakkalabelese Road from Km. 0.00 to 5.12 in Ankola taluka Uttara kannada Distc. Under 2025-26 Road Maintanance.
Annual maintenance of Link road NH-66 to Harwada Railway Station Road from Km. 0.00 to 0.40, 2)NH-52 to Makkigadde Marugadde Road from Km. 0.00 to 8.00, 3)NH-66 to Ankola Railway station Road from Km. 0.00 to 1.10 4)Manjaguni Taribagilu Kelagina Manjaguni Road Km 0.00 to 3.00 in Ankola taluka Uttara kannada Distc. Under 2025-26 Road Maintanance
Improvements to Kengal to Alur via NH 275 Kanwa, Daswara, Makali Ujjani, Hitlapur, Hiliyuru Durga, K. Honnamachanahalli, Kilara, Hanchipura, Paduvagere, Hanumapur, SH-84 Kodavatti, Yediyur, NH 150A, Bochahihalli, Talakere, Aralikere Palya, ... Vishwanathpur, NH 150A, ...
Annual Maintenance of SH-188 Magadi to Cheluru (SH-84) Via Agalakote Handpost (SH-85) Bettahalli, Anchihalli (NH-75) Koteningaiahnapalya, Kunigal Kottagere, Madikehalli, Seegehalli, Murikuppe, shettigondanahalli (SH-84) Manichenduru, Mayasandra, ... (on NH -150A) ... (on NH -73) ...
Annual Maintenance of 1) NH-169 To Mahishi-Balagar Road chainage of 0.00 to 10.20 KM, 2) Maluru-Udayapura Road chainage of 0.00 to 4.00 KM , 3) Kannangi-Maluru Road chainage of 0.00 to 9.00 KM , 4) Tuduru-Doddamane-Shankarapura Road chainage of 0.00 ... Join NH 13 ... 6) NH -13, ... 8) NH -13 ... 9) NH -169 ...
Consultancy Services for Feasibility Study Detailed Project Report (DPR), Survey and Preparation of Land Plan for Widening to Four Lane with paved shoulder from Km 292.200 to Km 343.800(Sira- Byrenahalli section) of NH-69 (Old NH-234)
CONSTRUCTION OF NEW A SITE RO ON NH 75, FROM MAVANUR VILLAGE ( KASABA HOBLI, ALUR TALUK) TO NERALAKERE VILLAGE ( KASABA HOBLI, ALUR TALUK), SY NO-92/1,YADURU VILLAGE, ALUR TALUK, HASSAN DISTRICT UNDER MANGALORE DO OF KASO
Improvements to road from NH-4 to Doddabele
Consultancy services for feasibility study detailed project report survey and preparation of land plan for Construction of New 4lane Bypass to Hubballi Dharwad cities connecting NH 218 Near Kusugal and NH 48 Near Narendra in the State of Karnataka
Permanent rectification of Accident Spot at Lingampally X Road for construction of VOP at Km 463.138 on MH KNT Border to Sangareddy Section of NH 65 Old NH 09 in the state of Karnataka and Telangana on EPC mode
Annual maintenance of Road from BB Road NH-7 to join NH-234 via Agalagurki,Srirampura,Towdanahalli,Kondenahalli,Mannarapura from Ch 0.00km to 7.30km and 13.622km to 14.80km in Chikkaballapur Taluk.( Ch 0.00km to 16.10km)(reserved for ST category)
Improvements to Road from NH-13 Chitrahalli Circle to Kolalu in selected Reaches in Holalkere Taluk(SH243)
Construction of Bus Shelter to the Public at Mallya Gate north side near NH-66-Re Tender
Annual Painting to non residential buildings of East side of NH 66 for the year 2020-21
SCRAPPING AND ALIGNMENT OF HMT -NH 26 LATHE CROSS AND LONG BED/MACHINE GUIDEWAYS AT PROTOTYPE SHOP
Improvements of metalling road from Nagasampige NH-50 to Bodanayakadinni Village KM 0.00-1.50 in Bagalkote Taluk
NH-150 Crossing of Water Supply Pipeline at CH-114.2 KM at Kadechur Industrial Area, Yadigiri District.
Restoration of damaged carriage way in selected stretches from Km 56.50 to75.00 of NH.73 MangaluruTumkur Section.
Widening of Road From NH-167 silo crossing to Settling tank at ash pond area at RTPS.
Raising of plantation at Tikota to Toravi road side NH 3KM during 2025-26. (Reserved for others)
Raising of Plantation at NH roadside Halagunaki to Dhulakhed under KFDF Flexi B. head during 2025-26
Maintenance of Bridge at ch.14.50km of Road from NH 212 to Join Biligere via Varuna Hosakote
Laying of 90mm dia. HDPE pipeline in Hulidewarwada and Ajjikatta NH beside Street in Ankola TMC limit.
Construction of Asphalt Road in Chandramouleshwar Badavane from NH-7 to Harini PG in Hunasamaranahalli TMC Limit.
Widening and Improvements Road from NH-50 to Hosahalli Bus Stand in Kudligi constituency of Vijayanagar district.
Repairs to NH-48 Guruvinalli via Malali road 0.00 to 5.25 km in Kundgol taluka District Dharwad
Development of Road From NH-75 to Ramasandra-Maluru Border in Kolar Taluk Kolar District/Call-2
Laying of pipe line work at road Aralimara to NH service road Anchepalya in CMC Madanayakanahalli Limits
Construction of bridge and road from NH-150A to kengaiahnahatti via Giriyammanahalli in challakere taluk, Chitradurga Dist.
Strengthening of road from Km 171 850 to Km 190 500 and Km 193 560 to Km 199 250 of NH 275 Bantwala Bengaluru section in the State of Karnataka Job No NH 275 KNT 2017 18 860 Balance Work
Annual Maintenance of Road from NH 173 Kamsagara gate to join Keresanthe road via Pattangere, Ballekere, R.G.Kopplu, NH 206 Bylubasappana Temple Madalu, Huligundi at ch 4.00 to 5.00 km 5.75 to 10.57 km 11.44 to 22.00 km in kadur taluk(ST)
A) Annual Maintenance of NH-206 to Mallikoppa near Tarikere-Mangalore road via Kesarukoppa from ch5.00 to 12.00 km in Tarikere Taluk B) Annual maintainance of NH-206 to Ganguru road from ch 0.00 to 2.00 km in Tarikere Taluk
Consultancy Service for Preparation of Detailed Project Report (DPR) for Construction of ROB in lieu of existing Level Crossing No. 110 at Km 340.640 (Sudha Cross) in Ballari City Limits on NH 63 (New NH 67) in the State of Karnataka
Widening to 2Lane with Paved shoulders from Km 494.450 to Km 505.540 of NH 234 Sangandhalli to AP Border in the State of Karnataka under Annual Plan 2021 22 on EPC Mode Job No. NH-234-KNT-2021-22-931
Construction of New Major Bridge at Km.175.610 and Minor Bridge at Km.170.969 of Four laning of Goa Karnataka Border to Kundapur section of NH 66 formerly NH 17 from Km. 93.700 to Km. 283.300 in the State of Karnataka.
Construction of Bridge at ch27.20 km inplace of low level causeway near alur village along the Major district road from NH-7 to connect NH-4 (Makali) via Gantiganahalli, Nagenahalli, Mavalipura Doddabyaladakere, Tarabanahalli, and KACA stadium in Bangalore North Taluk.
Maintainance of Road from Road from NH-7 (Ambience daba)to join NH-4 (Makali) via Gantiganahalli, Nagenahalli, Mavallipura, Doddabyaladkere, Tarabanahalli, Aluru and K.A.C.A Cricket Studium. From ch 10.20 to12.90 & 25.00 to 28.00 km .( Ch 0.00 to 28.00km) Bangalore Nort Taluk.
Improvements road and cc drain to road connecting from SH-94 to NH-206 via kyathasandra, chandramouleshwara layout, girinagara, sabarapalya and Road connecting from kyathasandra-belagumba MDR to NH-48 via devarayapatna new layout in tumkur taluk (one time improvement)
Improvements road and cc drain to road connecting from mydala -aregujjanahalli MDR to NH-48 via TVS layout, basaveshwara nagara and Road connecting from NH-206 to shettihalli main road via SIT layout, ss puram in tumkur taluk (one time improvement)
Construction of Road of 4m wide between metro median and Existing NHAI main carriageway along Hosur main road between Bommasandra and Central Silk Board in stretches between Metro Piers,RP616 to RP207 for a length of 5.244 km of R5 line of BMRCL,Ph-2
a)Annual Maintenance of Balakundi Tanda-Sankalapur-Chikkakodagali,-National Highway-50 MDR from km 0.00 to 6.60 and 10.50 to 12.00 of Hungund Taluk b)Annual Maintenance of Ilkal Nagur via Huchanur MDR from km 0.00 ro 3.30 and 11.00 to 11.50 in Hungund Taluk c)Annual Maintainence of Gorebal Hiresinganagutti MDR from km 0.00 to 3.60 in Hungund Taluk of Bagalkot District.Under 3054 MDR Maintenance for the year 2025-26(Reserve for SC)
Annual Maintenance of Nagamangala-Shravanabelagola Road to join SH 19 (NH 150A) Via Mulakatte-Arehalli in Nagamangala taluk.
Restoration of damaged carriage way in selected stretches from Km 40.00 to 56.00 of NH.73 MangaluruTumkur Section.