Loading…
Loading…
1,800 results • Best match
Chathannoor GP- Palavila NH supermarket parkmukku road side concrete
NH KELOTH AMBALAM KARIKOCHI ROAD CROSS DRAINAGE CONSTRUCTIONin Pullur Periya GP
PR (2019-20) FROM KM 291/000 TO KM 319/000 ON NH 66
Project No. 153/2025-26 -NH LIC mukku Road Retaring at Pariyaram GP ch from 0/000 to 0/350 km
LRRP-Local Road Restoration project 2024 2025 chathannoor LAC slno 1448 kottavathukkal ward NH -Aattuvaram paalamukku pulikkaran Nanma Road in chathannoor gp kollam district-
Premonsoon -2022-23- Monsoon precautionary work etc in NH 183 from CH 160.000to 172.700 and cutting over hanging branches etc from ch 160.00-172.700
Renovation of Thuruthi Stadium and retarring of NH SC smasanam road in Pappinissery GP
GENERAL-FDR 21- 22 Protection Works at NH 183 - Retaining Wall Construction at Pannikuzhy bridge approach ( 76/500) and Idinjillam (79/000) at NH 183-General Civil Work-1
GENERAL- Old NH HMT JN to South Kalamassery Road-Construction of Cross drain at TVS JN in Old NH HMT JN to South Kalamassery Road-General Civil Work-1
GENERAL-IMPROVEMENTS TO POOCHAKKAD MOSQUE NH PERIYA ROAD KM 5/000 TO 6/050IMPROVEMENTS TO POOCHAKKAD MOSQUE NH PERIYA ROAD KM 5/000 TO 6/050-General Civil Work
NH Al Ameen road metalling tarring in ward no 12
Cherakulam South towards NH road mettalling and tarring Ward 17
SR 2019-20 - Providing Drainage felicities in Old NH near Pyarry junction
Bridge Approach Road Maintenance in NH 744-Muruganpanchal Bridge and Kazhuthuruthy Bridge
LAC ADS -VANCHITHARA JUNCTION-NH AKG JUNCTION ROAD CONSTRUCTION IN OCHIRA GP
Pro no 181 24 Improvements to NH Arial Chola Kayal Paadam Road
DIVISION 33 PUNNAKKAL MADAM TO NH FOOTPATH CONCRETING IN KANNUR MUNICIPAL CORPORATION
KBP 215/2023-24 NH Mundangulam Kadav Thod side protection Chengala GP
Construction of cross drain at NH Pazhayangadi beach road in ward 17
Karivellur Peralam GP-PRJ.NO.78/24-NH Chedikkunnu kuniyan Kizhakkekara Road Retarring
Nileshwram Municipality Project no. 391/2023-24 NH KARUVACHERI THOTTUMPURAM ROAD RETARRING
Karivellur Peralam GP-P.NO.212/24-Taring to NH palatherapalm colony road
Mararikulam South GP 227-20 - NH Kandathil Veli Road Concreting Ward 6
Pro no 81/24 Road Retarring From NH Alhana To Koikkal Mukku
Improvements to Old NH Vadakara from KM 0/000 to 3/000
pro no 172/24 Improvements of NH Maadappurakkal Road in ward 14
Chinnakkannan parambu NH road concreting in ward 9 of Punnapra North GP
Cheruthazham GP-PR.No.31/2020-21Ezhilode NH panamparambu SN school road taring
TVYR 327/24-25 MAINTENANCE TO VAZHAKKAPPILLIMUKKU- NH ROAD IN WARD 3
NLR MLTY 2025-26 PR.NO 169/26 NH PALLIKARA AMBALAM ROAD RENOVATION
PGP 291-25 MANJATHUR PUTHILOT MATTALAYI NH ROAD RETARRING IN PILICODE GP
PROJECT NO 324-NH CHERUVATH VISHNU KSHETHRAM ROAD RANDAM GHATTAM WARD 13
NH OLAYMKATTA VEERA NAGAR ADUKKA ROAD RE TARRING AND IMPROVEMENT MANGALPADI GP
Prj No 102/24-25- Construction of NH Kodiyattuchola Canal - Third Reach
GENERAL GTDMC Alappuzha Reconstruction of the compound wall dismantled in the course of National Highway 66 widening.General Civil Work
Annual Plan Renovations of Arayalkkal kshethram to NH road Project No 261 in Kaladi GP
O and M Water Supply Schemes TRIPUNITHURA MUNICIPALITY AMC WSS to Tripunithura Municipality and Adjoining Pts Northern side of NH 49 NH 85 for the year 2026 27 Pipeline Work
O and M Water Supply Schemes TRIPUNITHURA MUNICIPALITY AMC WSS to Tripunithura Municipality and Adjoining Pts Southern side of NH 49 NH 85 for the year 2026 27 Pipeline Work
GENERAL-Reconstruction of existing damaged culvert at Moozhikkal Km 9/620 of NH 766-Reconstruction of existing damaged culvert at Moozhikkal Km 9/620 of NH 766- General Civil Work
Deposit work NH Replacement of existing distribution line with 200 mm MS pipe PVC as part of culvert construction by NH authority at TB Junction Punalur and 40th mile Thenmala
GENERAL-Premonsoon work at NH 183 Reach 2-Premonsoon works of 2021 - 22 for NH 183 from perunna (81/600) to kottayam Ida junction (99/00)-General Civil Work-1
GENERAL-NH 183A - Monsoon Precautionary work, Jungle clearance, side drain clearance, painting and cutting of overhanging branches etc,. From ch 89/100 to 103/200-2022-23
Strengthening and geometric improvements from Km 25.000 to 45.000 of NH 766
Construction of High Level Bridge over Cheruthoni River at 32/500 on NH-185 in the State of Kerala on EPC Mode
Project No. 154/2025-26-Pariyaram NH Vettakkorumakan Kshethram Road Retaring in Pariyaram GP ch from 0/010 to 0/260 km
Providing pothole filliing usingWMM and BM and patchwork repairs using BC
Construction of RETAINING WALL Km 185 200 RHS in NH 183 and irish drain
Strengthening and Geometric Improvements from km 25/000 to 45/000 of NH 766
Black Spots-Rectification of Black Spots on NH 766
24-25-NH SuperMarket-Palavila Parkmukku-Road side Concreting Retarring (ward I) in Chathannoor GP -CTNR 104/25