Loading…
Loading…
2,080 results • Best match
Development, Operation and Maintenance of Wayside amenities on Lease Basis (5 O-M Sites) (NH-752D/ Ujjain-Badnawar/29-050/ RHS/ Pipliyragho/MP)
Work of Emergent cleaning of Drain at Dinara, Raksha and Pali Village on 4-lane of Baran-Shivpuri-Jhansi section of NH-27
Restoration and Maintenance of road in km 90point 00 to 74point 00 of Mandlato Nainpur stretch on NH 543 Length 15point 00 Km
Construction of Cement Concrete Road at Khategaon NH Road to Khategaon City Approach Road Length 0.80 km with Electrification and Pole Shifting work
CONSTRUCTION OF AN RCC DRAIN INCLUDING COVERS IN WARD NO 12 EXTENDING FROM KAUSHAL PATEL HOUSE TO ROSHAN SEN HOUSE ALONG NH 30
Providing pitching, Embankment and damaged road portion or Culvert in between Km 51 plus 650 to 64 plus 500 on NH 752 B Rajasthan Border Dug road Second Call
B.T. Renewal Work in Different Roads under P.W.D sub division Khurai Langth 10.65 Km PAC 201.19 Lac ( Group-1) (1) Fourlane Road (NHAI) Barodiya Service Road 0.75 km Rs 17.52 Lakhs (2) MPEB Office to Fourlane (NHAI) Approach Road 0.70 km
Custom Bid for Services - Sanitation works of NH-III area Section-III of NTPC Vindhyachal for 2025-27 Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
BT Patch Repair on Left Portion of NH-7 at City Portion Manganwa and Raipur Karchuliyan Road Total Length 8.30 Km. Sub Division Manganwa
Repair of Kagpur Rapta Km 34/2 Johad Rapta Km 46/8 and Naren River Rapta Km 73/4 on NH.346(First Call)
PATCH REPAIR WORK ON MUNGAWALI TO BANGLA CHAURAHA ROAD NH 346 IN KM 150 TO 152 AND 154 TO 159 TOTAL 9 KM LENGTH
SHIFTING AND DISMANTALLING OF LT/11KV/33KV LINES CROSSING THE PATH OF THE OLD NH 26 FROM KRISHNA DHABA KARELI TO BARMAN ROAD KARELI
PATCH REPAIR WORK OF SAWAI MADHOPUR (PALI) TO SHEOPUR ROAD NH-552 (Ext.) CITY PORTION SHEOPUR KM 141 TO 143 TOTAL LENGTH 3.00 KM
Construction of Storm water drain from Jain petrol pump to NH-7 culvert via Punjabi Dhaba at Katni Tiraha in Ward no. 05 Maihar
Cons of RCC Drain NH 752B to Sahu kirana and Mr. Mahesh Sharma to Mrs. Sushma Bhargava house at aawas colony ward no 02
Construction of Haidargarh to Mragnnath Dham road length 2.20 km. and NH-146 Bagrod to Vijaypur road length 3.00 km. total length 5.20 km.
Construction of Storm water drain from Jain petrol pump to NH-7 culvert via Punjabi Dhaba at Katni Tiraha in Ward no. 05 Maihar
ERECTION OF POLES WITH STREET LIGHT FROM CENTRAL VERGE MANGAL BHAVAN WARD NO. 04 TO MAHENDRA PANDEY HOUSE WARD NO. 03 AT NH 43
(Kayakalp) Construction of BT Road at Gram Sirol Tiraha to NH 44 Rayaru Dabara Bypass Road by Radhe Indane Gas.File No.03/24X3/5.
Construction of Lateri Maksudangad road (NH 752 B) to Badi Madagan Main Temple Tak Approach road Tehsil Lateri District Vidisha (MP) Length 0.70 Km.
PROVIDING AND FIXING OF TYPE A, W METAL BEAM CRASH BARRIER ON NH 346 DINARA TO PICHHORE ON 0 TO 45 LENGTH 45.00 KM
REPAIR OF ROAD WORK FROM KM 46/400 TO 46/1000 ON NH135B SIRMOUR DABHOURA ROAD ( BARDAHA GHAT PORTION ) UNDER NH SUB DN REWA
Carrying out long term measure for Rectification of Blackspot on Rehti Tiraha in km. 27.200 of NH-146B in the State of Madhya Pradesh
DEVELOPMENT OF NEW A SITE RETAIL OUTLET FROM BAVLA TO BHAYALA ON RHS ON NH-47 UNDER AHMEDABAD DIVISIONAL OFFICE OF GUJARAT STATE OFFICE.
Rectification of Identified Black Spot on Black Spot on 3A (b) Patra Kisan Dhaba, Badwara Dist. Katni, Katni - Umariya-Shahdol(NH-43), Madhya Pradesh
B.T. Renewal (59.380 Km), including Korebandi, Road Marking and Safety Measures on Jabalpur-Damoh Road SH-37 (New NH-55) Total Length 101.286 Km
REPAIR OF ROAD WORK FROM KM 47/200 TO 47/800 ON NH135B SIRMOUR DABHOURA ROAD (BARDAHA GHAT PORTION ) UNDER NH SUB DN REWA
Construction of C.C. Road from Mandi Chouraha to NH 45 via Bijli Office in Ward No. 08, Nagar Parishad, Tendukheda Under C.M. Vishesh Nidhi
Construction of Nala, Pavers and Road Repairing at NH-75 Pandit Deendayal Park via Ramakrisha College in Ward No 06 and 07 (IInd Call)
Construction of Storm water drain from Jain petrol pump to NH-7 culvert via Punjabi Dhaba at Katni Tiraha in Ward no. 05 Maihar
One time Improvement of Existing Link Road on NH-135 Mauganj town Portion From Km 167.700 to 174.300 in the State of Madhya Pradesh
B.T. PATCH REPAIR WITH W.M.M., B.M, AND M.S.S. AND REPAIR OF SHOULDER IN KM 1 TO KM 35 ON SENDHWA KHETIYA ROAD (NH 752G)
Procurement of critical spares for M/s ELGI make Air Compressors (Model No. NH-295-9) installed in 2X600 MW at SSTPP, MPPGCL, Dongalia
TENDER FOR CONSTRUCTION OF NEW RETAIL OUTLET AT KHASRA NO- 103/4/2 , BILAPURA VILLAGE, PACHORE TALUK, RAJGARH DISTRICT ON NH 52(BHOPAL TERRITORY)
REPAIR OF SHOULDERS ON TONK-PALI-SHEOPUR-GORAS-SHYAMPUR-SABALGARH-CHIRGAON ROAD NH-552 (EXT.) IN KM 116 TO 172 TOTAL LENGTH 67.00 KM
PROVIDING AND FIXING OF TYPE A, W METAL BEAM CRASH BARRIER ON NH 346 PICHHORE TO CHANDERI KM 99 TO 140 TOTAL LENGTH 41 KM
Repair of Culverts Guard wall Fixing of Km Stone and crasher barrier on Gulganj Amangang Pawai Katni Road NH 43 Extn Km 1 to 76
SEALING OF CRACKS WITH EPOXY GROUT AND GUNITING CONSTE FOR BRIDGES IN KM 85/6 AND 76/4 ON NH-346 DINARA TO CHANDERI ROAD
B.T. Renewal Work on Old NH 146 Vidisha City in Km. 69 to 71 on Bhopal Sagar Road length 3.00 Km. PAC Rs. 74.31 Lacs
Construction of Transferred NH-7 From KM 361/2 to 363/2 and 377/10 to 378/10 inside city portion road length 2.90 KM.
CONSTRUCTION OF C.C. ROAD, DIVIDER AND STREET LIGHT AT NH-59 FROM MANDI GATE TO SHRI SAI SAMARTH PHOTOCOPY CENTERE UNDER CM INFRASTRUCTURE PHASE III
PROVIDING AND FIXING OF TYPE A AND W METAL BEAM CRASH BARRIER ON NH-346 DINARA TO CHANDERI KM 101.00 TO 150.00 LENGTH 520 MTR.
PROVIDING AND FIXING OF TYPE A, W METAL BEAM CRASH BARRIER ON NH 346 PICHHORE TO CHANDERI KM 46 TO 98 TOTAL LENGTH 52 KM
Upgradation and renewal of B.T. road including Divider NH-78 Anuppur Kotma approch road by pass pertion of Kotma road to Baskhali Chouraha Length 7.50mtr
REPAIR AND CONSTRUCTION OF HARD SHOULDERS IN KM. 19 TO 31 AND KM. 36 TO 48 IN AMBUA-DAHOD ROAD NH-56 LENGTH 24000.00 MTR
B.T. PATCH REPAIR WITH W.M.M., B.M, AND M.S.S. AND REPAIR OF SHOULDER IN KM 36 TO KM 56/6 ON SENDHWA KHETIYA ROAD (NH 752G)
PATCH REPAIR WITH W.M.M., B.M., AND M.S.S. IN KM 2/2 TO KM 2/8 OF BURHANPUR LONI ROAD (NH 347C) UNDER FDR SECOND CALL
PATCH REPAIR WORK ON SAWAI MADHOPUR PALI SHEOPUR ROAD NH-552 EXT. KM 129 TO 135 AND KM 138 TO 140 TOTAL LENGTH 10 KM
PATCH REPAIR WITH W.M.M., B.M., AND M.S.S. IN KM 1/2 TO KM 1/10 OF BURHANPUR LONI ROAD (NH 347C) UNDER FDR SECOND CALL
Annual maintenance contract for Availing expert services from Ms Elgi make air compressors NH 295 installed in Phase I 2X600 MW units at SSTPP Dongalia