Loading…
Loading…
7,193 results • Best match
Improvement to Bembali Umergavan Patoda Lohara Narangwadi Road SH-237 Km 33/800 to 41/900 Part Taluka Border to Petsangvi and 43/900 to 45/100 Part- Narangawadi sub station MSEB to NH-548B Tq. Omerga Dist. Osmanabad Omerga Dist. Osmanabad
Construction of Malegaon Bypass Road on Kusumba Malegaon section starting at Km. 89.135 of NH-160H to two lane with pave shoulder Configuration from Ch. 0.00 to Ch. 7.840 Design Ch. 7.450 Connecting Dondaicha Kusumba Dongrale Malegaon Road NH160H and
From Taluka Border to Nandane and Sayane to Deobhane and upto Dhamani to Biladi and Arni to Ambode upto Mukti road (Construction of Concrete road to Nandane(District Border) Sayane Devbhane NH-3 Dhamane Biladi Nimkhedi Aarni Vani Malane Ambode Nandan
From Nandale Bk. To Dist Border Road (Tal. Dhule) (Construction of Minor bridge with bothside approaches on Nashik Dist.Border to Nandale Tarwade NH-211 Chande to Kunzar to Jalgaon Dist. Border road MDR-25 Km.16/750 Near Chande Village Tal.Dist.Dhule
Annual Maintenance for One Year on NH-211 Vihamandva Navgaon Apegaon Mahartakali Chaklamba Nimgaon Arvi Padali on SH-59 to Raimoha Patoda Road SH-62 Km. 36/00 to 54/00 and 60/00 to 69/500 Tq. Shirur (K.) Dist.Beed
Repairs and one year maintenance of Chincholi B Manjri MDR 12 (Chikhurda) MDR 9 to Sakhara NH 63 to Ankoli MDR 11 Shiur Takli Uti Dhanora Takali Shi. MDR 94 Km.0/00 to 8/00 Tq. and District Latur.
TWO YEAR MAINTENANCE AND REPAIRS OF FROM N.H.353(J) PARDI S.H.336 WATHODA S.H.349 SAWALI (KH) WADHONA (BH) DHAPEWADA NH 543 E- BHANDANGI DHURKHEDA BORGAON TO BELLORI ROAD KM.0/000 TO 28/100 IN TALUKA KALMESHWAR AND DIST.NAGPUR
One Year Annual Maintenance to NH-161 Honwadaj Jambhali Yeoti Wasur ldgyal Gonegaon SH-410 SH-410 km.0/00 to 27/00 (Actual Km. 10/00 to 17/00 and 19/00 to 31/00) Tq Mukhed Dist. Nanded
O.R. 2020-21 Road safety measures in km 60.400 to Km 63.400 on NH - 965 DD Lonand and connecting Andori, Shirwal. Bhor, Ati, Mahad, Mandangad, Pachral (with connection to birth place of Baba Saheb Ambedkar) Road in Raigad district.(IInd call)
1)SR to NH-6 to Sakri Jadgaon Fulgaon Aanjansonda Nibhora Hatnur Road Km 2.000 to 12.000 MDR-115 (2) SR to Kandari Khadka Kanhale Kh. Manyarkheda Talwel Ozerkheda Malegaon Road MDR-112 Km 1.500 to 22.500 Tal.Bhusawal (Second Call)
Imp. to road MDR 51- SH 222 (Matergaon), Belura, Morgaon, Pahurjira,NH-6 Parkhed, to Join MDR-13 in Km.19/00 to 28/00 ( Part Parkhed to Rahud to Ghanegaon) with construction of slab drain Tq.Khamgaon Dist.Buldhana. (2nd Call)
One year Maintenance of Road Starting From SH 188 To Madilage Phata Uttur Mumewadi Bahirewad To NH 4 Road up to state border SH 198 KM 0/0 to 9/200, 12/500 to 18/365 Tal-Ajara, Dist-Kolhapur.
Construction of CD work and improvement of NH-6 to Juni Tamaswadi road ODR-66 K.M. 32/00 to 33/00 and Inprovement of SH-12 Balsane to Kadhare road ODR-66 K.M. 8/00 to 9/00 Tal.Sakri Dist.Dhule
Improvement S.T.B.T Widening on Adyal Hatti lendha Dudhwahi to NH-353 D to Khed kahali Khandala Nanhori Dighori Belgaon Deulgaon Kolari Road MDR-123 in Km 16/500 to 21/00 (From Village Nanhori,Dighori to Tapal ) Tah Bramhapuri Distt Chandrapur
Request for Proposal (“RFP”) issued by NHIT Western Projects Private Limited (NSPPL) for Engagement of Agency/Firm for Initial Improvement works of Borkhedi – Wadner – Deodhari – Kelapur Project (A four-lane road section of NH-44) in the state of Maharashtra
Repairs and Maintainance for One Year to NH 166 E to Nisare Marul Gudhe Kalgaon Bhurbhushi road MDR-54 Km.0/00 to 8/500 18/00 to 20/00 and 22/00 to 35/350 Tal-Patan Dist-Satara.
Annual Maintenance for One Year on NH-211 Vihamandva Navgaon Apegaon Mahartakali Chaklamba Nimgaon Arvi Padali on SH-59 Raimoha Patoda Road SH-62 Km. 36/00 to 54/00 and 63/00 to 69/500 Tq. Shirur (K.) Dist.Beed
ANNUAL MAINTAINANCE CONTRACT OF CHAPEGADI BHAMEWADA WADODA TO NH-6 TO SONEGAON NERI GADA NERI GADA PAWANGAON KALMNA TO SH-341 ROAD (MDR33) KM 14/000 TO 22/000 and 25/500 TO 41/00 IN TAHASIL KAMPTEE DISTT. NAGPUR.
Consultancy services for Authoritys Engineer for Supervision of Construction of 4 Lane Flyover at Nagpur RTO Chowk To Nagpur University Campus and 4 lane flyover at Wadi/MIDC junction from on NH 53 In State Of Maharashtra On EPC Mode.
White Topping Concrete Road on Down Graded Part of NH-6 of Shivani to Neharu Park, Ashok Watika, Railway Station, City Kotwali, Balapur Naka, Bus Stand to City Kotwali Ridhora Naka, Asadgad to Washim Naka, Akola Mini Byepass, Manasgaon Nimba Nimkar
Improvements to Khadakjamb (NH-60) to Khadakozar gurhale Devergaon Hirapur Pate Koltek Kazisangavi Gangave Dugaon Kokankhede Nimon Kanadgaon to MSH 8 Road MDR 115 Km 12/600 to 15/300 and 20/100 to 21/900 Tal Chandwad Dist Nashik
Improvements to road with CD work to MDR-5 Rameshwar SH-236 Laman Tanda to MDR-13 to Chincholi (B) to MDR-9 to Ramegaon to NH-63 road, MDR-92, Km.0/400 to 5/500, Tq. and District Latur
Construction of Major Bridge across Godavari River at Dusalgaon Village at Km. 75.660 Design km. 29.040 and reconstruction of Minor Bridge across Irrigation Canal at Ch. 57.665 Design km 11.045 along Parbhani Gangakhed Road NH 752K in the state of MH
FLOOD DAMAGE REPAIR OF KUHI PANDEGAON CHAPEGADI CHIKNA BHAMEWADA WADODA NH6 SONEGAON NERI GADA SHIRPUR PAWANGAON KALMANA TO NH 341 (MDR 33) 32/00 TO 34/00, 34/00 TO 35/500, 35/500 TO 37/00 TALUKA KAMPTEE DIST.NAGPUR
Repairs to NH-211 to Dasegaon Dadpimpri Deoli Dondigar HIrapur Ganeshnagar to Patnadevi Road MDR-41 Km.0/00 to 0/500, 8/500 to 11/00, 18/600 to 22/00 and 25/450 to 26/00 Tal.Chalisgaon Dist.Jalgaon
Repairs to Road Start From NH 204 to Madale Sadale Kasarwadi Top NH4 to Sambhapur Tasgaon Kumbhoj Danoli Jaysingpur Railway Station to Join NSH 6 SH 199. Km 5/00 to 16/600 Tal. Karveer Dist. Kolhapur With One Year Maintanance
Short Term Maintenance contract (STMC) for maintenance of the section Sakoli Lakhandur Wadsa Armori from km 62.200 to 63.400, 69.00 to 71.00, 73.00 to 74.00 and 75.500 to 81.00 total length 9.70 km of NH-353C in the State of Maharashtra.
NH 9 to Indapur Akluj Sangola Jat Umrani road SH 125 Km 3/00 to 6/00 9/00 to 12/00 15/00 to 18/00 19/00 to 20/00 21/00 to 24/00 Tal Indapur Dist Pune
O.R. 2020-21 Road safety measures in km 63.400 to Km 66.400 on NH - 965 DD Lonand and connecting Andori, Shirwal. Bhor, Ati, Mahad, Mandangad, Pachral (with connection to birth place of Baba Saheb Ambedkar) Road in Raigad district. (IInd call)
REPAIRS TO DISTRICT BORDER EKTUNI THAPTI TANDA NH 211 PARUNDI BALANAGAR TO MDR36 ROAD KM 37 KM 0.00 TO 25.00 AND SH26DHORKIN KAPUSWADI BALANAGAR KHADGAON TO SH 61 ROAD MDR36 KM 0.00 TO 3.00 AND 8.00 TO 11.00 TQ. PAITHAN
Construction and improvement of concrete road with required Gutter, retening wall at Amne titwala Ghotsai to NH-222 to Dahagaon Dapivali Yeranjad to Badlapur Road MDR-49 in in ch Km 7/500 to 8/000 at Taluka Kalyan Dist Thane
Constructing Concrete Road and Gutter on NH-752 G to S.H.5 to Samsherpur Vikhran Junmohide Hol Nimbhel Kandre Bhadvad Baldane Zirve to S.H.6 Road MDR-47 km. 0/00 to 0/350 Tal. Dist. Nandurbar (Width 7.00 Meter)
Improvement to SH 251 Dhawari Therban Somthana Kini Palaj Divashi Laglood NH-222 Turathi Bothi Bitnal Somthana Gortha Jamgaon Kudala Bolsa Bhayegaon Antargaon Sawarkheda Kushnur Road SH-419 km 22/200 to 26/200 Tal.Bhokar and Dist.Nanded (KINI TO GHAT
EPC PN-II(19A) - Improvement to Akkalkot Jeur Karajagi Mangrul Tadval Korsegaon Barur to Join NH-52 Takali Road SH 211Km.176/500 to Km.221/500 (PMIS Km.205/220 to 250/220) Tal.Akkalkot and South Solapur on EPC mode
Tree Plantation and Maintenance (Nurturing Trees For 3 Years) 1) Anjangaon Kakda Rasegaon Yevta Sahur Shirala Yawli Dawargaon Kapustalni Mozari Varha Kurha Road SH-308 2) Riddhapur Belora Chincholi Kale Devri Nandgaon Peth Road MDR-28 3) NH-6 to Tale
White Topping Concrete Road on Down Graded Part of NH-6 of Shivani to Neharu Park, Ashok Watika, Railway Station, City Kotwali, Balapur Naka, Bus Stand to City Kotwali Ridhora Naka, Asadgad to Washim Naka, Akola Mini Byepass, Manasgaon Nimba Nimkar
Strengthening of existing carriageway in C.B.Petrol Pump to Nandurbar Muncipal Limit and WakacharAnturlito Hatodasection of NH-753B from Km 57/00 to Km 58/500 and Km 69/700 to Km 74/600 in the State of Maharashtra under EPC mode
One Year Maintanance and Repairs to Kopargaon -Rahuri-Nagar-Karmala Raod MSH-8 Km (NH-516 A) 376-310 to 456-910 ( km 0-0 to 80-600 ) ( Bad patches Km.51-400 to 52-700), Tal. Karjat SECOND CALL
Widening and strengthening of NH 353C from km 227/00 to km 243/00 Total km 16.00 Chodampalli to Guddigudam section of Sakoli - Wadsa - Armori - Gadchiroli - Ashti - Allapalli - Sironch Road in Gadchiroli District in the State of Maharashtra on EPC Mo
PROVIDING ANNUAL MAINTENANCE TO NH-6 TO THANA NIHARWANI KHAT PIMPALGAON MURMADI TO WAIGAON KHIDKI DHANOLI WAGHBODI KATHALABODI AADEGAON ROAD MDR 28 KM. 0/000 TO 32/200 (Tackled Length 17/00 to 33/00) IN TAH. MOUDA DIST NAGPUR
Construction of concreting road and Gutter and Widening to NH-6 to Talvel Pimpalgaon Bk. Junone Digar Aamadgaon Nadgaon Kolhadi Shirsale Ruikheda Taroda Chikhali Road MDR-25 Km 3/600 to 5/300. (Talvel to Pimpalgaon Bk.) Tal- Bhusawal Dist-Jalgaon
Consultancy services for Authoritys Engineer for supervision of Rehabilitation and Upgradation to four lane with paved shoulder configuration from km 24-350 to km 61-875 (Jawale - Borgaon Kale) of NH-63 in the State of Maharashtra on EPC mode.
Strengthening to Balaghat Gondia Amgaon Deori Korchi Road NH 543 in the km 25.985 to 28.025 , 33.130 to 35.088 , 40.475 to 42.625 (Deign Chainage 54.840 to 52.800 , 47.695 to 45.737 , 40.350 to 38.200) in the state of Maharashtra on Engineering, Pro
Upgradation of the section from Sironcha to Major Bridge across Godavari River from Design Chainage km 321.000 to Km322.700 and Km 323.500 to Km 327.00 (Length 5.20 Km) of NH-353C Section of Sakoli Wadsa Armori Gadchiroli Ashti Alapalli Sironcha Road
Improvements to MSH-6 to Kakramba Honala Wadgaon Salgara Killaj Horti Murta NH-65 Jalkot Hangarga Borgaon Salara Maddi Achler Belamb Kothali Khasgi Diggi To State border Road MDR-37 Km. 25/800 Tq.Tuljapur Dist.Osmanabad (Under Flood Damage Repairs Ye
A) BEAUTIFICATION OF SHRI DATTA MANDIR CHAUK AT DUMBARWADI , TAL JUNNAR, DIST PUNE B) CONSTRUCTION OF ROAD FROM NH-61 TO ASWAR VASTI TO SOMANATH MANDIR ROAD AT DUMBARWADI , TAL JUNNAR, DIST PUNE. C) CONSTRUCTION OF SABHAGRUH FOR SHRI DATTA MANDIR
FDR To Talere-Gaganbavda Road NH-166G from km 7/800 to 17/390, 19/300 to 20/200, 21/770 to 22/460, 25/440 to 26/200, 26/200 to 26.615, Repairs to damaged carriage way (in stretches)
Ordinary Repairs to Nagpur Katol road at KM 2.400 to 7.200 7.200 to 9.000 10.000 to 10.600, 13.00 to 15.00, 17.00 to 22.00, 27.00 to 31.00, 37.00 to 39.00 and 40.00 to 47.00 NH 353J in the State of Maharashtra
ANNUAL MAINTENANCE TO NH-259 TO EKAMBA SHELLOD SHIRPALLY DOLARI PALASPUR HIMAYATNAGAR PARDI EKDARI WASHI WITH C.D. MDR-108 KM 0/00 TO 32/00 (0/00 TO 5/00 AND 26/00 TO 29/250) TQ. HIMAYATNAGAR DIST. NANDED
Improvement with C.D. work and Minor Bridges to State Border to Bannali Dharmabad Siraskhod Manur Sangam Hungunda Nagni Machnoor Yesgi upto NH-63 of SH-420 (Previously MDR-41) Ch 26/00 to 30/00 (Part- Nagani to Ganjgaon Balance Length)