Loading…
Loading…
7,188 results • Best match
Consultancy Services for Authoritys Engineer for Supervision of Development and Maintenance of Inter Modal Station at Ajni Railway Station Nagpur in the State of Maharashtra on EPC mode.
CS for AE for Supervision of Const. of 07 Nos of Standalone safety struct works at different locations on various NHs in Maharashtra on EPC Mode
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI MUMBAI EXPRESSWAY IN JHABUA VADODARA SECTION ON LEASE BASIS
CS for Preparation of Feasibility Study for Development of MMLP and Detailed Project Report for external trunk connectivity infrastructure to the MMLP Site at Nashik and Patna
IE Services for 4 laning of existing 2lane stretch from Bamni (Design km 19.000) to MH/TG Border (Design km 51.985) Design Length 32.985 km section of NH930D in Maharashtra on HAM
CS for AE for Supervision of Cons of 4lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 of NH543(Design Length 41.210 Km)under BMP in Madhya Pradesh and Maharashtra on EPC Mode.
CS for AE for Const. of 4L Nagpur-Katol sec of NH353J include. Mitigation Structures from Design Ch.37.000 to Ch.45.990 TC-I and from Design Ch. 50.400 to Ch63.100 TC-II in Maharashtra on EPC Mode
Consultancy Services for Authority Engineer Laying of Optical Fiber Cable (OFC) and its allied infrastructure on Delhi-Mumbai Expressway and Bangalore Highway
Construction of 8 lane access controlled Expressway from Km 26.582 to Km 50.700 of Main Expressway and Km 0.0 to Km 3.00 of SPUR Shirsad to Masvan Section of Vadodara Mumbai Expressway in the State of Maharashtra on HAM under BMP Ph II Pkg XIII
RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode.
CS for AE for Supervision of Construction of 11 Nos of Standalone structures/Safety works (Package III) at different locations on various NHs in the state of Maharashtra on EPC Mode
Consultancy Services for Preparation of DPR for construction of 4-lane Southern Bypass of Jalgaon City in the State of Maharashtra
Construction of 11 Nos of Standalone safety structures / works at different locations on various NHs in the state of Maharashtra on EPC Mode
Constr. of VUP and widening of MNB struc including widening of Culverts and other works in BWK Project from km 36.600 to 175.000 sec on NH44 in the State of Maharashtra.
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (karvad to jujuwa section) in the state of Gujarat on Hybrid Annuity mode under Bharatmala Pariyojna (Phase I-Package IX)
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway Jujuwa to Gandeva Section in the State of Gujarat on HAM under BMP Phase I-Pkg VIII
IE Services for Supervision of Development and Operations of Multi Modal Logistics Park (MMLP) in Nagpur at Sindi in Wardha Dist in Maharastra through PPP on DBFOT basis.
IE services for Supervision of Construction of 8lane access controlled Expressway from Km 3.000 to Km 43.000 Shirsad to Amne Section SPUR of Vadodara Mumbai Expressway in Maharashtra on HAM under BMP
Construction of Eight lane access controlled Expressway from Km 217.500 to Km 254.430 of Vadodara Mumbai Expressway Ena to Kim Section in the State of Gujarat on HAM under BMP I Pkg VI
CS for AE for Supervision of for const. of Underpasses VUP LVUP SVUP MNB CULVERT and Service Slip Road for long term mitigation measures on Potential BS location in Lakhnadon Khawasa sec Gwalior Nagpur corridor of NH44 under Road Safety in MP on EPC
Development of Multi Modal Logistics Park (MMLP) at Jalna in the State of Maharashtra on Engineering Procurement and Construction (EPC) mode
Construction of Greenfield Connectivity to Jewar International Airport from DND-Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on HAM under Bharatmala Pariyojana in Uttar Pradesh n Haryana
Consultancy Services for Feasibility Study for Development of Multimodal Logistics Park at Pune and Detailed Project Report for External Trunk Connectivity Infrastructure to the Multimodal Logistics Park site in Pune.
Cashless Treatment Scheme for road Accident Victims on the Delhi Mumbai Chennai Chennai Kolkata Kolkata Agra Agra Delhi Corridors of Golden Quadrilateral
Construction of bypass to Mozari town on NH53 (Old NH6) Taluka Tiwasa Dist. Amravati (Existing km. 118.700 to km. 124.400) (Design km. 0.000 to km. 6.100) in the State of Maharashtra on EPC mode
Consultancy services for Independent Engineer for supervision of Construction of Eight-lane Vadodara-Mumbai Expressway) in the state of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode
CS for Preparation of DPR for (a)Development of new GF High speed corridor from Nanded-Degloor along with spur connecting to Jalna-Nanded Expre.(b)Elevated viaduct-flyover in AusaTown and (c)Flyover-Trumpet Interchange at Waranga Phata T-Junc. in MH
Consultants for Preparation of Feasibility Study Report for development of Inter modal station (IMS) including development of Commercial Zone at Nagpur Maharashtra
Construction of 4 Nos of Standalone safety structures-works at different locations on various NHs in the State of Maharashtra on EPC Mode 2ND CALL
Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch. 61.878 and 63.845 for Jamb Junction in the State of Maharashtra on EPC mode. Regarding appraisal by IAC
Construction of Eight Lane Access Controlled Expressway from Km 69.800 to Km 79.783 (Bhoj to Morbe Section-SPUR of Vadodara Mumbai Expressway) in the state of Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana (Phase II-Pkg XVII)
Construction of 4-6 lane bypass for Belagavi city from Km11.00(Goa side) of NH4A to Km516.000(Pune side) of NH4(Length 34.48km) inKarnataka on HAM(Pckg1A)
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI MUMBAI EXPRESSWAY FOR BUNDLE DD1 TO DD4 IN DELHI DAUSA SECTION AND BUNDLE VK1 AND VK2 IN VADODARA KIM SECTION ON LEASE BASIS
Cashless Treatment Scheme for road Accident Victims on the Delhi Mumbai Chennai, Chennai Kolkata, Kolkata Agra, Agra Delhi Corridors of Golden Quadrilateral
AE for Upgradation to 2/4 Lane with paved shoulder of Shirwal to Lonand sec from 159.900 to 188.025 of NH965DD (Sec I) and 2lane with paved shoulder of Lonand to Satara Sec from 51.500 to Km 96.246 of NH965D (Sec II) in Satara dist in MH on EPC
Construction of External road connectivity to the proposed Multimodal Logistics Park at Nagpur-2nd call
IE Services for 6 laning of Surat Nashik Ahmednagar Solapur MH/KNT Border Greenfield stretch PKG XIV from km 512.000 (Hasapur) to km 548.400 (Badadal) in Maharashtra to be executed on HAM under Bharatmala Pariyojana
Consultancy services for IE for supervision of Construction of Eight lane access controlled Expressway from Km 190.00 to Km 254.430 of Vadodara Mumbai Expressway (Gandeva to Kim Section) in the State of Gujarat on HAM under BP.
Construction of Eight lane access controlled Expressway from Km 190.000 to Km 217.500 of Vadodara Mumbai Expressway (Gandeva to Ena Section) in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana (Phase I-Package VII)
Engagement Of Manpower SP For Collection Of Fee On Daroda FP At Km. 92.500 Of Borkhedi Wadner n Kelapur FP At Km 150.000 For Sec From Km 36.600 To Km 174.750 Borkhedi Yerla MH or TG Border Sec Of Nagpur Hyderabad Sec Of NH44 In Maharashtra
IE services for Supervision of Construction of 8 lane access controlled Expressway from Km 69.800 to Km 79.783 (Bhoj to Morbe Section-SPUR of Vadodara Mumbai Expressway) in Maharashtra on HAM under BMP (Phase II-Package XVII)
Construction of Eight lane access controlled Expressway from Km 43.000 to Km 69.800 (Amne to Bhoj Section-SPUR of Vadodara Mumbai Expressway) on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XVI)
Balance work of Upgrad to 4 Lane with Paved Shoulder config of the highway starting from km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass)(L75.000km) sec of NH160 in Maharashtra under BMP on EPC Mode.
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package IX)
BW under Phase-II for 4-laning of Khed Sinner comprising of the stretches of Kalamb bypass (km68.576 to km72.390) Linear length of Bhatkalwadi (km89.550 to km90.400) and Alephata bypass (km 92.030 to km 96.000) in Maharashtra on EPC Mode
Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (12.190 to km 42.113) section of NH60 in Maharashtra on BOT (Toll) Mode.
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of a New 4-lane Outer Ring Road around Latur City in the State of Maharashtra-2nd call
Providing the laying of Optical Fiber Cable from km 697.220 (MP-Gujarat) to km 844.800 of Delhi-Vadodara expr. and km 26.600-378.722 of Mumbai-Vadodara Expressway and from km 0.000-79.900 of spur to JNPT on EPC mode in Gujarat and Maharashtra (PKG-II
CS for preparation of DPR for develop. of 6 lane GF highway from Ahmedabad to Godhra Tentative L 120 Km to connect Ahmedabad with Delhi Mumbai Expressway (DME)