Loading…
Loading…
261 results • Best match
Upgradation of existing road to 2 Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length 26.249) of NH39 (New NH02) under Bharatmala NH-O TSP in Nagaland in EPC mode
Balance Work of Construction of Two-lane with hard shoulders of Changtongya-Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 in the state of Nagaland (Pkg-2) under NH (O) Plan - 2nd Call
Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157.200 to Km 157.500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through EPC Contract Basis
Consultancy Services for Preparation of DPR for Slope Protection and Slope Stabilization works including Rock-fall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima road in Nagaland
Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 on NH-29 in the state of Nagaland under SARDP-NE through EPC Contract Basis
Construction of two lane with hard shoulder of Kohima-Jessami Road on NH29 (Old NH-150) From existing km 7.880 near Chedama Junction to existing km 30.474 near Chakahabama in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode Package 1
Consultancy Services for AE for Supervision of Construction of 2 laning with Hard shoulder of Peren - Dimapur section on NH 129A from (i) Design Km 109.494 to Km 126.775 (Pkg - I) (ii) Design Km 126.775 to Km 146.450 in Nagaland (Pkg - II)
Cons. of two lane with hard shoulder of Kohima-Jessami Road on NH29 (Old NH-150) From existing km 30.474 near Kidwema road Chakahabama to existing km 53.220 near Kikruma Village in the state of Nagaland under Bharatmala Pariyojna on EPC Mode Pkg2
Short Term Maintenance Contract of Dimapur-Kohima Section on NH-29 from old chainage Km 134.650 to Km 134.800 New Chainage Km 31.462 to Km 31.612 Length 0.15 Km in the state of Nagaland in FY 2024-25 Percentage Rate and Work Order Basis
Power Generator-DG Set (Upto 900 KVA)
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6550671 Dated : 08-08-2025 Bid Document 1/10 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting