Loading…
Loading…
3,600 results • Best match
NH-42 to (Mushapapuli chhak) Paratara road
SR to NH-23 to Alekhapur road
Sl.No-4-NH-5 to Bajipur road
NH-57 at Chakapada to Kadab road
NH-42 to Dakara Via Basiapada road.
L038-NH 5 Kimbhiripada to Lambodarpur Road
NH-217 to Haliapali via Bilenjore Road
NH-16 to Nuagaon via Patharabandha Road
SR to NH-23 to Badasahajbahal Road
NH-5 to Chilika Railway Station road
NH 203 to Gangotrinagar road Lane-3
FDR to NH-60 to Madhupura Road
NH 49 at Golabandha to Dehurimunda Road
NH-42 to Meramundali_Road_Paver Block_1.100 to 1.400
SR to NH-6 to Sargada Road
NH-60 to Padabadagoan_Road_CC Drain_0.200 to 0.800
SR to NH 215 to Nahabeda Road
FDR to NH 215 to Tokalbahal Road
Construction of road NH-23 to Bemta
NH 5 to Banaparia road_Road_SDBC_0.000 to 2.000
NH-23 to Anantasayan_Road_Paver block_0.000 to 1.200
Supplying Pond Ash to End of Kamakhyanagar Bypass to Duburi section ofRoad stretch of NH-200 (New NH 53) under the jurisdiction of PD-NHAI,PIU-Dhenkanal
Supplying Pond Ash to Talcher to End of Kamakhyanagar Bypass section ofRoad stretch of NH-200 (New NH 53) under the jurisdiction of PD-NHAI,PIU-Dhenkanal.
CS for AE for SC of 6-lane access controlled Greenfield highway from km 150.000 to km 207.100 of Deogarh to Rajasthan-Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in the State of Rajasthan on EPC mode under BMP AJ-CS-Package-8
4laning from Godibandha to Ballahar Chhak Ballhar Chhak to Banarapal and Banarapal to Start of Anugul by pass at Km.314.130 to Km.321.035 of NH53 at Km.75.200 to Km.84.000 of NH149 at Km.84.000 to Km.85.750 of NH55 under NH(O) on HAM in Odisha
IES for 4 laning from Godibandha to Ballahar Chhak to Banarapal and Banarapal to Start of Anugul bypass at Km.314.130 to Km.321.035 of NH53 at Km.75.200 to Km.84.000 of NH149 and at Km.84.000 to Km.85.750 of NH55 under NH(O) on HAM in Odisha
Impvt to NH 5 to Naraharipur via Sutei Badagaon Road (NH 5 Kuruda to Naraharipur road) for 2019-20 under CWA
Improvement to Service Road of NH to Remal Dam, NH to IB and Dam Periphery Road area of Remal Irrigation Project
Development of A Site RO Within 4 Km from intersection of SH-42 and NH-59 (Ambedkar Chowk) on NH-59
RECTIFICATION OF BLACKSPOT IN KANAKTORA JHARSUGUDA OF NH 49 AND BADARAMA WILDLIFE SANCTUARY OF NH 53 IN THE STATE OF ODISHA
CONSTRUCTION OF 2 NOS OF D TYPE TWIN TYPE NH STAFF QUARTER AT NH SUBDIVISION MOHANA FOR THE YEAR 2025 26
Construction of RCC Drain with Cover Slab on Bypass portion of NH-6 (New NH-49) passing through the Keonjhar Township starting from Keonjhar bypass section of NH-6 to End of Keonjhar bypass section of NH-6 i.e. up to Malgaon fly over from Ch. 6/140 K
S/R to NH-5 to Kailashchandrapur Road
S/R to NH-5 (Kuliana) Patihinja Road
S/R to NH-5 to Gamhapur Road
Sl.No-8-NH-16 to Abdula Nagar road
NH-217 (Tarbod) to Mendatal via Babeghati Road
NH 60 to Naiksahi road for 2019-20
S/R to NH-6 to Badbudamara Road
Talamedhi to Padampur NH-5 Via Haladia Road
NH-203 to Mahavir Nagar road (Gada Mahavir)
S/R to NH-5 Matiabeda Routra Road
S/R to NH-6 to Kendua Road
SR to NH-5 Kuliana to Ptihinja road