Loading…
Loading…
54,455 results • Best match
Construction of 6 lane connectivity to Visakhapatnam Port Road from Km 0.000 (Sabbavaram bypass of Anakapalli Anandapuram corridor)to Km12.660 (Sheelanagar junc)of NH 516C on HAM in Andhra Pradesh under NH(O)
Operations and Maintenance of Four lane Parwanoo-Solan Section of NH-22 (Now NH-05) from Km. 67.000 to Km. 106.139 in the state of Himachal Pradesh on Performance based Maintenance Contracts (PBMC)
Strengthening and improvement of existing 4 Lane Divided Carriageway from Km.27.700 to Km. 75.500 of NH-27 (old NH-25) Lucknow-Kanpur section in the state of Uttar Pradesh on PBMC mode
Rectification of 6-Nos of accident spots in (a) Yavatmal-Wardha section of NH-361 (B) Nagpur-Kondhali section of NH-53 through combined bidding in the State of Maharashtra on EPC Mode
Strengthening/Overlaying on Six lane Gurgaon Kotputli Jaipur section of NH 48 (Old NH 8) from Km 107.100 to Km 188.000 in the State of Rajasthan at the Risk and Cost of Concessionaire
Repair and Maintenance of Muzaffarpur - Darbhanga - Supaul section of NH - 27 (old NH - 57) from Km. 0.00 to 145.450 in the state of Bihar. (Total length 145.450).
Routine Maintenance and Incident Management of Two laning of Muzaffarpur -Barauni Section of NH - 122 (Old NH -28) from 519.600 to 627.163 in the state of Bihar.
Routine Maintenance and Incident Management of Gurgaon Kotputli Jaipur section of NH 08 (New NH 48) from Km.107.100 to Km. 273.00 in the state of Rajasthan
Construction of VUPs at km 565.175, at km 574.550 and at km 593.660 of NH-122 (Old NH 28) in the State of Bihar on EPC mode.
Construction of Major Bridge across Tunga River at Km 0.295 innew alignment on NH 169 (Old NH no.13) on Shimoga Mangalore Section in the state of Karnataka on EPC mode. (Job No. NH-169-KNT-2020-21-919)
Repair and Maintenance of National Highway NH-40 from Barapani -Shillong - Km 61.80 to Km 79.000 of NH 40 along the existing road in the State of Meghalaya for the FY 2022-23 Item Rate Basis , Total length - 17.20 km
Consultancy Services for Preparation of Detailed Project Report and providing pre construction activities for widening from Single and intermediate lane to 2-lane with paved shoulder from km 160.00 to km 175.00 Mussoorie to Bataghatof NH-707A and NH-
Installation of Crash Barrier and Protection works from Km. 0.00 to 36.00,Km 70.00 to 84.20 on NH-107A and Km 0.00 to 18.700 on NH 107 in the State of Uttarakhand under Road Safety Annual Plan 2023-2024
Emergent Roof treatment, subsequent repairing of damaged internal wall and restoration of roof of Cycle Garage at National Highway Division No-VI office at Anatheswar Road, Krishnagar, Nadia under Krishnagar N.H Sub Division of National Highway Divn
Strengthening work from Chainage Km. 70.000 to Km. 84.200 on NH-107(A) under Annual Plan of NH(O) 2019-20 in the state of Uttarakhand
Custom Bid for Services - Lease Fiber from NHAI OfficeKrishna LankaVija To POWERGRID Chamber Hanumanpet80616208, Custom Bid for Services - Lease Fiber from NHAI OfficeKrishna LankaVija To POWERGRID Chamber Veterinary 50308180638703
Annual Rate Contract for Day-Day Maintenance Repairs Renovation of Furniture Items Furnishing Items CP-Sanitary Items Plumbing Sewerage Services and Miscellaneous Civil Work at NHAI at New Delhi HQ and Other Hired buildings-spaces in New Delhi
Consultancy Services for Traffic Survey of National Highways for up-gradation to Two Lane /Four Lane with Paved Shoulder configuration in Chhattisgarh
Long Term Improvements to the Black Spot at KA 02 548 Tatanahally Gate at Km 153 700 of NH 275 Bantwala Bengaluru section under Bengaluru NH Division in the State of Karnataka Job No NH 275 KNT BS 2021 22 944 2nd call
Strengthening work from Design chainage 18.700 to 21.850 (Existing km.16.545 to 19.695) and Construction of R/wall and B/wall on NH-107(old109)under Annual Plan for NH(O) Works 2024-25 in the State of Uttarakhand
Strengthening work from km no. 1,2,5 to 10, 13,14,18,20, 26 to 33, 77 to 85, 96 to 98, 160 to 195 (68 km.) on NH-346 on EPC mode under NH division Gwalior in the state of Madhya Pradesh
STMC work form km. 104.300 to 122.250 of NH 753J form km. 0.00 to 6.00 of NH 752H and form km. 95.140 to km. 160.850 of NH 548D in the state of Maharashtra.
Strengthening and Overlay including Other rectification works on section from Padhi to Dahod section of NH- 113 from Km.180.000 to Km.267.000 (Design Ch.180.000 to Ch. 265.588) (Length 85.588 Km) of 2L with PS of section of NH-113 (New NH-56)
SHIFTING OF EXISTING PIPE LINE LAID PARALLEL TO THE NATIONAL HIGHWAY NO FOR DHULE WATER SUPPLY SCHEME NEAR MOTI NALA BRIDGE AT DHULE
Request for Proposal (“RFP”) issued by National Highways Infra Trust (NHIT) for Empanelment and Engagement of Agency/Firm for Supply, Installation, Repair and Replacement of Pedestrian Guard Rail (PGR) for the Projects under SPVs of NHIT.
Installation of Retro-reflective Road Sign Boards and Transverse Road Bar Marking/ Zebra Crossing Marking/ Road Marking Strips at Accident Prone Locations and Black Spots Locations on various National Highways Projects under Regional Office UP (East
Engagement of user fee agency through E-Tender at 3M toll fee plaza for Construction/upgradation of two lanes with paved shoulders of NH-911 from Sriganganagar to Raisinghangar under NH (O) in Rajasthan
Construction of Slope Protection Work at Various Locations on the Hillside between Km 67.000 to Km 106.139 of the Parwanoo Solan section of NH 22 (now NH 5) on EPC mode in Himachal Pradesh
Independent Engineer services for Four Laning with paved shoulder of section from km 53.600 (Gola on NH-320) to km 81.446 (Ormanjhi on NH-320B) in the state of Jharkhand on Hybrid Annuity Mode
4 Laning from km 0.00 to km 42.00 of Dobaspet to Dodaballapur Bypass section of NH-648 ( Old NH-207) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Package-I)
Consultancy services for Independent Engineer services for Four Laning of Ahmednagar Solapur District Border to Tembhurni section of NH-561A from Ch.80.390 to Ch.139.750 in Maharashtra on HAM mode under NH (O)
Tolling Operation Maintenance and Transfer of four lane Allahabad Bypass section (from Km 628.753 to Km 713.215) of NH-2 (New NH-19) in the state of Uttar Pradesh (TOT Bundle 11)-2ND CALL
4 Laning of Jagadhri Tajewala road section from Yamunanagar bypass Design Ch. 0.223 to Tajewala Design Ch. 32.300 of NH-907 under NH(O) (Design length 32.523 km)(Pkg1) in Haryana on EPC Mode
Operation and Maintenance of four laning of Hisar to Dabwali Section of NH-10 (New NH-09) from km 170.000 to Km 314.660 (length 144.66 Km) in the State of Haryana on PBMC mode
Independent Engineer services for Six Laning of Thaliparambha Muzhapilangad section from Km 137.900 to Km. 170.600 of NH-17 New NH-66 under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode
Construction of Agra Bypass (Northern) connecting km. 174.500 of NH-19 (old NH-2) to km 141.000 of Yamuna Expressways in the district of Mathura in the state of Uttar Pradesh on EPC mode
Balance Work of Four laning of Panvel-Indapur section of NH-66 (Old NH-17) from km 0.000 (Panvel) to km 42.300 (Kasu) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode
IE services for Construction of 4 Lane Bypass to NH114A Connecting NH-333 and NH-133(Deoghar Bypass) from design km 0.000 to design Km 49.000 Total Length 49.000 km in Jharkhand on HAM
Engagement of user fee collection agency on the basis of CB for Limha FP at Km 51.975 on Bilaspur-Pathrapali section Km. 0.000 to Km 53.300 of NH-111 (New NH-130) in Chhattisgarh
CS for AE for Supervision of construction of Underpass on NH-31 (old NH-56) for proposed Expansion of Runway of Lal Bahadur Shastri International Airport at Varanasi in Uttar Pradesh on deposit basis.
Engagement of Manpower Service Provider for collection of User Fee on Kelapur FP at km. 150.000 of Borkhedi Wadner of Nagpur- Hyderabad section of NH-44 (Old NH-7) in the state of Maharashtra
4 laning from km. 42.000 to km. 80.00 of Dodaballapur Bypass to Hoskote section of NH-648 (Old NH-207) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Package-II)
Independent Engineer Services during Operation and Maintenance period of Lucknow-Raebareli Section of NH-24B (New NH-30) from km. 12.700 to km. 82.700 on DBFOT (Annuity) and TOT in the State of U.P
Upgradation and Four Laning of Haridwar Bypass Package-1 From Km. 0.000 (Km 188.100 of NH-58) to Km. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode
Periodicial Renewal (PR) between km. 274.00 to km. 283.00 on NH-707A in the state of Uttarakhand
Short Term Maintenance Work from km. 165.00 To 168, Km 170 and Km 171 on NH-707A
Short Term Maintenance Work for Left out Portion of NH-219 Under Short Term Maintenance Contract (STMC)
STMC work from Ch. 52.180 to 61.750, 70.750 to 72.900 and 79.360 to 83.000 on NH-707A
Rate Contract-II for ash transportation from NTPC Lara to NHAI/StateGovt. road project
Road Safety Work from Km 175.00 to 233.00 on NH-707A and installation of thrie beam crash barrier from Km. 17 to 41 in remaining length on NH-123(507) in the State of Uttarakhand under Road Safety AP 2025-26