Loading…
Loading…
54,464 results • Best match
Consultancy Services for AE for supervision of Balance Work of four laning of Panvel-Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in the State of Maharashtra under BMP on EPC mode
Independent Engineer services for 4-Laning of NH-39 (old NH-75) from design Km 147.540 (existing Km 148.020)(Bhogu Village) to design km 196.870 (existing Km 197.420) (Sankha Garhwa Road) in the State of Jharkhand on HAM(PKG-III)
IE for Upgradation of Existing 2 Lane Carriageway to 4 Lane Divided Carriageway from Ch. 94.030Junction with Existing NH-56 (Km.414.646)Jabugam Vill. in Bodeli Taluka to Ch. 132.320 (Existing454.500) Dhamasiya Vill. in Naswadi Taluka NH-56 in Gujarat
IE services for Construction of 4 L of Badnawar Petlawad Thandla Timarwani section of (NH 752D) from Badnawar Bypass Ch. 70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE 4) Ch. 150.850 in Madhya Pradesh on HAM under NH(O)
Independent Engineer services for Six Laning of Thalapady to Chengala section of NH-17 New NH-66 from Ch 17.200 ex. km 17.200 to Ch. 56.200 ex. Km 57.200 under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode.
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in Madhya Pradesh
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF FOUR LANING OF PINJORE (END OF PINJORE BYPASS)-NALLAGARH SECTION (KM 4.200 TO 35.395) ON NH-105 (OLD NH-21A) IN HARYANA AND HIMACHAL PRADESH ON EPC MODE UNDER BMP
Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch. 0.000 (Km 188.100 of NH-58) to Ch. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for Bor Charnan Fee Plaza at km 238.800 for Barmer Sanchor Gujarat Border section of NH-15 (New NH-68) in the State of Rajasthan
Independent Engineer services for Six laning from start of Valanchery bypass to Kappirikkad section of NH-66 (old NH-17) from Design Ch.298.500 to Design Chainage 335.850 in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana
Consultancy services for Independent Engineer for supervision of 4 laning from km. 42.000 to km. 80.00 of Dodaballapur Bypass to Hoskote section of NH-648 (Old NH-207) on HAM under Bharatmala Pariyojna in the state of Karnataka Package-II
Engagement of user fee collection agency on the basis of CB through e-tender for Gowraram FP at Km. 88.650 for the section from Km 71.200 to km 121.000 (length 49.379 km) of NH-221 (New NH-30) in Telangana
Four Laning of NH 530B from Gaju Village (Design km 32.982 Mathura-Aligarh District Boundary) to Devinagar Bypass(Existing Km.208.000 of SH 33(NH-530B)-(Design Km.66.000)(Design length 33.018 km) in Uttar Pradesh on HAM mode (Package-1C)
Independent Engineer services for Six Laning of Chengala to Neeleshwaram section of NH-17 New NH-66 from Ch. 56.200 existing km 57.200 to Ch. 93.468 existing km 95.650 under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode
Consultancy Services for AE for Construction of Additional Structures Improvement of Service Road and Maintenance of Six Lane Gurgaon-Jaipur Section of NH-48 (old NH-8) between km 42.700 to km 107.100 in the States of Haryana on EPC Mode
Improvement and Routine maintenance of Lakhanpur-Jammu section including Jammu Bypass from Km 16.350 to Km 97.20 and Km 0.00 to 15.00 of Jammu Bypass of NH-44 (old NH-1A) in the UT of Jammu and Kashmir (4th Call)
Independent Engineer Services for Four laning of existing two lane road from Ghoman to Tanda (NH-503A) from Km 54.000-Km 85.500 (Design Length 31.500 km) on Hybrid Annuity Mode in the State of Punjab under NH (O) (Package-II)
Lehrabega fee plaza at existing km 191.929 (design chainage km 199.097) form existing km 168.000 to km 209.405 on Tapa to Bathinda section of NH-64 (new NH-07) under NHDP-IV on EPC basis in the State of Punjab
Collection of user fee through the agency selected on competitive bidding basis at Dhoki Fee Plaza at km 178.100 for End of Ane Ghat to Start of Ahmednagar Section of NH-222 (New NH-61) of two Lane section in Maharashtra
Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode
CS for AE for Supervision of Up-gradation of port connectivity NH configuration from existing 2-4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house(from Ch.0.0 to Ch.13.198)under Bharatmala Scheme
Independent Engineer Services for Six laning from Kodungallur to Edapally section of NH-66 (old NH-17) from Design Ch.397.750 to Design Chainage 423.780 in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana Total Length 26.030 KM
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
Construction of New Six Lane Major Bridge including Approaches from Km.172.895 to Km.173.670 of NH-215 (New NH -520) in Rimuli- Koida Section in the State of Odisha under NHDP Phase III on Engineering, Procurement and Construction (EPC) Mode
Rehabilitation and Upgradation from 2 lane to 4 lane of NH stretch under Bharatmala Pariyojana for Unnao-Lalganj section of NH-232A on Hybrid Annuity Mode in the State of Uttar Pradesh and Design chainage Km 0-000 to 70.000
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Gobindpur (NH 55) to Tangi from Km. 70.995 to Km. 111.325 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 3)
AE Services for Balance Works for 6Laning of Sriperumbudur to Karapettai Sec of NH-4(New NH-48) from Km 37.000 (Exis Km 37.000) to Km 71.015 (Exis Km 71.000) in Tamil Nadu on EPC Mode under NHDP Phase-V
Construction of balance work of Widening and strengthening for improvement and up-Gradation of NH-709A Garhmukteshwar chainage- 83.200 of NH24 to Meerut (chainage 9.860 of NH235) including connector to Nh-119 Package XII in Uttar Pradesh on EPC Mode.
Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Rajpur) at Km 52.000 (design) to Gojariya at Km 128.940 (design), a length of 76.940 km (PKG II) of NH-68 in Gujarat under NH(O) on EPC Mode
Construction of Six-Lane Access Controlled GH section of NH-150C from Julekal Village (Km 242.200) to Kurnool town terminating on NH-40 (Km 280.400) as part of Solapur-Kurnool-Chennai ER on HAM under BMP in Telangana (Package-II)
Improvement and Upgradation of Existing 2-Lane Bypass to 6-Laning from Km. 403.100 (Design Ch. 402.600)-Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 (Old NH-4) in Karnataka to be executed on EPC Mode
Construction of 6 L ACH from Junction with Sec-62/65 dividing road on Faridabad-Ballabhgarh Bypass to Junction near KMP Expressway with NH-148N Delhi-Vadodara Exp Section of NH-148NA Des Ch 33.00 to 59.063 in state of Haryana
Construction of 8 Lane Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch.419.000-427.300) section of Delhi-Vadodara GFA (NH-148N) under BMP in Rajasthan on EPC Mode
Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102.000 to design km 142.357 (Design length 40.357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode
Construction of Balance Work of Two laning with paved shoulders of Sitarganj Bareilly section of NH-74 New NH 30 from Km. 254.820 to Km. 329.280 in the State of UP Uttarakhand on PERCENTAGE RATE Mode under NHDP Phase-IV
Four laning of Nanasa to Pidgaon section of NH-47 Old NH-59A Indore Harda Pkg III L 47.445 km Design Ch. 95.00 Km to 142.445 km under BMP Ph-I Economic Corridor in the State of Madhya Pradesh on HAM.
CS for IE Services for Construction of 6lane access-controlled Spur connectivity starting from Ch. 15.100 of Ambala Chandigarh section of NH-205A and terminating at Ch. 2.500 of Zirakpur Bypass (TL 10.300 Km) under NH(O) in Punjab on HAM)
Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch.17.200 (existing km 17.200) to Ch.56.200 (existing Km 57.200) (Total length 39.00km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna
Engagement of user fee agency through e-quotation for Kharpada FP at Km.15.000 of NH-66 of Village Karnala/Tara, District- Raigad for the project of Balance work of Four Laning of Panvel-Indapur Section of NH 66 in Maharashtra
Construction and widening of ROB existing (Railway portion and approach) at Km. 76/00 of Old NH-116 (New NH-552 Extn.) in Sawai Madhopur City in the State of Rajasthan on EPC mode (Job No. NH-116 (New NH-552 Extn.)-RJ-2020-21-760)
STBT TO TANDA DAWADIPAR ZANJIYA MOHOGAON TUMKHEDA (KHU) CHOTA FULCHUR BUS STOP UPTO NATIONAL HIGHWAY 543 ROAD MDR -44 IN KM 0/00 TO 5/400 TALUKA AND DIST .GONDIA
Under District Gorakhpur, Construction work of CC Road and RCC drain in Gorakhpur district from Gorakhpur-Varanasi National Highway to Ramsakal Nishad house and in various streets Lot No 2
F.D.R. to National Highway to Pakani Shivani Tirhe Pathari Telgaon M.D.R. 37 Part - Pakani- Tirhe Km.7/300 to 12/00 and 16/500 to 19/800 Tal.North Solapur Dist.Solapur
Supply and Installation of 08 m G.I. octagonal pole with LED street light at ward no. 11 Sant Balmikinagar from National highway 34 to Indrapal in Nagar Panchayat Gabhana (Aligarh).
Under the State Plan CM Ghosna No 586 2018 new construction work of motor road from National Highway to Kalyani Village 1 Km under Dunda Block of Yamunotri Assembly Constituency
REPAIRS TO PLASTER COLOURING RAIN WATER POLYMER MICROCONCRETE, FLOORING, WINDOWS, DOORS, MISCELLANEOUS ITEMS ETC TO ASST. ENGINEER, SECT/JUNIOUR STAFF AREA NATIONAL HIGHWAY PWD 5TH FLOOR KONKAN BHAVAN ANNEXE BUILDING.
Repairs to Plaster Colouring Rain water Polymer microconcrete, Flooring, Windows, Doors, Miscellaneous items etc to Asst. Engineer, Sect/Juniour Staff area National Highway PWD 5th Floor Konkan Bhavan Annexe Building.
REPAIRS TO PLASTER COLOURING RAIN WATER POLYMER MICROCONCRETE, FLOORING, WINDOWS, DOORS, MISCELLANEOUS ITEMS ETC TO OFFICE STAFF AREA AND STORE ROOM NATIONAL HIGHWAY PWD 5TH FLOOR KONKAN BHAVAN ANNEXE BUILDING.
Heavy patch work from Km. 125.920 to 163.00 on Rai Malikpur-Narnaul- Mohindergarh- Charkhi- Dadri- Bhiwani- Hansi- Barwala- Tohana- Jakhal road National Highway No. 148B in the State of Haryana