Loading…
Loading…
54,469 results • Best match
OnM of DG Sets Electric Equipment and Electrical Installation UPS system Extra LV System Heating Ventilation and AC (HVAC) Fire Protection Works RO Plant WTP/Systems STP etc at NHAI HQ Office Buildings at G 3 5n6 Sec10 Dwarka Camp office at Patel Cho
O and CM of DG Sets Electrical Equipments Electrical Installation UPS system ELVS HV and AC(HVAC)FPW RO Plant WTP/STP Cleaning of Glass Curtain MLCPS and Maintenance of Landscape/Horticulture Works at NHAI HQ G3 G5 and 6 Sector10 Dwarka 2nd Call
Rehabilitation of Two _ Four Lane ROBS at Km 67 of Musrighararia _ Darbhanga Section of NH 322 in the state Of Bihar.
Periodical Renewal work on NH-121 (309) from km. 78.00 to 100.00 (Sald Mahadev to Dhumakot) in the State of Uttarakhand
FDR during 2019-20 on NH-202 from 0.00 Km to 177.00 Km in the State of Nagaland under Tuensang Division.
Maintenance of Kalka Shimla Wangtoo Road New Nh 05 Km 167.00 to 236.00 SH C.o R.wall at RD 191.620 to 191.628
Maintenance of Kalka Shimla Wangtoo Road New Nh 05 Km 153.180 to 236.00 SH C.o R.wall at RD 161.195 to 161.210
O and M of facilities-amenities at Chhuipali Toll Plaza (Km.123.206) and Dhank Toll Plaza (Km.182.636) on both sides (LHS-RHS) under Highway Nest (Mini) including toilets in the State of Chhattisgarh under NHAI PIU Abhanpur
Signboard work in Selected stretches at Curves and Ghat portions in km 12 to 140 on Jabalpur Dindori Stretch on NH 45E (NH Division Jabalpur)
Signboard work in Selected stretches at Curves and Ghat portions in km 52 to 100 on Mandla Dindori Stretch on NH 543 (NH Division Jabalpur)
Ordinary Repaire works in km 1 to 30 on Balaghat-Nainpur Stretch on NH 543 of NH division Jabalpur in the State of Madhya Pradesh
Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh
Widening and Strengthening to two lane with paved shoulder of NH-730H(50km), Construction of flyover at Engineering college chauraha on NH-24A, Construction of Amethi bypass (Part-II)(7km).
PATCH REPAIR WORK IN KM 0/00 (CHANDWAJI) TO 14/00 (LHS) ON NH-248 (OLD NH-11C) DELHI-JAIPUR ROAD
CLEANING OF DRAINS AT CHANDWAJI, ACHROL, GUNAWATA, LABANA,DHAND, AND KUKAS TOWN ON NH 248 (OLD NH 11C) DELHI- JAIPUR ROAD
REPAIRING OF DAMAGED PARAPET WALL IN KM. 0/00 TO 28/00 ON NH-248 (OLD NH-11C) DELHI-JAIPUR ROAD
Strengthening of road from Km 6.00 to Km 40.00 of NH 61 under NH Division Kohima in the state of Nagaland.
Strengthening from Km 783.12 to Km 788.00 of NH-150 under NH Division No. I Kohima in the state of Nagaland.
Collection of Road Inventory and Pavement Condition Data of National Highways in the State of Arunachal Pradesh for uploading on Road Asset Management System
Annual Maintenance of National Highway 544D from Km 0/0 to 5/6 (Old Km 348.800 to 354.400 of Hyderabad - Bangalore road) and Km 9/4 to 20/6 (Old Km 3/8 to 15/0 of Ananthapuramu Tadipatri Bhogasamudram road) in (R&B) NH Sub-Division, Ananthapuramu, Ananthapuramu Dist for the year 2020-21
Laying of MS casing pipes and carrier pipes for the National Highway NH-44 crossings in Gravity Main-1, Gravity Main-III pipelines for the work of Providing drinking water and Irrigation facilities to 68 tanks in the upland areas of Kurnool district from left side of HNSS main canal Phase-1 in Kurnool District
Patch repair work on Sagartola Kabirchabutra stretch on NH-45 Ext Between Km 171 to 190 (Excluding performance gaurantee stretch (NH Division Jabalpur)
Operation and Maintenance and Incident Management of of Patna Gaya Dobhi Section from 83.000 to km. 127.217 (Package -III) of NH -22(old NH -83) in the State of Bihar.(Total length 44.127 km)
Construction of Service Road Slip Road of CUPs at Km 39.083 46.895 65.395 78.991 and 87.395 of Indore Gujarat Project Highway NH 59 New NH 47 in the State of Madhya Pradesh 2nd Call
Mural Painting on Pillars(NHAI) From Alawalpur Chowk to Bus Stand Chowk Municipal Council Palwal
Mural Painting on Pillars(NHAI) from Bus Stand Chowk to Kithwari Chowk Municipal Council Palwal
Hiring of Commercial Vehicles, 6 numbers on a monthly rental basis for NHAI, PIU Palanpur
Rate contract for Pond Ash transportation from ash dyke of NTPCVindhyachal to NHAI road construction
Providing, Running and maintenance of commercial vehicle (Taxi Permit) for NHAI, Project Implementation Unit - Ajmer.
Patch of Road BY HMP From NHAI To Galia Godam in Ward-73, Zone-02
Improvement of Road By HMP From NHAI To Bus Charging in Ward-31 Zone-02
Procuerement of RCC Post of high tensioned wire on NHAI-458 Lambiya to Raipur Section
CARRIAGE OF STUB AND CLEAT FOR NHAI, FROM NAINI PRAYAGRAJ TO 220 KV SUBSTATION SAHUPURI
Providing road signages between inner Bus Terminus Junction to NHAI road at Kuthambakkam Bus Terminus
Cleaning of Nala from From NHAI to Teen khamba in Ward 58 under Zone 02
Hiring of Vehicles on monthly basis for use of Officers of NHAI PIU Office Patiala
Providing running and maintenance of Commercial vehicles on monthly hire basis for NHAI PIU Jodhpur
Providing running and maintenance of Commercial vehicles on monthly hire basis for NHAI PIU Barmer
Re-routing of Existing 250mm dia DI Pipeline obstructing NHAI Ramp-2 works at Naidupeta
Re-routing of Existing 250mm dia DI Pipeline obstructing NHAI Ramp-2 works at Naidupeta
ENGAGEMENT OF CONSULTANCY SERVICES FOR SUPERVISION OF VARIOUS EPC PROJECTS (A) KM 33/0 TO 126/520 OF NH-23, (B) KM 76 OF NEW NH-552EXTN. IN SAWAIMADHOPUR CITY, (C) KM 0/000 TO 36/810 OF NH-248A AND (D) KM 95/380 OF NH-552 EXTN.
Balance work for construction of Fulahar Bridge approach on NH 131A from km 49.050 to km 51.200 and from km 53.810 to km 55.190 in Malda district in the state West Bengal under EPC mode Job No. 131A/WB/2022-23/494
Periodic Renewal under Annual Renewal Programme for 2019 20 ARP from Km 55.00 to Km 64.00 and Km 76.00 to Km 79.00 Total 12.000 Km on NH 217 NH 51 Old on EPC mode in the State of Meghalaya
Rehabilitation and Upgradation of Single / Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand
SR of NH-2 to nagla Madari Road
NH 2 to nagla man singh bhat road
NH 2 to Nandpur hote huye ramkua road
SR of NH 2 to Nagla bag road
WBM road work from Muktidham to NH 3
Renewal of NH 2 to Mai Ghat Road