Loading…
Loading…
54,497 results • Best match
Four Lane with Paved Shoulders from Design Ch. 43.800 to Design Ch. 89.900 in Belgaum Hungund Raichur Section of NH748A in Karnataka on HAM Under NH(O) (Project Length 46.100 kms) (Package 2)
Four laning of Dhillon Nagar (Moga) to Bajakhana (Lambwali) section of NH-105B (Greenfield Alignment) from design chainage Km 0.000 to Km 38.440 under Bharatmala Pariyojana in the state of Punjab on HAM
Development of 4 lane Economic Corridor from Chandrakona Ghatal Road Crossing to Bowaichandi section Km 41.000 to Km 89.814 of NH 116A (Package-2) in the state of West Bengal under HAM Mode
Construction of VUP including approaches and Service Roads at Shedgaon Junction at Existing Ch.59.455 (Design Ch.59.437) of NH-44 on Nagpur Hyderabad section in the State of Maharashtra on EPC mode
Engagement of Manpower Service Provider for collection of User Fee on Daroda FP at Km. 92.500 of Borkhedi Wadner of Nagpur Hyderabad section of NH44 (Old NH-7) in the state of Maharashtra
Consultancy Services For AE For Supervision of Four laning of Katni-Bypass of NH-7 from km 359.500 to km 378.500 length 20 km in the State of Madhya Pradesh on EPC Mode
Consultancy Services for Preparation of DPR for 6-lane Road from Harsaru bypass of Gurugram Pataudi road at Wazirpur (NH352W) to Jhajjar (NH-352) including construction of Farrukhnagar Bypass (Approx. Length 33 KM)
Operation Maintenance of Two Laning with Paved Shoulder of Bhilwara Ladpura section of NH 758 From km 87.250 to Km 155.000 (Total length 67.750 kms) in Rajasthan on Performance Based Maintenance Contract (PBMC)
Four lane with paved shoulders from Budhel Junc. to Vartej Completion period 1.5 Years Maintenance period 5 Years Y junc. Km 0.900 to Km 9.400 on EPC mode under NH (O) in Gujarat
Construction of VUP/VOP at (i) Swami Chincholi (Ch. 97.370.000) (ii) Dalaj (Ch. 109.985) on Pune-Solapur (NH 65) from km. 40.000 to km.150.050 in the state of Maharashtra on EPC mode.
Four Laning of left-over works including Additional Structures in Kerala-Tamil Nadu Border Kanyakumari from Km.43.000 to Km.96.714 of NH-47 in the State of Tamil Nadu on EPC Mode
Const. of new 4 Lane Prayagraj Southern GF Bypass from Km34.400 (near Dandupur)to design Km. 43.200 (near Mahuwari) L8.800 Km PKG1 under PhaseI in Uttar Pradesh under NH(O) on EPC mode
Engagement of user fee collection agency on the basis of competitive bidding through e-tender on Ichgaon Fee Plaza at km 343.510 of Sangli Solapur section NH-166 in the state of Maharashtra
Engagement of user fee collection agency on the basis of CB through E-Tender for Varshamedi Fee plaza at km 13.125 for Four lane with paved shoulder of NH-341 from in Gujarat
Engagement of user fee agency through E-Tender at Pimparkhed fee plaza at Km 129.700 of Chalisgaon Nandgaon Manmad section from Km103.000 to Km.168.800 of NH-753J in the State of Maharashtra
4 laning of Agra-Aligarh Sec from Km. 28.000(Near Asroi vill in Hathras)to Km.64.900 (Junc with Yamuna Expressway) in Uttar Pradesh on HAM mode under NH(O) Scheme (PKG-II)
Construction of twin tube tunnels on Jammu Ring Road (NH-244A) between Design Ch.50.600-51.700 and Design Ch. 53.535-55.700 on EPC mode under Residual NHDP component of Bharatmala Pariyojna Phase-I
Engagement of user fee agency through e-quotation for Nattika Toll plaza fee plaza at km 369.500 for Six laning of Kappirikkad to Kodungallur section of NH-66 in the State of Kerala
Engagement of user fee agency through ETender at Nuruddinpur Toll Plaza At km.40.000 on the Section Raebareilly Jaunpur Km.00.000 to km 86.000 of NH-231 in the state of Uttar Pradesh
INCIDENTAL MANAGEMENT FOR TOLL FEE PLAZA KM 25 NEAR BADI GHATI VILLAGE (6 LANE) (II) TOLL FEE PLAZA KM 111 NEAR KUCHERA VILLAGE (6 LANE) ON AJMER-NAGAUR ROAD NH 89 (NEW NH-58) AT CHAINAGE 0/00 TO 148/250
Imp.to NH 361A to Khupsarwadi - Vishnupuri - Asarjan - NH 361A - Balirampur - NH 361- Tuppa - Wadgaon - Bramhanwada - Pathrad - Railwaystation -Degaon(Bk) - Yelegaon - Amarabad - Loni(Kh) - Rodgi- Nimgaon to NH 361Road with Kaleshwar long bridge and
Permanent Rectification of Black Spot TN-02-131 by constructing a Vehicular Underpass 12m x 5.5m at Km 93 704 in the project of Kumarapalayam Chengapalli section of NH-544 (old No. NH-47) in the State of Tamil Nadu on EPC mode 2nd Call
Independent Engineer Services during Operation Maintenance period for 6 laning of Krishnagiri Walajahpet section of NH 48 (Old NH 46) from km.0.000 to km.148.300 in the State of Tamil Nadu Under NHDP Phase V executed as BOT (Toll) under DBFO 3rd Call
Appointment of Safety Consultant for Four Laning of NH-365A from Kodad (Design Km.0.00 / Existing Km 185.00 of NH 65) to Khammam (Design Km 31.800/Existing Km 29.400) (Design Length 31.800 Km) in the State of Telangana under BP on HAM, 3rd Call.
Balance work of Road safety and Appurtenances in two laning with paved shoulder of Tindivanam-Krishnagiri section of NH-77 (Old NH-66) from Km 37.600 to Km 219.782 (Length 182.182 Km) under NHDP Phase-III in the state of Tamil Nadu on Item Rate
Widening to Four Lane with Paved Shoulders from Design Chainage Km 27.78 SH Chainage Km 459.5 to Km 57.32 SH Chainage Km. 489.04 Belur Hassan section of NH 373 in the State of Karnataka in EPC mode JOB No NH 373 KNT 2022 23 988
PBMC to Nongstoin - Rongjeng - Tura - Road of NH 127B (Portion from km 93.800 to km 149.100) (Length 55.3 km) under Williamnagar Division for the year 2023-24 in the State of Meghalaya. Job No. PBMC-127B-MG-2023-24-175
Periodical renewal of Jonai (Ruksin Gate)-Pasighat-Raneghat Road section of NH-515 from km. 536.00 to km. 5550.150 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Periodical renewal of Jonai (Ruksin Gate)-Pasighat-Raneghat Road section of NH-515 from km. 510.00 to km. 522.00 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
One time improvement of bypassed section on Nechipu-Hoj section of NH-13 (Bypass on Khupi segment, Nepna-Cheda segment, Sede to Pakro and Khodaso to Dee Dolo segment) in the state of Arunachal Pradesh for the year 2021-22.
Installation of crash barrier at narrow and blind curves and providing, fixing road delineators and reflectors along crash barrier, improvement of 5 intersection points between km. 233.00 to km. 283.00 of NH-707A under road safety annual plan 2021-22
PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 on EPC mode
Rearrangement of sewerage network system in sector- 5, 7 due to effect of winding of by pass by NHAI, KBS, Jodhpur.
Stg of NH-709(E) from km. 116.570 to 121.00 in Bhiwani City.
Construction work of RCC drain on NH 2 link road in village Kujpura
Barahan Road Par Hanuman Mandir Se NH-2 Tak RCC Nala Nirman Karya
CC and Drain construction work on NH-2 link road in village Kunjpura
CC work from NH-2 service line towards New Basti in village Maudha
Land slide protection works of 04 nos on NH-07 Joshimath Mana Road
RECONSTRUCTION OF 13 DUs (DEMOLISHED BY NHAI FOR CONSTRUCTION OF T-JUNCTION AND UNDER PASS AT SUBROTO PARK AREA) AT SUBROTO PARK
Improvement of road by HMP from NHAI service road to tikoniya park via Vaishno Mata Mandir In ward - 26 under zone -2
Providing and fixing Iron grill and other Civil works along the Boundry wall of Railway station and NHAI at ward no-20
WORK FOR SURVEY WORK OF 132 NEHTARUR 400 CHANDPUR/BIJNOR D C LINE AFFECTING THE NHAI HIGHWAY CONSTRUCTION WORK UNDER ETD BIJNOR.
NHAI deposit work under LMSD Kannur Shifting of line between locations 269 and 270 of 110kV Kanhirode Mundayad I and II feeders
Shifting of 40 meter ground based tower to another site due to NHAI road widening at Pupunki Lohapatti at ,Bokaro (BA- Dhanbad)
Providing, Running and Maintenance of Commercial Vehicle (Bolero/Scorpio or Equivalent Type) on Hire Basis for NHAI, Regional Office, Madurai (2nd Call)
WORK FOR SURVEY WORK OF 132 NEHTAUR (220)-CHANDOK/KIRATPUR-CHANDOK DC LINE AFFECTING THE NHAI HIGHWAY CONSTRUCTION WORK UNDER ETD-BIJNOR.
Reconstruction of single vent bed dam across Nana voikal on the western side of NHAI road at Kottucherry village in Kottucherry commune
Construction of CC Drain form NHAI main road to Existing CC Drian in RK math in Ward No. 1 - Reserved for SC
LALPUL CHINTAMAN GANESH TO NHAI JUNCTION 6.2 KM AND MR-24 INDORE ROAD TO CHINTAMAN RAILWAY STATION 2.74 KM SIMHASTH DN. UJJAIN