Loading…
Loading…
54,498 results • Best match
IE Services for Const. of 6lane Indore western bypass from km 0.000 to Km 34.0000 (PkgI)and Km 34.000 to Km 64.000 (PkgII)in the state of Madhya Pradesh on HAM under NH(O)
Engagement of Manpower Service Provider for collection of User Fee on Bankapur User FP under Tolling Operation Maintenance and Transfer of Hubli to Haveri sec of NH48 (NH-04) in the State of Karnataka
Const work of 4laning of Budhni to Badi sec of NH146B from design km 82.882 to design km 150.712 (Design Length 67.83 km) under NH(O) in the State of Madhya Pradesh on HAM.
Construction of 4lane South-East Bypass for Azamgarh City connecting NH-28 at existing Ch. Km 218.800 to Purvanchal Expressway at existing Ch. Km 247.850 (total length 14.905 Km) in UP on EPC Mode
Consultancy services for IE services for 4 laning of NH 363 from Repallewada Design Km 42.000 Existing Km 288.510 to Telangana Maharashtra Border Design Length 52.602 Km in the State of Telangana under HAM
RFP for 6-laning of Kanhauli-Ramnagar section of SH-78 (declaration of NH under consideration) from design Ch.Km 0.000 to Km 39.160 on EPC Mode in the State of Bihar under Bharatmala Pariyojana
Development of Six Lane Baraja Kandili Section of NH-130 CD Road from km 338.500 to km 342.500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package OD7)
Engagement of Manpower Service Provider for collection of User Fee on Chalageri User Fee Plaza under Tolling Operation Maintenance and Transfer of Davangere to Haveri section of NH-04 in the State of Karnataka
Six laning of Jodhpur Romana Bathinda Mandi Dabwali Punjab Haryana Border section of NH-54 from Design Ch 0.00 to Design Ch 27.400 Design length 27.40 km in the state of Punjab on HAM
CS for AE for Supervision of Upgradation and strengthening of Nashri Chenani section from Km. 0.00 to Km. 39.100 of NH244 in the UT of Jammu and Kashmir under NH(O) on EPC mode
Rehabilitation and Upgrading of Existing Road from Daseharan Village to Nauni Chowk of NH205 for 4L with Paved Shoulder(Km40.300 to Km58.450 Design Length 18.150Km PackageIIC in Himachal Pradesh under NH(O) on HAM.
Consultancy Services for preparation of DPR for Augmentation from 4 to 6 laning from Km. 0.00 Km. 119.300 of Baleshwar to Kharagpur section of NH 60 in the state of West Bengal and Odisha.
Independent Engineer Services during Operation and Maintenance of the stretch Tolling Operation Maintenance and Transfer of Orai-Bara Section from Km 1515.713 to Km 1578.872 of NH-25 in the State of Uttar Pradesh
Short Term Improvement and Routine Maintenance work of tolling reach of Mundiyar FP frm km 1184.322 to 1251.814 Length 67.492 Km on Baran Shivpuri Sec of New NH 27 in Rajasthan on PBMC Mode
Six laning of Vijayawda bypass from Chinna Autupalli (Design Ch. 0.000) to Gollapudi (Design Ch. 30.000) in Vijayawada Gundugolanu section of NH 16 in the state of Andhra Pradesh under Bharatmala Pariyojana on HAM
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF 4 LANING OF BARHI KODERMA SECTION OF NH 31 FROM KM. 0.000 TO KM. 27.500 IN THE STATE OF JHARKHAND UNDER NHDP PH IV ON EPC MODE.
AE for Construction of Additional Structures including approaches in Vadodara Surat section of NH48 between Existing Km 108.000 to Km 250.000 of NH48 on EPC mode under NH(O) in the state of Gujarat
4-laning of Dhangaon Boregaon section of NH-347BG 753L (Indore to Boregaon Pkg IV) Design Ch. 81.000 to 139.000 (Length 58.000 Km) under Bharatmala Pariyojana PhaseI in Madhya Pradesh on Hybrid Annuity Mode
Four Laning of Munger to Mirzachauki (NH-80) section from start of existing Bhagalpur bypass to Rasulpur (Design Chainage Km125.000 to Km 157.350) (Package 03) on Hybrid Annuity mode in the state of Bihar
Four Laning of NH-146 from Design Chainage km 59.475 (Existing Chainage km 81.240 near Vidisha) to Design Chainage km 88.600 (Existing Chainage km 110.315 near Gyaraspur) in Madhya Pradesh on HAM under BMP
Construction of 3 Nos of Standalone safety structures/works at different locations on 4 lane Wakhari Dharampuri section of NH-965 (Sant Dnyaneshwar Maharaj Palkhi Marg) in the state of Maharashtra on EPC Mode.
Engagement of user fee agency through E-Tender at Ghulal Fee Plaza at km 60.00 Kharar to Ludhiana Section of NH-95 from Kharar km 10.185 to Samrala Chowk Ludhiana km 86.199 in Punjab
Engagement of user fee collection agency on the basis of CB through e-tender at Semalkhedi fp at Km 84.200 of Ujjain-Jhalawar (upto Rajasthan Border) Section of NH- 552(G) in Madhya Pradesh
Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
Engagement of user fee agency on the basis of CB through e-tender for Balani Fee Plaza at Design Km 331.200 on Rajamunda to Barkote Section of NH-143 in the State of Odisha
Engagement of user fee collection agency on the basis of EQ through etender for Marri Fee Plaza at Km 24.555 of NH 543 for use of Balaghat Gondia section of NH543 in Madhya Pradesh
Balance work of Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra on Item Rate (Percentage) basis
Emergent road maintenance works for traffic safety of Boregaon Buzurg to Ichhapur section of NH 753L from Km. 145.000 to 203.600 in the state of Madhya Pradesh
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Khagaria - Purnia Section of NH -31 (Total Length - 140 Km) 2nd Call.
Maintenance work under STMC mode of 2 Lane Mokama-Munger NH-80 from km 1.430 to Km 70.000 (Total length of 60.470Km.) in the state of Bihar
Construction of Major Bridge on Urmila Sagar Dam Project at KM. 171.800 On Karauli Dholpur Section of NH 11B in the State of Rajasthan on EPC Mode
Short Term Emergent Repair of Existing Road of Umagaon to Kaluahi Section of NH-227L from Existing Km 0.000 to Km. 20.500 in the State of Bihar
URGENT REPAIRS TO THE DAMAGED STRETCHES OF EXISTING CARRIAGEWAYDUE TO NIVAR AND BUREVI CYCLONE FROM KM 1.600 TO KM 80.133 ON NAGAPATTINAM THANJAVUR SECTION OF NH 83
Repair and Maintenance of FOREST SECTIONS on Chhattisgarh and Maharashtra Border (Km.405.000) to Wainganga Bridge (Km.485.000) Section of NH-53 in the State of Maharashtra
Short Term Improvement and Routine Maintenance including Incident Management services for Vidisha Sagar Section NH 146 from Km. 81.000 to 187.600 in the State of Madhya Pradesh.
Routine Maintenance and Incident Management of Muzaffarpur -Darbhanga - Supaul Section of NH - 27 (East West Corridor) from Km. 0.000 to Km. 145.456 in the State of Bihar.
Emergency Repair works of existing carriageway of Bodhre-Dhule i.e. from Km.390.000 to Km.452.800 Section of NH-52 in the State of Maharashtra --2nd call
Appointment of Safety Consultant Lalitpur-Sagar-Lakhnadon from Km. 99.005 to Km. 415.089 Section of NH-26 on OMT Basis in the State of MP and UP
Routine/Rectification of defects and deficiency Six laning Varanasi- Aurangabad Section of NH - 2 from Km. 786.000 to Km. 978.400 in the State of Bihar (3rd Call).
Strengthening or Overlaying on six lane Jaipur Kishangarh highway from Km. 273.500 to Km. 363.885 section of NH 48 (length 90.385 km) in the state of Rajasthan
Dismantling and Erection Works of 33KV line /11 KV Line/LT Line /DSS due to Four Laning of NH-83 (Patna--Gaya-Dobhi Section) in Gaya District.
Routine Maintenance and Incident Management of Supaul -Araria - Purnea Section of NH -27 (East West Corridor) from Km. 156.456 to Km. 285.007 in the State of Bihar.
Repair work at risk and cost on Ahmedabad Godhra section of NH-47 from Km 04.200 to 122.420 in the state of Gujarat on item-rate contract
Hiring of vehicle for use of SD-II, WD-XIV(NH), PWD, Fatorda, Margao, Goa.
WARD 08 NH 52 ROAD PAR MUKHYMANTRI MACHUA SAMRADDHI YOJNANTARGAT SMART FISH PARLOUR NIRMAN KARYA
Construction of 33KV line using 100 Sq mm ACSR Conductor on 11 Mt long S T Poles from Wanpoh Grid to (1x10) MVA proposed receiving station at NHAI Tunnel at Ujroo
Design Engineering Supply Erection Testing and Commissioning for height raising of 220 kV S-C Chandil-Santhaldih transmission line of JUSNL crossing NH-32 at Km 149 under Bharatmala Project of NHAI on turnkey basis
Providing and Installation of open gym equipment in various parks in NH-1, NH-2 and NH-3 (DandE Block) Ward no.11and12, Faridabad
Flood Damage Repairs to Nh 516E from Km 75.000 to 84.00 of Rajamahendravaram - Vizianagaram road of NH 516E under (R&B) NH Division, Visakhapatnam
IRQP work of Hazaribag St. Columbas College More Churchu Hatyari More NH 33 Road Length 30.038Km Under RCD Road Division, Hazaribag for the Year 2021-22